  S1287, Page 2 of 4  ELOG logo
  ID Date Author Type Category Subject Text Attachments
  41   Wed May 25 18:05:55 2011 Mike BentleyRoutineGeneralReport on day shift and changed energy - now at 3.98 MeV/u All ran smoothly.
As a test, ran for a short period
at 1200 midday to run without S2-2 in the
 photo.png 
  40   Wed May 25 07:09:17 2011 BrianRoutineGeneralEnd of run summary (yes, a bit early, but done all I can think of!)Running status
Everything seems to be running OK. 
ADC and TDC spectra look OK.  Chamber
  
  39   Wed May 25 03:15:44 2011 BrianRoutineGeneralStart of run summary and TDC problemsSummary at start of run
Read through the runbook and end
of run summar and the situation appears to
  
  38   Tue May 24 23:59:16 2011 Jennifer Fallis, Lars MartinRoutineGeneralShift summaryBuncher problem was resolved around 22:00
(driver module needed to be replaced).
Checked current on FC0 and trigger rate,
  
  37   Tue May 24 20:45:12 2011 Mike BentleyOtherGeneralUpdate for during the day 24th May, wednesday Update: 
W decided at 8.00 to stop, check
the tune, retune and get back going. This
 photo-7.pngphoto-8.png 
  36   Tue May 24 08:18:23 2011 Mike BentleyRoutineGeneralend of shift summary We have been running smoothly all
night. Only problem is that the DAQ occasionally
does not start properly after a stop-go.
  
  35   Tue May 24 01:47:17 2011 Anonymous  Shift schedule, as of 1am Tuesday 24th   Screenshot.png 
  34   Tue May 24 01:16:37 2011 Tom DavinsonRoutineGeneralRe: End of Shift summary
1.TDCs. We have been sorting offline, and
we have now established that between run
  
  33   Tue May 24 00:01:03 2011 Oliver and HichamRoutine end of shift summaryThings have been running smoothly from
4 pm to midnight.
Reading in FC0 = 120-130 epA
  
  32   Mon May 23 15:58:30 2011 Mike BentleyRoutineGeneralEnd of Shift summary OK - summary of events during this
shift.
 
  
  31   Mon May 23 09:59:23 2011 Mike BentleyRoutineGeneralEnd/Dtart of Run Summary (BRF/MAB)Ran all night OK, currently 14epA, H2 stable,
DAQ stable
ISSUES:
  
  30   Mon May 23 02:16:32 2011 Jamie Brown  End of run summaryPlan for shift was to increase trigger
thresholds on S2-1 and S2-2 to cut out the
low energy "stuff" which is dominating
  
  29   Mon May 23 02:12:14 2011 BrianRoutine Start of Run summaryHandover from last shift was...
1. Running at 4.11 MeV/u at about
15enA (5+)
  
  28   Sun May 22 11:45:03 2011 Tom Davinson  4.11MeV/u 21Ne(5+)   30.grab.h25527.png 
  27   Sat May 21 18:25:36 2011 Jamie Brown  Beam spot   DSC05470.JPG 
  26   Fri May 20 05:47:08 2011 Tom Davinson  3.25MeV/u 21Ne(5+)   22.grab.y17428.png 
  25   Wed May 18 09:09:02 2011 Alison Laird  Status update Wednesday morning:
4 new windows were tested last night.
2 very good.
  
  24   Wed May 18 08:58:53 2011 Alex Murphy  Foil energy lossesI've analysed
data from runs 4 to 12, which were the alpha
  
  23   Wed May 18 08:54:08 2011 Alex Murphy  Photodiode data from target thickness measurements In attachment are the peak position
in the photodiodes (with high gain setting)
for the target thickness measurements.
 pdruns.xls 
  22   Tue May 17 12:32:13 2011 Jamie Brown  Thick carbon targetThe thick carbon target, to be used for
background runs for the thick CH2 measurement
was supplied by Marek.
  