M9sol Logbooks Solenoid Daily log
  Solenoid logbook  ELOG logo
Message ID: 139     Entry time: Thu Jul 20 11:01:09 2006
Author: Willy Andersson 
Operational Mode: Quench Recovery 
Subject: Opened up warm return valves CV151 and CV153 
Mu2 pressure was just about at trip point due to trapped volume of helium 
warming. So opened up warm returns to bleed off pressure and prevent it 
from rising.
ELOG V2.9.2-2455