Friday, January 24, 2020, 16:01, Anders Mjos, , , , , , , Problems/Solutions, Upgrading BIAS Power Supply
|
Anders Mjos wrote:
A new power supply was installed today by John Chow. Due to differences in pin configuration of the |
Tuesday, August 28, 2012, 16:57, Aurelia Laxdal, , HP-FEBIAD, ITE, TM4, , , In progress, Updates for NiO#1 at Test Stand
|
Tested the power supplies and locked up the HV cage.
Turned on the HV: 30kV.
Tomorrow we'll start up the heaters: 580A for the target and 280-300A for the tube. |
Thursday, January 21, 2021, 10:55, Fernando Maldonado, , , , , , , Done, Updated Good Vac value for TSG:IG1
|
On Tuesday the hard good vacuum level was changed from 7e-6 T to 1e-5 T to allow larger leak rates when testing FEBIAD.
Also this new level should allow faster heating rates (be mindful and cautious)
Work done as per WP C2021-01-19-9 |
Monday, July 13, 2020, 14:52, Aaron Schmidt, , LP-FEBIAD, , , 41790-9, 43515-2, , UCx HS conditioning.
|
Broken LP-FEBIAD used to out gas.
Monday, July 13, 2020, 14:52: Roughing.
Monday, July 13, 2020, 15:29: Turbo pumps on. |
Tuesday, August 04, 2020, 15:07, Aaron Schmidt, UCx, LP-SIS, , , 44139-10, 43515-4, In progress, UCx HS conditioning with PEEK assembly
|
Tuesday, August 04, 2020, 15:04: Roughing.
Wednesday, August 05, 2020, 06:08: Turbo pumps on.
Thursday, August 06, 2020, 06:58: Vacuum @ 1.52e-06T |
Tuesday, August 11, 2020, 12:04, Aaron Schmidt, UCx, LP-SIS, , , 44139-10, 43515-4, In progress, UCx HS conditioning with PEEK assembly
|
HS target leg openings were milled. Short from previous test by the look of it. TBHT insulator on source side is cracked.
Wiring up top adjusted for better clearance. EE (K) Cap appears ok.
Tuesday, August 11, 2020, 12:03: Roughing. |
Wednesday, June 02, 2021, 10:45, Aaron Schmidt, UC#34 HS, LP-SIS, , TM2, 43044-13, 44378-1, In progress, UC#34 HS conditioning
|
Straight tube target / TGHT for outgassing.
Wednesday, June 02, 2021, 11:06: Roughing.
Wednesday, June 02, 2021, 12:15: TP1B on. |
Wednesday, May 26, 2021, 14:29, Aaron Schmidt, UC#33 (HS), LP-SIS, ITW, TM2, , 44378-3, In progress, UC#33 HS conditioning
|
HS waterlines were very tight to line up.
Wednesday, May 26, 2021, 14:29: Roughing.
Wednesday, May 26, 2021, 15:09: TP1B on. |
Monday, September 08, 2014, 16:23, Anders Mjos, UC#11, , , TM4, 40282-5, , Done, UC#11 Heat Shield Conditioning
|
T/C installed
CH 1: Attached to TGHT outside middle
CH 2: Through HS outside TGHT right |
Friday, July 18, 2014, 11:30, Anders Mjos, UC#10, LP-SIS, ITE, TM4, 40282-5, 40316-1, Done, UC#10 Heat Shield Conditioning
|
Friday, July 18, 2014, 11:30: Roughing
Friday, July 18, 2014, 11:51: Starting turbos
Friday, July 18, 2014, 11:59: Turbos at speed. |
Tuesday, May 15, 2012, 08:08, Rick Maharaj, sic#27, , , , , , , Turbos off
|
Target needs to be removed form teststand to remove heatshielding around target oven. The chamber will be vented, water circuits flushed and target removed. |
Tuesday, January 15, 2013, 16:10, Anders Mjos, RFQ empty, , , , , , , Turbos off
|
Sebastian Raeder wrote:
Start cooling of Target RFQ empty |
Tuesday, May 21, 2013, 15:14, Rick Maharaj, CTL Febiad, , , , , , , Turbos Started
|
Turbos started |
Tuesday, July 10, 2012, 16:01, Anders Mjos, , , , , , , Problems/Solutions, Turbo replaced - cleaning chamber recommended
|
A new turbo has been installed. Eddie said the other one had crashed but not catastrophically. He recommends the test stand
be wiped clean before pumping because there is a fine layer of Aluminum dust on the chamber base.
|
Tuesday, July 19, 2016, 15:15, Aaron Schmidt, , , , , , 41751-7, , Tube only - No EE - With PE
|
Tuesday, July 19, 2016, 15:14: Roughing.
Tuesday, July 19, 2016, 15:48: Turbo pumps started.
Tuesday, July 19, 2016, 15:55: Ion Gauge on. |
Monday, July 18, 2016, 12:20, Aaron Schmidt, , , , , , 41751-7, , Tube only - No EE - No PE
|
Monday, July 18, 2016, 12:19: Roughing.
Monday, July 18, 2016, 13:13: Turbo pumps on.
Monday, July 18, 2016, 13:18: Ion gauge on. |
Thursday, July 14, 2016, 13:22, Aaron Schmidt, , , , , , 41751-7, , Tube only - NEW EE w/insulators - No PE
|
Thursday, July 14, 2016, 14:41: Roughing started.
Thursday, July 14, 2016, 15:41: Turbo pumps started.
Thursday, July 14, 2016, 15:58: Ion gauge & RGA on. |
Monday, July 11, 2016, 13:51, Aaron Schmidt, , , , , , 41751-7, , Tube only - NEW EE w/insulators
|
Monday, July 11, 2016, 13:49: Begin roughing.
Normal
0
false
false
false
|
Friday, March 02, 2012, 08:53, Anders Mjos, FEBIAD test, , , , , , Problems/Solutions, Tube heater insulator glowing
|
The insulator for the tube heater was observed to be glowing with a blue shine when the target was on high voltage. The insulator was glowing
on the side closest to the 9-pin connector. See attached photo. |
Tuesday, March 06, 2018, 10:55, Carla Babcock, , , , , , , , Trying HV without electronics
|
I have removed the resistor/varistor combinations that go between the poles of the target and tube heaters, and between those two supplies. I tested
all the components to make sure they were still working after the sparks - for the record the varistors clamp at 23V, not 33V as implied by the schematic.
Tuesday, March 06, 2018, 10:48 BIAS/EE/EZL = 59.5/-1000/29.5 There was some kind of spark, the current on the bias supply went up to |
|