997
|
Tuesday, February 20, 2024, 14:22 |
Aaron Schmidt | | | | | | | | Set to Cathode BIAS Mode | Tuesday, February 20, 2024, 14:20: TS to wired to Cathode BIAS mode as per ISK4563D.
Monday, March 11, 2024, 13:59: Power supply polarity switched to negative. |
998
|
Monday, February 26, 2024, 10:24 |
Aaron Schmidt | | | | | | | Problems/Solutions | TMS:RP2 purge. TS exhaust clearing. + TMS:TP6 | Monday, February 26, 2024, 10:12:
While attempting to cycle FC0, noticed that the turbo pumps TMS:TP6 & TMS:TP2 were off, with TP2 being tripped off. The vacuum on TMS:CG2A sat around 0.825T although RP2 was running. The ballast plug has since been removed to allow for a 2 hour purge of the roughing pump.
Thursday, February 29, 2024, 13:10: Backing pressure still had not stabilized. RP2 removed & taken to Vacuum Group.
Wednesday, March 06, 2024, 10:28:
Tip seals were replaced by Vacuum Group. Roughing.
Wednesday, March 06, 2024, 10:31: TMS:TP6 & TMS:TP2 on.
Wednesday, March 06, 2024, 10:49: TP6 has tripped twice. TP2 ok.
Wednesday, March 06, 2024, 12:25: Venting. TP6 is not operating above 3 krpm.
Vacuum Group acquired TP6. It was nearly seized.
Wednesday, March 06, 2024, 14:57: Varian 551 pump installed from the furnace behind the TS. Roughing.
Friday, March 08, 2024, 06:58: Soft start initiated.
Friday, March 08, 2024, 08:47: TP6 at speed. |
1001
|
Tuesday, April 09, 2024, 15:28 |
Aaron Schmidt | | | | | | | | Set to Anode BIAS Mode & Old gas leak installed. | Switched to Anode mode on March 28 including polarity. The old calibrated leak was also re-installed. |
1003
|
Monday, April 15, 2024, 14:35 |
Aaron Schmidt | | | | | | | Problems/Solutions | TSH:EE Issues | Monday, April 15, 2024, 14:33: On Friday it was noted that the EE was being troublesome. If we put -500 V on the EE the PS would deliver -1000 V. However it would slowly trickle downward. elog:1002.
Tom H. had a look at it this afternoon & determined the PS is operating, however the signal going to it is peculiar. Controls group as been notified as well. Awaiting further response.
Tuesday, April 16, 2024, 16:09: Full epics & PLC restart needed. All TP & RP shut down.
Tuesday, April 16, 2024, 17:45: Restart RP. TP1B on. TP6 & TP2 on.
Tuesday, April 16, 2024, 17:49: TP1A on.
Tuesday, April 16, 2024, 17:55: Restarted TP6.
Tuesday, April 16, 2024, 18:05: Long sigh* TP6 was in soft start mode. Controller put back to regular start. TP6 started.
Tuesday, April 16, 2024, 18:08: IG1 & IG6 on.
Wednesday, April 17, 2024, 10:25: IG, TP, & RP, off.
Wednesday, April 17, 2024, 13:03: RP on.
Wednesday, April 17, 2024, 13:14: TP1A on.
Wednesday, April 17, 2024, 13:07: TP6, TP2, & TP1B on.
Wednesday, April 17, 2024, 13:23: IG6 & IG1 on.
Wednesday, April 17, 2024, 13:25: EE to -500V. Read back on Epics -500V. PS direct @ -500V
Wednesday, April 17, 2024, 13:26: EE to -1500V. Read back on Epics -1500V. PS direct @ -1500V
Wednesday, April 17, 2024, 14:07: EE was brought back to 0V. ISAC TS closed up & ready for operation.
|
1013
|
Wednesday, July 24, 2024, 14:08 |
Dave Neilson | | | | | | | | Beam line window change - DUV installation | Wednesday, July 24, 2024, 14:07 Changed beamline window to DUV window (window at magnet for target source viewing) |
1017
|
Tuesday, August 06, 2024, 15:50 |
Aaron Schmidt | | | | | | | Problems/Solutions | TS Troubleshooting - Leak/HV spark issues | Due to HV sparking & possible water leaks on the previous TiC & Ta targets, checks are to be performed.
