ID Date Authordown Target/No.# Source Station Module Target Oven W.O# Heat Shield W.O# Status Subject Text Attachments
  169   Monday, August 13, 2012, 14:56 Pierre Bricault      In progressFEBIAD testOne thing that seems to be strange regarding
this FEBIAD is the best results are without
any current in the coil.
  
  170   Thursday, August 16, 2012, 10:41 Pierre Bricault      In progressTest FEBIADRay is finishing the electrical modifications
for the FEBIAD with the biased cathode.
We found the source of the sparks.
  
  175   Friday, August 17, 2012, 08:30 Pierre Bricault      In progressFEBIAD test with cathode biasedYesterday Ray Dube has changed the configuration
in order to run the FEBIAD with the cathode
on negative bias.
  
  176   Friday, August 17, 2012, 10:09 Pierre Bricault      In progressFEBIAD test cathode biasBacking pressure on the bender section
is quite large. TMSIG6 reads 5.09E-7 T and
TMS:CG2B reads 0.249 T!
  
  177   Friday, August 17, 2012, 12:53 Pierre Bricault      Done Test completed.
exel file on My Documents in folder
FEBIAD Test Aout2012/TestFEBIAD
 TestFEBIAD.xlsx 
  58   Wednesday, March 07, 2012, 10:36 Paul Mocock       HV conditioning begins.HV conditioning has begins. Vacuum chamber
pressure is currently 3.2e-07 Torr on TSG:IG1.
  
  735   Saturday, June 22, 2019, 17:05 Luca Egoritip2n     DoneTest stand installationI opened the test stand because I forgot
to install tantalum heat shields around the
target. Everything was reinstalled as before
  
  744   Monday, July 08, 2019, 09:20 Luca Egoritip2n1 ITE   In progressp2n heating test(see entry 742)
 
p2n target heated over the weekend
 Capture.PNGCapture1.PNG 
  748   Sunday, July 28, 2019, 14:22 Luca EgoritiP2N - 1HP-FEBIADITETM2p2n - test1p2n - test1Problems/Solutionsp2n heating test 3Friday. July 26th 2019 
A new electrical configuration of
the test stand was decided and installed.
 20190728_-_p2n_heating_3.PNG 
  749   Tuesday, July 30, 2019, 12:19 Luca EgoritiP2N - 1HP-FEBIADITETM2  Problems/Solutionsp2n heating test - target inspectionThe p2n target was taken out of the test
stand for inspection. Comments and measurements
on the container below:
 IMG_20190730_110927.jpgIMG_20190730_113437.jpgIMG_20190730_105629.jpg 
  751   Wednesday, August 07, 2019, 08:18 Luca EgoritiP2N - 1 ITETM2  Problems/Solutionsp2n heating test 4Tuesday, August 06, 2019, 16:00
Start ramp up to 300+300 = 600 A
 
 IMG_20190806_182939.jpgIMG_20190806_182953.jpg 
  802   Wednesday, July 22, 2020, 08:56 Luca Egoriti P2N testHP-SISITETM4  In progressp2n heating test - electrical feedthrough configuration The electrical feedthroughs at the
top of the test stand module were reconfigured
to deliver up to 1200A to the p2n target.
 ISACteststand_TMwiring.pptxP2N-TestStand_20200722.pngP2N-TestStand_1200A.png 
  870   Wednesday, April 14, 2021, 10:21 Luca Egoriti P2N test - Apr 2021HP-SIS    In progress P2N test - Electrical reconfiguration Wednesday, April 14, 2021, 10:18
Work started to bring the ATTS PS
inside the ITS HV cage. HV grounding rod
 ITS_electrical_panel_-_removed.jpgResistance_matrix_2021-04-28.png 
  872   Wednesday, April 28, 2021, 22:34 Luca EgoritiP2N test - Apr 2021P2N-SISITETM4  In progressP2N heating test Wednesday, April 28, 2021, 22:30
First P2N heating test ongoing.
At P2NHT ~ 570 A and TBHT ~ 100 A
 Target_580A_100A_glowing.jpgInitial_rampup.PNG 
  924   Monday, May 09, 2022, 10:08 Luca Egoriti P2N-SISITETM4  In progressP2N heating testBeginning of May:
The cabling on the top of the test
stand was changed to adapt for P2N testing.
 2022-05-09_-_Voltage_event_during_rampup.PNG2022-05-09_-_Rampup_and_down.PNGIMG_20220509_111314.jpgITS_short_plasma_electrode_schematics.png 
  1   Wednesday, June 29, 2011, 15:30 John Wong       Testing Yield station elogABC 123 blah blah blah...   
  2   Wednesday, September 14, 2011, 15:33 John WongTest#1HP-SISITWTM1testtestIn progresstesting elog for test standWednesday, September 14, 2011, 15:33
blah blah blah...
  
  12   Monday, September 26, 2011, 14:56 John Wong      Problems/Solutions9-pin connectors swapped on source tray

    

       
            
 9-pin-connector.jpg 
  98   Thursday, May 17, 2012, 13:24 John WongSiC#27HP-SISITETM438817-3 Problems/SolutionsSolid residues found on EE Thursday, May 17, 2012, 13:15
After the test-stand, the EE was
removed for inspection.  It was discovered
 SiC#27_after_teststand.pdfSiC#27_clean_EE.pdf 
  1031   Thursday, November 28, 2024, 11:47 Isaiah Rabuka      In progressHeating Stage Pellet Testing and DevelopmentOpened the ATTS, placed what I will call
“Cast Alumina Sample #1” into
the ATTS and activated the roughing then
  