41
|
Wed May 25 18:05:55 2011 |
Mike Bentley | Routine | General | Report on day shift and changed energy - now at 3.98 MeV/u | All ran smoothly.
As a test, ran for a short period
at 1200 midday to run without S2-2 in the |
|
40
|
Wed May 25 07:09:17 2011 |
Brian | Routine | General | End of run summary (yes, a bit early, but done all I can think of!) | Running status
Everything seems to be running OK.
ADC and TDC spectra look OK. Chamber |
|
39
|
Wed May 25 03:15:44 2011 |
Brian | Routine | General | Start of run summary and TDC problems | Summary at start of run
Read through the runbook and end
of run summar and the situation appears to |
|
38
|
Tue May 24 23:59:16 2011 |
Jennifer Fallis, Lars Martin | Routine | General | Shift summary | Buncher problem was resolved around 22:00
(driver module needed to be replaced).
Checked current on FC0 and trigger rate, |
|
37
|
Tue May 24 20:45:12 2011 |
Mike Bentley | Other | General | Update for during the day 24th May, wednesday | Update:
W decided at 8.00 to stop, check
the tune, retune and get back going. This |
|
36
|
Tue May 24 08:18:23 2011 |
Mike Bentley | Routine | General | end of shift summary | We have been running smoothly all
night. Only problem is that the DAQ occasionally
does not start properly after a stop-go. |
|
35
|
Tue May 24 01:47:17 2011 |
Anonymous | | | Shift schedule, as of 1am Tuesday 24th | |
|
34
|
Tue May 24 01:16:37 2011 |
Tom Davinson | Routine | General | Re: End of Shift summary |
1.TDCs. We have been sorting offline, and
we have now established that between run |
|
33
|
Tue May 24 00:01:03 2011 |
Oliver and Hicham | Routine | | end of shift summary | Things have been running smoothly from
4 pm to midnight.
Reading in FC0 = 120-130 epA |
|
32
|
Mon May 23 15:58:30 2011 |
Mike Bentley | Routine | General | End of Shift summary | OK - summary of events during this
shift.
|
|
31
|
Mon May 23 09:59:23 2011 |
Mike Bentley | Routine | General | End/Dtart of Run Summary (BRF/MAB) | Ran all night OK, currently 14epA, H2 stable,
DAQ stable
ISSUES: |
|
30
|
Mon May 23 02:16:32 2011 |
Jamie Brown | | | End of run summary | Plan for shift was to increase trigger
thresholds on S2-1 and S2-2 to cut out the
low energy "stuff" which is dominating |
|
29
|
Mon May 23 02:12:14 2011 |
Brian | Routine | | Start of Run summary | Handover from last shift was...
1. Running at 4.11 MeV/u at about
15enA (5+) |
|
28
|
Sun May 22 11:45:03 2011 |
Tom Davinson | | | 4.11MeV/u 21Ne(5+) | |
|
27
|
Sat May 21 18:25:36 2011 |
Jamie Brown | | | Beam spot | |
|
26
|
Fri May 20 05:47:08 2011 |
Tom Davinson | | | 3.25MeV/u 21Ne(5+) | |
|
25
|
Wed May 18 09:09:02 2011 |
Alison Laird | | | Status update | Wednesday morning:
4 new windows were tested last night.
2 very good. |
|
24
|
Wed May 18 08:58:53 2011 |
Alex Murphy | | | Foil energy losses | I've analysed
data from runs 4 to 12, which were the alpha |
|
23
|
Wed May 18 08:54:08 2011 |
Alex Murphy | | | Photodiode data from target thickness measurements | In attachment are the peak position
in the photodiodes (with high gain setting)
for the target thickness measurements. |
|
22
|
Tue May 17 12:32:13 2011 |
Jamie Brown | | | Thick carbon target | The thick carbon target, to be used for
background runs for the thick CH2 measurement