Chamber is empty. U-Line installed. All waterlines purged. FS#2, 3, 4, & 5 are closed.
Vacuum Group LD #2 - Connected to TP1B backing line
Tuesday, August 06, 2024, 15:50: Vacuum @ 3.38e-06T.
Tuesday, August 06, 2024, 15:52: No He connected. 7.0 E-09 atm-cc. LD TP pressure 1.0e-03T.
Tuesday, August 06, 2024, 16:20: No He connected. 1.1 E-08 atm-cc. LD TP pressure 1.0e-03T.
Tuesday, August 06, 2024, 16:23: Open to chamber. 1.6 E-08 atm-cc. LD TP pressure 1.0e-03T. Vacuum @ 2.97e-06T.
Tuesday, August 06, 2024, 16:26: 20 PSI. 1.6 E-08 atm-cc. LD TP pressure 1.0e-03T. Vacuum @ 2.97e-06T.
Tuesday, August 06, 2024, 16:32: FS#5 Charged with 20 PSI He. 1.6 E-08 atm-cc. LD TP pressure 1.0e-03T. Vacuum @ 2.75e-06T.
Tuesday, August 06, 2024, 16:34: Close FS#5
Tuesday, August 06, 2024, 16:35: FS#4 Charged with 20 PSI He. Increase to 2.5 E-08 atm-cc. LD TP pressure 1.0e-03T. Vacuum @ 2.75e-06T.
Tuesday, August 06, 2024, 16:42: While purging FS#4 with HPA, an increase of 8.3 E-08 atm-cc was observed. Vacuum @ 2.75e-06T.
Tuesday, August 06, 2024, 16:50: Re-connected He. FS#3 Charged with 20 PSI He. Increase to from 3.6 to 9.0 E-08 atm-cc. LD TP pressure 1.0e-03T. Vacuum @ 2.59e-06T.
Tuesday, August 06, 2024, 16:52: 5.1 E-08 atm-cc. LD TP pressure 1.0e-03T. Vacuum @ 2.57e-06T. Line still @ 20 PSI.
Tuesday, August 06, 2024, 16:53: Release pressure on FS#3. 5.1 E-08 atm-cc. LD TP pressure 1.0e-03T. Vacuum @ 2.57e-06T. Line still @ 20 PSI.
Tuesday, August 06, 2024, 16:55: FS#2 Charged with 20 PSI He. Steady @ 5.1 E-08 atm-cc. LD TP pressure 1.0e-03T. Vacuum @ 2.59e-06T.
Observed increases on FS#3 & FS4.
Tuesday, August 06, 2024, 17:02: All lines purged with HPA. Allow vacuum to continue down.
Tuesday, August 06, 2024, 17:03: Close off LD to TP1B valve. Dropped to 1.7 E-08 atm-cc. LD TP pressure 1.0e-03T. Vacuum @ 2.48e-06T. Safe to vent LD.
Tuesday, August 06, 2024, 17:06: LD vented & disconnected.
Wednesday, August 07, 2024, 09:15: Vacuum @ 6.43e-07T. Gradually refill the waterlines.
Wednesday, August 07, 2024, 09:20: FS#5 open. Vacuum remains steady.
Wednesday, August 07, 2024, 09:28: FS#2 open. Vacuum @ 6.38e-07T.
Wednesday, August 07, 2024, 09:30: FS#4 open. Vacuum @ 6.38e-07T. Wait 5 min.
Wednesday, August 07, 2024, 09:35: Vacuum steady @ 6.36e-07T. Occasional dip to 6.27e-07T.
Wednesday, August 07, 2024, 09:36: FS#3 open. Vacuum steady. Wait 5 min.
