  41  
 | 
Wed May 25 18:05:55 2011 | 
Mike Bentley | Routine | General | Report on day shift and changed energy - now at 3.98 MeV/u |  All ran smoothly.
 
As a test, ran for a short period 
at 1200 midday to run without S2-2 in the | 
    | 
| 
  40  
 | 
Wed May 25 07:09:17 2011 | 
Brian | Routine | General | End of run summary (yes, a bit early, but done all I can think of!) | Running status
 
Everything seems to be running OK.  
ADC and TDC spectra look OK.  Chamber | 
   | 
| 
  39  
 | 
Wed May 25 03:15:44 2011 | 
Brian | Routine | General | Start of run summary and TDC problems | Summary at start of run
 
Read through the runbook and end 
of run summar and the situation appears to | 
   | 
| 
  38  
 | 
Tue May 24 23:59:16 2011 | 
Jennifer Fallis, Lars Martin | Routine | General | Shift summary | Buncher problem was resolved around 22:00 
(driver module needed to be replaced).
 
Checked current on FC0 and trigger rate, | 
   | 
| 
  37  
 | 
Tue May 24 20:45:12 2011 | 
Mike Bentley | Other | General | Update for during the day 24th May, wednesday |  Update: 
 
W decided at 8.00 to stop, check 
the tune, retune and get back going. This | 
     | 
| 
  36  
 | 
Tue May 24 08:18:23 2011 | 
Mike Bentley | Routine | General | end of shift summary |  We have been running smoothly all 
night. Only problem is that the DAQ occasionally 
does not start properly after a stop-go. | 
   | 
| 
  35  
 | 
Tue May 24 01:47:17 2011 | 
Anonymous |   |   | Shift schedule, as of 1am Tuesday 24th |   | 
    | 
| 
  34  
 | 
Tue May 24 01:16:37 2011 | 
Tom Davinson | Routine | General | Re: End of Shift summary | 
 
1.TDCs. We have been sorting offline, and 
we have now established that between run | 
   | 
| 
  33  
 | 
Tue May 24 00:01:03 2011 | 
Oliver and Hicham | Routine |   | end of shift summary | Things have been running smoothly from 
4 pm to midnight.
 
Reading in FC0 = 120-130 epA | 
   | 
| 
  32  
 | 
Mon May 23 15:58:30 2011 | 
Mike Bentley | Routine | General | End of Shift summary |  OK - summary of events during this 
shift.
 
  | 
   | 
| 
  31  
 | 
Mon May 23 09:59:23 2011 | 
Mike Bentley | Routine | General | End/Dtart of Run Summary (BRF/MAB) | Ran all night OK, currently 14epA, H2 stable, 
DAQ stable
 
ISSUES: | 
   | 
| 
  30  
 | 
Mon May 23 02:16:32 2011 | 
Jamie Brown |   |   | End of run summary | Plan for shift was to increase trigger 
thresholds on S2-1 and S2-2 to cut out the 
low energy "stuff" which is dominating | 
   | 
| 
  29  
 | 
Mon May 23 02:12:14 2011 | 
Brian | Routine |   | Start of Run summary | Handover from last shift was...
 
1. Running at 4.11 MeV/u at about 
15enA (5+) | 
   | 
| 
  28  
 | 
Sun May 22 11:45:03 2011 | 
Tom Davinson |   |   | 4.11MeV/u 21Ne(5+) |   | 
    | 
| 
  27  
 | 
Sat May 21 18:25:36 2011 | 
Jamie Brown |   |   | Beam spot |   | 
    | 
| 
  26  
 | 
Fri May 20 05:47:08 2011 | 
Tom Davinson |   |   | 3.25MeV/u 21Ne(5+) |   | 
    | 
| 
  25  
 | 
Wed May 18 09:09:02 2011 | 
Alison Laird |   |   | Status update |  Wednesday morning:
 
4 new windows were tested last night. 
2 very good. | 
   | 
| 
  24  
 | 
Wed May 18 08:58:53 2011 | 
Alex Murphy |   |   | Foil energy losses | I've analysed 
data from runs 4 to 12, which were the alpha | 
   | 
| 
  23  
 | 
Wed May 18 08:54:08 2011 | 
Alex Murphy |   |   | Photodiode data from target thickness measurements |  In attachment are the peak position 
in the photodiodes (with high gain setting) 
for the target thickness measurements. | 
    | 
| 
  22  
 | 
Tue May 17 12:32:13 2011 | 
Jamie Brown |   |   | Thick carbon target | The thick carbon target, to be used for 
background runs for the thick CH2 measurement 
was supplied by Marek. | 
   |