Tuda logbooks General E1104 ISACII E1195 E1103 E1147 S1287 S1203 S1233 S1284 S1447 23Na(a,p) S1540 S1381  S1847 Catania
  S1287, Page 3 of 4  ELOG logo
Entry  Sun May 15 13:07:12 2011, JB, , , W detector V-I curve W_detector_V-I_curve.png
York W detector 2635-19
1037um
Entry  Mon May 16 21:14:19 2011, Jamie Brown, , , Broken solder on PD2 PD2-broken_solder.png
As you can see...
Entry  Tue May 17 12:32:13 2011, Jamie Brown, , , Thick carbon target 
The thick carbon target, to be used for background runs for the thick CH2 measurement was supplied by Marek.
He measured it to be 120um thick (with a micrometer), and says it's low density carbon (1.03g/cm3).
 
Entry  Wed May 18 08:54:08 2011, Alex Murphy, , , Photodiode data from target thickness measurements pdruns.xls
 In attachment are the peak position in the photodiodes (with high gain setting) for the target thickness measurements.
Entry  Wed May 18 08:58:53 2011, Alex Murphy, , , Foil energy losses 
I've analysed data from runs 4 to 12, which were the alpha irradiations
of PD1 and PD3 through the foils.
Time, 'target', which PD is being irradiated.
Entry  Wed May 18 09:09:02 2011, Alison Laird, , , Status update 
 Wednesday morning:
4 new windows were tested last night. 2 very good.
Now venting to install and test Faraday cup, install and test camera.
Entry  Fri May 20 05:47:08 2011, Tom Davinson, , , 3.25MeV/u 21Ne(5+) 22.grab.y17428.png
 
Entry  Sat May 21 18:25:36 2011, Jamie Brown, , , Beam spot DSC05470.JPG
 
Entry  Sun May 22 11:45:03 2011, Tom Davinson, , , 4.11MeV/u 21Ne(5+) 30.grab.h25527.png
 
Entry  Mon May 23 02:12:14 2011, Brian, Routine, , Start of Run summary 
Handover from last shift was...
1. Running at 4.11 MeV/u at about 15enA (5+)
2. Would like to take more beam but already at situation where deadtime about 50%.  They have been raising thresholds on the inner strips
Entry  Mon May 23 02:16:32 2011, Jamie Brown, , , End of run summary 
Plan for shift was to increase trigger thresholds on S2-1 and S2-2 to cut out the low energy "stuff" which is dominating our trigger rate,
and preventing us from increasing the beam current. S2-1 thresholds were at 10mV and S2-2 at 25 and 30mV.
Entry  Tue May 24 00:01:03 2011, Oliver and Hicham, Routine, , end of shift summary 
Things have been running smoothly from 4 pm to midnight.
Reading in FC0 = 120-130 epA
Total trigger (accepted trigger) = 7500 (4000) Hz
Entry  Tue May 24 01:47:17 2011, Anonymous, , , Shift schedule, as of 1am Tuesday 24th Screenshot.png
 
Entry  Wed May 25 22:45:42 2011, Jamie Brown, , , Leakage current in S2-1 
At approximately 7pm, noted that trigger rate in S2-1 had dropped by factor of ~20. Detector had tripped off due to leakage current reaching 8uA - spotting
this was delayed as camera (or web-browser) monitoring currents had frozen. Current trip point has been increased to 12uA, and the beam intensity lowered
to try to preserve the detector through out the night.
Entry  Thu May 26 00:15:18 2011, Hicham and Sarah, Routine, , End of run summary 
still running at 3.98 MeV/u
19:08
S2-1 had tripped off due to leakge current going above 8uA
Entry  Thu May 26 12:53:48 2011, Jamie Brown, , , H2 fill and vent procedures H2_filling_procedure.pdfH2_venting_procedure.pdf
Please note that these procedures are not perfect and other small operations not listed may need to be carried out. Some mistakes may still exist in
these procedures which could introduce significant risk if not spotted and corrected during the process. These should only be carried out by people confident
they understand the system and the purpose of each step, giving due consideration to each step to ensure it is appropriate and safe.
Entry  Fri May 27 14:24:00 2011, Tom Davinson, , , S1287 data transfer 

S1287 data files R1_*.gz to R100_*.gz transferred from directory
tuda2:/data2/data/S1287 to directory tuda3:/data3/data/S1287
Entry  Sat May 28 10:07:44 2011, Jamie Brown, and Mike Bentley, , , Plan for last day 
1) PD run with gas (250Torr) - done
2) Pump down to 50 Torr - done
3) PD run - done
Entry  Mon Jun 20 05:58:21 2011, Jamie Brown, , , Run log run_log.xls
Attached is a spreadsheet summarizing all the run information from the experiment.
Entry  Tue Jun 21 02:58:31 2011, Jamie Brown, , , Run Books 13 and 14 tuda_book13_1-47.pdftuda_book13_48-95.pdftuda_book13_96-143.pdftuda_book13_144-191.pdftuda_book14.pdf
Attached. Book 13 is split into 4 sections as otherwise the file is too big for the elog to accept.
ELOG V2.9.2-2455