Wednesday, August 07, 2024, 09:41: No change to vacuum.
While the helium did get through on yesterdays tests as a minor molecular leak, the water does not appear to have an affect. Moving to an empty HV test.
Wednesday, August 07, 2024, 09:53: Vacuum 6.20e-07T.
Wednesday, August 07, 2024, 10:43: Vacuum 6.20e-07T. IG1 & TP off. - venting test stand for target installation
Wednesday, August 07, 2024, end of day. mass marker target installed in test stand with side foil removed so the target is visible through the view port. vacuum roughed, then turbo pumps turned on at end of day for overnight pumping
Thursday, August 08, 2024, 09:19 - vacuum at 6.27e-7T. water cooling was switched on. no effect on vacuum. TGHT and TBHT began ramping at 1A/30s. will test high voltage at low heat and at high heat.
Thursday, August 08, 2024, 10:04 HV at 35kV. No sparks. TGHT TBHT at <80A throughout HV ramp and plateau
Thursday, August 08, 2024, 10:14 BIAS down. TGHT TBHT at 100A. increasing ramp rate to 1.7A/10s. heating up to 480/230
Thursday, August 08, 2024, 13:59 BIAS has slowly been brought to 28kV . no sparks at all, despite being over 24kV for ~50min.
Thursday, August 08, 2024, 14:00 increasing TGHT to 580A to attempt to induce sparks.
Thursday, August 08, 2024, 14:42 at TGHT TBHT 580 230, HV bias at 28kV (with EZL and EE at 0 and 0), no sparks at all over the ramp and over 10 minutes at this condition.
Thursday, August 08, 2024, 14:43 ramping HV to 30kV
Thursday, August 08, 2024, 15:01 - - no sparks at 30kV. bringing up EZL to 13kV (EE=0)
Thursday, August 08, 2024, 15:11 - no sparks with EZL at 13kV. bringing up EE to -2500V
Thursday, August 08, 2024, 15:13 - no sparks with EE at -2500kV
Thursday, August 08, 2024, 15:22 turned on beam optics to observe beam out, but no beam currently detected on FC0, nor on the wire scanners, nor on FC6. This target commonly has a normal beam output of primarily Na and K
Thursday, August 08, 2024, 15:50 have not been able to deduce reason for lack of beam. increasing BIAS to 50kV.
Thursday, August 08, 2024, 15:51 during ramp up, at 38kV, many optics elements tripped and switched off. however, no spark was registered at the strip tool. not sure of the cause for this.
Thursday, August 08, 2024, 15:54 at 38.8kV, a small spark, only registered on BIAS:RDCUR (no voltage drop), tripped off beam elements prior to FC0 again.
Thursday, August 08, 2024, 16:00 BIAS at 40kV. no sparks apart from those mentioned immediately above. still have not registered any beam on FC0.
Thursday, August 08, 2024, 16:02 Vacuum pressure has raised from 6.5e-7 to 1.3e-6 T.
Thursday, August 08, 2024, 16:03 just now, there was a spike drop in pressure and optics elements have shut down again. nothing registered on BIAS, EZL, or EE.
Thursday, August 08, 2024, 16:11 a spark occurred at 43.3 kV
Thursday, August 08, 2024, 16:23 this spark was audible at the test stand --- ie, not inside
Thursday, August 08, 2024, 16:51 Saw no indication overall of the same HV sparking issues that we saw with the previous two targets. However, we were unable to generate beam register any beam output on FC0, FC6, or wire scanners. And we don't mean 'low signal'. Actually nothing at all.
Thursday, August 08, 2024, 16:54 Ramping down TGHT TBHT now
Friday, August 09, 2024, 08:05 turbo pumps off and spinning down in preparation to vent. will remove the inner foil from the target to observe if a change in shine from the target induces sparking as before.
Friday, August 09, 2024, 08:58 turbo pumps no longer spinning. venting now.
Friday, August 09, 2024, 10:26 foil stripped off the target. there was a hole in the source for gas (febiad/mass marker). This hole is now plugged. reinstalled, roughing.
