M9sol Logbooks Solenoid Daily log
  Solenoid logbook  ELOG logo
Entry  Thu Oct 12 19:54:10 2006, Willy Andersson, Quench Recovery, Energized solenoid. 
    Reply  Fri Oct 13 00:13:57 2006, Experimentor, Quench Recovery, Energized solenoid. 
Message ID: 168     Entry time: Thu Oct 12 19:54:10 2006     Reply to this: 169
Author: Willy Andersson 
Operational Mode: Quench Recovery 
Subject: Energized solenoid. 
Switched to series mode about 6 hours ago. Cooling continued including 
power leads until LHe level at about 50% and powerleads appeared stable.
ELOG V2.9.2-2455