ID |
Date |
Author |
Target/No.# |
Source |
Station |
Module |
Target Oven W.O# |
Heat Shield W.O# |
Status |
Subject |
Text |
|
1032
|
Thursday, November 28, 2024, 13:47 |
Isaiah Rabuka | | | | | | | | | November 28, 2024 1:46PM
Checked in on sample in ATTS. |
|
1034
|
Tuesday, December 03, 2024, 15:49 |
Isaiah Rabuka | | | | | | | | | Tuesday,
December 03, 2024, 15:48 |
|
1035
|
Wednesday, December 04, 2024, 15:43 |
Isaiah Rabuka | | | | | | | | | Wednesday,
December 04, 2024, 15:42 Depressurized the |
|
1037
|
Thursday, December 05, 2024, 14:06 |
Isaiah Rabuka | | | | | | | | | Thursday, December 05, 2024, 14:05
Pressurized ATTS with argon, swapped out
samples, and repressurized and heated chamber. |
|
1039
|
Friday, December 06, 2024, 16:03 |
Isaiah Rabuka | | | | | | | | | Friday, December
06, 2024, 16:03 Heated and cooled a sample |
|
1040
|
Tuesday, December 10, 2024, 14:38 |
Isaiah Rabuka | | | | | | | | | Tuesday,
December 10, 2024, 14:38 Depressurized ATTS |
|
14
|
Wednesday, September 28, 2011, 14:11 |
Friedhelm Ames | SiC#26 | | ITE | TM4 | | | | gas system checked and pumped | The gas system has been checked. The variable
valve opens at about 7.55 very fast. Please
be careful when using it. Stepsize for opening |
|
29
|
Friday, January 20, 2012, 10:37 |
Friedhelm Ames | | | | | | | | vacuum pumps shut off | turbo pumps shut off due to work on
cooling water system |
|
30
|
Tuesday, January 24, 2012, 09:44 |
Friedhelm Ames | | | | | | | | turbo pumps restarted | All turbo pumps have been restarted after
cooling water is back and running.
|
|
31
|
Wednesday, February 08, 2012, 17:39 |
Friedhelm Ames | | | | | | | Failed | TSG:TP1B failure | Both turbo pumps at the source box were
found off. TSG:TP1A has been started normally.
TSG:TP1B does not spin up above 3KRPM even |
|
32
|
Wednesday, February 08, 2012, 18:16 |
Friedhelm Ames | | | | | | | Failed | TSG:TP1B and TSG:TP1A failure |
|
|
35
|
Monday, February 27, 2012, 17:39 |
Friedhelm Ames | | | | | | | In progress | target and tube heaters ramped up | ramping up target to 300 A and tube to
270 A |
|
41
|
Wednesday, February 29, 2012, 09:43 |
Friedhelm Ames | | | | | | | | checking gas inlet valve for FEBIAD | |
|
42
|
Wednesday, February 29, 2012, 15:08 |
Friedhelm Ames | | | | | | | | connected Al(CH3)3 | connected A(CH3)3 instead of He, pumped
line and valve with pump on the high voltage
rack.. Opened regulating valve first response |
|
43
|
Wednesday, February 29, 2012, 17:22 |
Friedhelm Ames | | | | | | | | mass scan | mass scan with valve at 7.2 to let in Al(CH3)3
saved as
plotdump-local-clean.txt_Feb29_12_17-19-20.txt
|
|
44
|
Wednesday, February 29, 2012, 17:26 |
Friedhelm Ames | | | | | | | | gas inlet valves closed | |
|
45
|
Thursday, March 01, 2012, 17:04 |
Friedhelm Ames | | | | | | | | new mass scan | bigger mass scan after separator optimization
and with finer step size
|
|
46
|
Thursday, March 01, 2012, 17:05 |
Friedhelm Ames | | | | | | | | start heater ramping down | |
|
47
|
Thursday, March 01, 2012, 17:09 |
Friedhelm Ames | | | | | | | | new mass scan |
|
|
48
|
Thursday, March 01, 2012, 17:10 |
Friedhelm Ames | | | | | | | | start ramping down of heaters | |
|