Friday, August 09, 2024, 11:59 vacuum at 1.2e-5T. turning on water cooling lines. no effect on vacuum.
Friday, August 09, 2024, 12:50 heating TGHT TBHT at 1A/30s
Friday, August 09, 2024, 13:47 increasing heating rate to 1.7A/10s, up to 580/230A
Friday, August 09, 2024, 14:42 TGHT TBHT at 550 230, increasing BIAS to 30kV
Friday, August 09, 2024, 15:03 BIAS at 30kV. no sparks other than a single small one at 25kV. No beam detected at FC0, FC6, or wire scanners.
Friday, August 09, 2024, 15:18 increased BIAS again. there was one spark at 35kV, then it was stable for 8 minutes with no sparks. still no signal on FC0. This lack of signal is highly irregular, and should not be the case despite being an empty target. Will have to compare to the next target in the test stand. To attempt to correct, we have:
- manually adjusted gain
- reset bias
- flipped polarity back and forth
- confirmed FC in position
- confirmed no flagged power supply issue
- confirmed clear beam line to FC0
- confirmed upsteam optics are tuned appropriately
Friday, August 09, 2024, 15:23 cooling target and ramping down HV
Friday, August 09, 2024, 16:06 TGHT TBHT at 0. turbo pumps off and spinning down.
|
1019
|
Tuesday, August 13, 2024, 09:31 |
Dave Neilson | | | | | | | Problems/Solutions | Troubleshooting HV sparks and FC0 signal | Monday, August 12, 2024, 17:00 EOD. target installed, roughed, turbos on. No effect on vacuum from turning on water cooling lines. TGHT TBHT slowly brought to 230A/230A overnight.
Tuesday, August 13, 2024, 09:28. Vacuum at 9.9e-7T. TGHT TBHT at 210/210. accelerating heating to 230/230. bringing up HV EZL EE to 30 / 2.5 / 13 kV
Tuesday, August 13, 2024, 09:51. with EZL 13kV, EE 2.5kV. When increasing BIAS from 17.0 to 17.5kV. Signal becomes detectable on FC0, at 7.75e-10A
Tuesday, August 13, 2024, 10:13 at BIAS 30kV. FC0 and wire scanners appear to be working correctly. FC0 reading 2.66e-8A
Tuesday, August 13, 2024, 10:13 turning on all beam optics for FC6 mass scan.
Tuesday, August 13, 2024, 10:31 mass scan procedure is doing a very poor job of recording the background noise. filename 2024-08-13_10-44 Ksalt mm 230-230
Tuesday, August 13, 2024, 10:46 increasing tght to 330
Tuesday, August 13, 2024, 10:59 FC0 at 2.1e-8A
Tuesday, August 13, 2024, 11:12 running mass scan at TGHT TBHT = 330/230 A. filename 2024-08-13_11-21 Ksalt mm 330-230
Tuesday, August 13, 2024, 11:23 increasing TGHT to 430
Tuesday, August 13, 2024, 11:29 three sparks within 2 min at TGHT 378A. (no sparks at all previous to this). TGHT ramp aborted.
Tuesday, August 13, 2024, 11:36 resuming TGHT increase after 6 minutes of no sparks.
Tuesday, August 13, 2024, 11:51 FC0 reading 1.6e-8. FC0 signal fluctuating throughout test. rises during ramp and drops during static TGHT TBHT level.
Tuesday, August 13, 2024, 11:53 running mass scan at TGHT TBHT 430/230 A . filename 2024-08-13_12-16 Ksalt mm 430-230
Tuesday, August 13, 2024, 12:17 increasing TGHT to 530A.
