Entry  Fri Jan 11 06:56:01 2013, Jessica Tomlinson, Other, General, multiplicities, hit patterns and good hits in an event 411mev-multiplicities-and-hitpat.pdf
I have attached a pdf of a series of slides with some multiplicity and hit pattern plots on, also a list of cuts. As well as this I looked at how many
'good hits' (explained in pdf) I am getting per event.
Before Christmas I found that the code was not clearing the raw arrays read in by MIDAS and so unless a new piece of data filled the array channel
Entry  Tue May 24 00:01:03 2011, Oliver and Hicham, Routine, , end of shift summary 
Things have been running smoothly from 4 pm to midnight.
Reading in FC0 = 120-130 epA
Total trigger (accepted trigger) = 7500 (4000) Hz
Entry  Tue May 24 08:18:23 2011, Mike Bentley, Routine, General, end of shift summary 
 We have been running smoothly all night. Only problem is that the DAQ occasionally does not start properly after a stop-go. The dead-time goes
to nearly 100%. This happened twice in the night,. and a second stop-go did the trick. Needs looking at.
 
Entry  Tue Dec 4 05:40:10 2012, Jessica Tomlinson, Other, Other, analysis - single strip E vs t  6x
 I have attached some single strip energy vs time plots to show that the structure seen in the collective E vs t plots is in each strip. 
Attachments 1 and 2 show two different strips in S2-2 with no cuts. You can see that the 3 loci are different to one another in the single strips
as well as in the combined S2-2 E vs t plot shown in attachment 3. Attachement 3 is plotted after applying the following cuts: equal energy in the front
Entry  Sat May 7 17:29:13 2011, JB, , , Window leak tests on TUDA window2-leaktest.png
Attached plot shows rate of pressure increase in ~2l volume upstream of TUDA with Ni window #2 installed on reentrant flange. Comparison between
a)pumping out TUDA and 2l volume, and
b) filling TUDA with ~340mbar of He and pumping out 2l volume.
Entry  Wed Apr 13 09:37:51 2011, Tom Davinson, , , Wednesday 13 April 3.png2.png4.png

09.20 TUDA2.PNG5 1.04E-06Torr
      See attachments 1 & 2 for EPICS log of pump down and overnight
Entry  Sun May 15 13:07:12 2011, JB, , , W detector V-I curve W_detector_V-I_curve.png
York W detector 2635-19
1037um
Entry  Tue May 24 20:45:12 2011, Mike Bentley, Other, General, Update for during the day 24th May, wednesday photo-7.pngphoto-8.png
 Update: 
W decided at 8.00 to stop, check the tune, retune and get back going. This has nearly, finished but it is a very long process indeed - note for
future - this takes AT LEAST 12 hours, if one is systematic about it.
Entry  Tue Apr 12 11:21:38 2011, Tom Davinson, , , Tuesday 12 April  1.png
The TUDA @ ISAC-II grounding test was successfully completed this am
per work permit 2011-04-12-2.
Entry  Thu May 5 11:31:13 2011, JB, , , Tom's ToDo List 
 


Version 2 of ...

- re-test
chamber/coolant loop with vacuum cycle - done
- install MSL Type W preamp - done
- to adjust position of support ring, temporarily loosen
Entry  Thu Apr 14 10:06:34 2011, Tom Davinson, , , Thursday 14 April 1.png5.png

10.02 See attachment 1 for overnight EPICS log of TUDA2.CG5
      Downstream flange secured by four bolts
Entry  Thu May 26 23:46:40 2011, Sarah and Brian, Routine, General, Thu 16:00-00:00 summary 
Run139

Started 19:05:03
Entry  Thu May 26 02:54:10 2011, Derek and Naomi, Routine, General, Thu 0-8am shift summary 
 
For run 123:
Beam outage for ~15 min but not stopping run.
Entry  Tue May 17 12:32:13 2011, Jamie Brown, , , Thick carbon target 
The thick carbon target, to be used for background runs for the thick CH2 measurement was supplied by Marek.
He measured it to be 120um thick (with a micrometer), and says it's low density carbon (1.03g/cm3).
 
Entry  Sat Apr 9 11:35:14 2011, Tom Davinson, , , TUDA configuration & setup GasTUDA-7.png

Nominal detector configuration for S1287 is as follows:
Entry  Sun Apr 17 09:47:04 2011, Tom Davinson, , , Sunday 17 April He_test.png
Continuation of yesterday's test with c. 300mBar of He
in the TUDA chamber.
Entry  Wed May 18 09:09:02 2011, Alison Laird, , , Status update 
 Wednesday morning:
4 new windows were tested last night. 2 very good.
Now venting to install and test Faraday cup, install and test camera.
Entry  Wed May 25 03:15:44 2011, Brian, Routine, General, Start of run summary and TDC problems 
Summary at start of run
Read through the runbook and end of run summar and the situation appears to be:
1. The check of the tune showed it was OK, although a bit of beam (or halo) clipping 4mm collimator
Entry  Mon May 23 02:12:14 2011, Brian, Routine, , Start of Run summary 
Handover from last shift was...
1. Running at 4.11 MeV/u at about 15enA (5+)
2. Would like to take more beam but already at situation where deadtime about 50%.  They have been raising thresholds on the inner strips
Entry  Fri May 6 06:03:00 2011, Tom Davinson, , , Sort programs, spectra titles & calibration procedure 
A summary of online sort programs can be found at:

~/S1287/sort/README
ELOG V2.9.2-2455