M9sol Logbooks Solenoid Daily log
  Solenoid logbook, Page 2 of 15  ELOG logo
Entry  Wed Jun 14 10:35:30 2006, Willy Andersson, Quench Recovery, Switched to series cooling. 
Entry  Wed Jun 14 16:27:01 2006, Willy Andersson, Quench Recovery, Energized solenoid 
Entry  Thu Jul 20 11:01:09 2006, Willy Andersson, Quench Recovery, Opened up warm return valves CV151 and CV153 
Entry  Thu Jul 20 13:21:57 2006, Willy Andersson, Quench Recovery, started // warm return flow. 
Entry  Thu Jul 20 13:27:21 2006, Willy Andersson, Quench Recovery, cold return mode continues... 
Entry  Thu Jul 20 13:34:26 2006, Willy Andersson, Quench Recovery, cold return mode continues... 
Entry  Fri Jul 21 17:18:19 2006, Willy Andersson, Quench Recovery, Opened HIC142 fully open 
Entry  Wed Aug 9 06:44:58 2006, Willy Andersson, Quench Recovery, // cold mode cooling continues. 
Entry  Wed Aug 9 06:59:43 2006, Willy Andersson, Quench Recovery, more // cold return stuff 
Entry  Thu Aug 10 16:33:11 2006, Willy Andersson, Quench Recovery, Flow to solenoid tripped on powerlead temperature. 
Entry  Thu Aug 10 20:26:09 2006, Willy Andersson, Quench Recovery, solenoid energized 
Entry  Tue Aug 15 15:39:27 2006, Willy Andersson, Quench Recovery, switched to parallel cold return 
Entry  Thu Aug 17 19:45:27 2006, Willy Andersson, Quench Recovery, switch to series cooling 
Entry  Wed Oct 4 18:10:18 2006, Willy Andersson, Start Up, Quick check on system 
Entry  Thu Oct 12 11:53:04 2006, Willy Andersson, Quench Recovery, Compressor trip, 09:50 this morning. 
Entry  Thu Oct 12 19:54:10 2006, Willy Andersson, Quench Recovery, Energized solenoid. 
Entry  Thu Oct 26 04:27:31 2006, Willy Andersson, Quench Recovery, Powerlead overtemp 
Entry  Thu Oct 26 04:34:15 2006, Willy Andersson, Quench Recovery, Still in // cold return mode. 
Entry  Wed Nov 15 17:05:49 2006, Willy Andersson, Quench Recovery, powerleads cold, energizing solenoid 
Entry  Sat Oct 9 22:50:26 2004, Other, , power leads warmed 
ELOG V2.9.2-2455