Tuesday, August 13, 2024, 12:31 FC0 at 3.03e-8 A
Tuesday, August 13, 2024, 12:31 beginning mass scan - filename 2024-08-13_13-02 Ksalt mm 530-230
Tuesday, August 13, 2024, 13:02 increasing TGHT to 580A
Tuesday, August 13, 2024, 13:13 FC0 at 3.58e-8A. beginning mass scan - filename 2024-08-13_13-35 Ksalt mm 580-230
Tuesday, August 13, 2024, 13:37 increasing bias to test sparking
Tuesday, August 13, 2024, 13:58 at 37kV, a number of optics elements prior to FC0 went down. no voltage or current spikes
Tuesday, August 13, 2024, 13:59 at 42.4kV, a couple sparks, seem to involve TGHT and BIAS. these dropped a few optics elements. when I brought them back up, they went down again, at a time with no voltage or current spikes.
Tuesday, August 13, 2024, 14:30 at 43.6kV, the sparking frequency became regular, with HV bias sparks occurring approximately every 5 minutes
Tuesday, August 13, 2024, 17:00 considerable time was spent until end of day manipulating the bias and the TGHT current level in an effort to discover the location of the regular sparking
increases in HV were found to increase the frequency of sparking, and eventually the HV increase was found to hit a threshold where the current would increase noticeably, with a stable voltage. this was accompanied by a buzzing coming from the feedthroughs on top of the cage. seemed to be coming from the TGHT(+) feedthrough. At no time did there appear to be sparking within the chamber of the test stand. In one instance, with HV just below the threshold of buzzing, increasing TGHT seemed to induce the buzzing state.
Wednesday, August 14, 2024, 11:16 ramping up bias to HV. intending to push HV today to find the source of these sparks and buzzing. initially, will be observing this with TGHT TBHT at 180/180 A
Wednesday, August 14, 2024, 11:47 at BIAS = 32.6kV (with EE 2.5 kV and EZL 13 kV), HV appears to be stable. Yesterday, we observed a fluctuating BIAS current which seemed to culminate in regular sparking activity (although this was at voltages of >40kV)
Wednesday, August 14, 2024, 12:26 at bias = 38.8kV, there was a significant accompanying increase in BIAS current, but no evidence of sparking or buzzing
Wednesday, August 14, 2024, 12:46 at BIAS = 49.2kV, the buzzing begins. On the strip tool this is also seen as a large jump in current, with stable voltage
Wednesday, August 14, 2024, 12:49 dropping the bias by ~1kV stopped the buzzing. ramping up quickly again caused a spark and more buzzing. increasing the voltage to attempt to locate the source.
Wednesday, August 14, 2024, 13:18 at bias of 49.2kV, buzzing began. dropping the bias stopped it. to attempt to locate the source, we increased the bias significantly. At 53kV, the bias power supply began to current limit. when this was increased, a spark caused the putty connection at the test stand to disconnect and two turbo pumps to trip off. once restored, another increase of the bias eventually caused a large spark when trying to locate the buzzing sound. Again, it seems to be at the feedthroughs of TGHT TBHT. My guess is TGHT+, but there is nothing visual to confirm it is coming from there. This buzzing state is also accompanied by a drop in EZL current to 0 and a large increase in EZL voltage readback.
Wednesday, August 14, 2024, 15:05 dropped the HV and removed the cage to investigate any issues. we propose that this likely involves jumping to the einzel lens and are curious if raising the EZL voltage significantly would prevent this state from recurring. cage back on, raising HV
Resuming testing after TGHT TBHT power supply updates:
Friday, September 06, 2024, 12:09: Ramped up TGHT and TBHT to ~170A at 1A/30s. Increasing ramp rate to 1.7A/10s up to 580A/230A
Friday, September 06, 2024, 14:11 slowly increasing BIAS, EE and EZL to 30kV, 2.5kV, 13kV
Friday, September 06, 2024, 15:53 appears that FC0 and wire scanners are working normally. However, there is a threshold reading problem with FC6. seems that a negative readout is present on FC6 if there is no substantial signal, and then nothing is recorded to the mass scans.
Friday, September 06, 2024, 15:54 increasing voltage to test high voltage sparking (BIAS AND EZL)
Friday, September 06, 2024, 16:23 after resetting the FC6 polarity and the FC6 bias, the background signal began showing up.
