ID |
Date |
Author |
Type |
Category |
Subject |
Text |
 |
20
|
Sun May 15 13:07:12 2011 |
JB | | | W detector V-I curve | York W detector 2635-19
1037um |
|
21
|
Mon May 16 21:14:19 2011 |
Jamie Brown | | | Broken solder on PD2 | As you can see... |
|
22
|
Tue May 17 12:32:13 2011 |
Jamie Brown | | | Thick carbon target | The thick carbon target, to be used for
background runs for the thick CH2 measurement
was supplied by Marek. |
|
23
|
Wed May 18 08:54:08 2011 |
Alex Murphy | | | Photodiode data from target thickness measurements | In attachment are the peak position
in the photodiodes (with high gain setting)
for the target thickness measurements. |
|
24
|
Wed May 18 08:58:53 2011 |
Alex Murphy | | | Foil energy losses | I've analysed
data from runs 4 to 12, which were the alpha |
|
25
|
Wed May 18 09:09:02 2011 |
Alison Laird | | | Status update | Wednesday morning:
4 new windows were tested last night.
2 very good. |
|
26
|
Fri May 20 05:47:08 2011 |
Tom Davinson | | | 3.25MeV/u 21Ne(5+) | |
|
27
|
Sat May 21 18:25:36 2011 |
Jamie Brown | | | Beam spot | |
|
28
|
Sun May 22 11:45:03 2011 |
Tom Davinson | | | 4.11MeV/u 21Ne(5+) | |
|
29
|
Mon May 23 02:12:14 2011 |
Brian | Routine | | Start of Run summary | Handover from last shift was...
1. Running at 4.11 MeV/u at about
15enA (5+) |
|
30
|
Mon May 23 02:16:32 2011 |
Jamie Brown | | | End of run summary | Plan for shift was to increase trigger
thresholds on S2-1 and S2-2 to cut out the
low energy "stuff" which is dominating |
|
33
|
Tue May 24 00:01:03 2011 |
Oliver and Hicham | Routine | | end of shift summary | Things have been running smoothly from
4 pm to midnight.
Reading in FC0 = 120-130 epA |
|
35
|
Tue May 24 01:47:17 2011 |
Anonymous | | | Shift schedule, as of 1am Tuesday 24th | |
|
42
|
Wed May 25 22:45:42 2011 |
Jamie Brown | | | Leakage current in S2-1 | At approximately 7pm, noted that trigger
rate in S2-1 had dropped by factor of ~20.
Detector had tripped off due to leakage current |
|
43
|
Thu May 26 00:15:18 2011 |
Hicham and Sarah | Routine | | End of run summary | still running at 3.98 MeV/u
19:08
S2-1 had tripped off due to leakge |
|
45
|
Thu May 26 12:53:48 2011 |
Jamie Brown | | | H2 fill and vent procedures | Please note that these procedures are not
perfect and other small operations not listed
may need to be carried out. Some mistakes |
 |
48
|
Fri May 27 14:24:00 2011 |
Tom Davinson | | | S1287 data transfer |
S1287 data files R1_*.gz to R100_*.gz transferred
from directory
|
|
51
|
Sat May 28 10:07:44 2011 |
Jamie Brown, and Mike Bentley | | | Plan for last day | 1) PD run with gas (250Torr) - done
2) Pump down to 50 Torr - done
3) PD run - done |
|
52
|
Mon Jun 20 05:58:21 2011 |
Jamie Brown | | | Run log | Attached is a spreadsheet summarizing all
the run information from the experiment. |
|
53
|
Tue Jun 21 02:58:31 2011 |
Jamie Brown | | | Run Books 13 and 14 | Attached. Book 13 is split into 4 sections
as otherwise the file is too big for the
elog to accept. |
    |