20
Sun May 15 13:07:12 2011
JB
W detector V-I curve
York W detector 2635-19
1037um
21
Mon May 16 21:14:19 2011
Jamie Brown
Broken solder on PD2
As you can see...
22
Tue May 17 12:32:13 2011
Jamie Brown
Thick carbon target
The thick carbon target, to be used for
background runs for the thick CH2 measurement
was supplied by Marek.
23
Wed May 18 08:54:08 2011
Alex Murphy
Photodiode data from target thickness measurements
In attachment are the peak position
in the photodiodes (with high gain setting)
for the target thickness measurements.
24
Wed May 18 08:58:53 2011
Alex Murphy
Foil energy losses
I've analysed
data from runs 4 to 12, which were the alpha
25
Wed May 18 09:09:02 2011
Alison Laird
Status update
Wednesday morning:
4 new windows were tested last night.
2 very good.
26
Fri May 20 05:47:08 2011
Tom Davinson
3.25MeV/u 21Ne(5+)
27
Sat May 21 18:25:36 2011
Jamie Brown
Beam spot
28
Sun May 22 11:45:03 2011
Tom Davinson
4.11MeV/u 21Ne(5+)
29
Mon May 23 02:12:14 2011
Brian
Routine
Start of Run summary
Handover from last shift was...
1. Running at 4.11 MeV/u at about
15enA (5+)
30
Mon May 23 02:16:32 2011
Jamie Brown
End of run summary
Plan for shift was to increase trigger
thresholds on S2-1 and S2-2 to cut out the
low energy "stuff" which is dominating
33
Tue May 24 00:01:03 2011
Oliver and Hicham
Routine
end of shift summary
Things have been running smoothly from
4 pm to midnight.
Reading in FC0 = 120-130 epA
35
Tue May 24 01:47:17 2011
Anonymous
Shift schedule, as of 1am Tuesday 24th
42
Wed May 25 22:45:42 2011
Jamie Brown
Leakage current in S2-1
At approximately 7pm, noted that trigger
rate in S2-1 had dropped by factor of ~20.
Detector had tripped off due to leakage current
43
Thu May 26 00:15:18 2011
Hicham and Sarah
Routine
End of run summary
still running at 3.98 MeV/u
19:08
S2-1 had tripped off due to leakge
45
Thu May 26 12:53:48 2011
Jamie Brown
H2 fill and vent procedures
Please note that these procedures are not
perfect and other small operations not listed
may need to be carried out. Some mistakes
48
Fri May 27 14:24:00 2011
Tom Davinson
S1287 data transfer
S1287 data files R1_*.gz to R100_*.gz transferred
from directory
51
Sat May 28 10:07:44 2011
Jamie Brown, and Mike Bentley
Plan for last day
1) PD run with gas (250Torr) - done
2) Pump down to 50 Torr - done
3) PD run - done
52
Mon Jun 20 05:58:21 2011
Jamie Brown
Run log
Attached is a spreadsheet summarizing all
the run information from the experiment.
53
Tue Jun 21 02:58:31 2011
Jamie Brown
Run Books 13 and 14
Attached. Book 13 is split into 4 sections
as otherwise the file is too big for the
elog to accept.