OLIS Logbook
General
General, Page 26 of 26
Not logged in
List
|
Find
|
Select
|
Import
|
Login
|
Help
Full
| Summary |
Threaded
513 Entries
Goto page
Previous
1
,
2
,
3
...
24
,
25
, 26
ID
Date
Author
Type
Category
Subject
Text
501
Thu Nov 13 16:31:54 2014
Brian Minato
Other
Other
SIS
A new SIS source has been installed.
The oven has been loaded with Sodium Hydrogen
Carbonate (Alfa Aesar 10863) and Rubidium
502
Thu Nov 13 16:34:29 2014
Brian Minato
Other
Other
MCIS Update
The ethernet cable from the CPI TWT amplifier
has been temporarily moved to the Alga 50W
amplifier. The Alga had been experiencing
503
Tue Nov 18 08:56:23 2014
Brian Minato
Other
General
ALGA Update
There has been no noticeable loss of communication
to the ALGA 50watt amplifier. As a
test, the ethernet cable was removed for
504
Wed Nov 19 11:34:55 2014
Raymond Dube
Routine
General
OLIS Electrical diagram with 3 I.S.
I updated
the electrical Diagram for OLIS Faraday
Cage with 3 Ion Source, ref: ISK4586D rev.
505
Tue Nov 25 07:49:50 2014
Brian Minato
Other
General
MCIS and SIS Update
MCIS-
the Se was loaded into the oven last
friday (21st). During the weekend the
506
Tue Nov 25 12:23:28 2014
Keerthi Jayamanna
Routine
General
76Se+13 tune saved
141125_1159_OLIS_76Se+13.snap is saved
in reference directory.
El=3480/4303V
507
Wed Dec 17 13:17:13 2014
Brian Minato
Other
Other
MCIS Update
The MCIS was vented with nitrogen yesterday.
The Se oven was drawn back into the tuner.
It was removed with the tuner and blanked.
508
Mon Apr 20 08:09:03 2015
Brian Minato
Routine
General
OLIS Shutdown Update
The OLIS 1 week shutdown has been completed
(WP 2015-04-13-1).
General-
509
Wed Apr 29 07:48:22 2015
Brian Minato
Other
Other
Repair- Water leak inside HV cage
A water leak was reported inside the HV
cage (FR#8079). The cage was accessed
to determine the source of the leak (WP#I2015-04-27-1).
510
Thu May 21 09:15:48 2015
Brian Minato
Service of MCIS. Plasma chamber cleaned.
Repaired shorted, Right steering plate.
Added shields to help prevent coating of
511
Mon Sep 14 11:21:16 2015
Keerthi Jayamanna
Routine
General
20Ne+2 beam saved
20Ne+2 beam optics saved as 150914_1117_ios0iosfc6.snap
512
Wed Feb 22 21:46:27 2017
Keerthi Jayamanna
Elog is working now
Elog is now functioning. We can start entering
notes
513
Wed Feb 22 21:51:40 2017
Keerthi Jayamanna
SIS first beam is N1+1
Chris confirmed the first SIS beam would
be Na+1. Next Rb+1 and then Li+1
Goto page
Previous
1
,
2
,
3
...
24
,
25
, 26
ELOG V2.9.2-2455