Tuesday, September 10, 2024, 12:19 Test stand vented, target removed. |
1020
|
Friday, September 06, 2024, 12:08 |
Dave Neilson | | | | | | | Done | Test Stand repair/update | Friday, September 06, 2024: New TSH:TGHT power supply has been installed and is now functional. Magna-Power TSD-900/208. The TSH:TBHT power supply has also been cleaned, and the COIL power supply replaced with a duplicate that should function identically.
|
1024
|
Monday, October 07, 2024, 09:54 |
Aaron Schmidt | | | | | | | | Pump down empty chamber / IG6 fix | Monday, October 07, 2024, 09:54: Roughing. U-Line installed on HS waterline.
Monday, October 07, 2024, 10:34: Vent Chamber. TP6 & TP2 off. |
1027
|
Thursday, October 31, 2024, 13:53 |
Aaron Schmidt | | | | | | | In progress | Chamber empty & Fix IG6 | Thursday, October 31, 2024, 13:53: Roughing down empty chamber. U-Line installed.
Monday, November 04, 2024, 11:40: Vent beamline.
Monday, November 04, 2024, 13:40: 1/2 operating filament spare provided & installed. Roughing beamline section.
Monday, November 04, 2024, 13:51: TMS:TP2 on.
Monday, November 04, 2024, 13:57: TMS:TP6 on. TMS:IG6 on.
Tuesday, November 05, 2024, 15:00: Venting Chamber
Tuesday, November 05, 2024, 15:19: IG6 still displaying issues. Contacted Edi,
Tuesday, November 05, 2024, 15:35: Controller replaced. Switch to Filament 2. IG6 on. Reading 3.73e-07T.
Wednesday, November 13, 2024, 09:16: IG6 is tripped again.
Wednesday, November 13, 2024, 09:17: Reset & switched back to Filament 2. There is no filament 1. Reading 3.91e-07T. |
1030
|
Tuesday, November 19, 2024, 14:25 |
Aaron Schmidt | | | | | | | | Pump down empty chamber | Tuesday, November 19, 2024, 14:25: Roughing |
1031
|
Thursday, November 28, 2024, 11:47 |
Isaiah Rabuka | | | | | | | In progress | Heating Stage Pellet Testing and Development | Opened the ATTS, placed what I will call “Cast Alumina Sample #1” into the ATTS and activated the roughing then turbo pumps. Currently sample is in slow heating progress to 1000 degrees Celsius, process is expected to take some time, so I'll revisit after lunch.
|
1032
|
Thursday, November 28, 2024, 13:47 |
Isaiah Rabuka | | | | | | | | | November 28, 2024 1:46PM
Checked in on sample in ATTS. |
1033
|
Tuesday, December 03, 2024, 14:55 |
Dave Neilson | | | | | | | Done | Power supply changed to CATHODE mode (-) | Tuesday, December 03, 2024, 14:55 ANODE/CATHODE power supply switched to cathode mode, NEGATIVE |
1034
|
Tuesday, December 03, 2024, 15:49 |
Isaiah Rabuka | | | | | | | | | Tuesday, December 03, 2024, 15:48
Switched out pellets in ATTS, brought pressures down to ~10 uTorr, heated and cooled sample. |
1035
|
Wednesday, December 04, 2024, 15:43 |
Isaiah Rabuka | | | | | | | | | Wednesday, December 04, 2024, 15:42 Depressurized the ATTS |
1036
|
Thursday, December 05, 2024, 11:08 |
Aaron Schmidt | | | | | | | Problems/Solutions | Swap RP1 & Inspection (ITS Pumps) | Thursday, December 05, 2024, 11:04: RP1 was struggling to pump down. RP SN: MY20055A02 removed. Tip seal replacement likely req'd.
Swapped with a new roughing pump SN: MY2340SA06 (Voltage set to 115V. Shipping locks loosened prior to install)
Ballast filter installed.
Thursday, December 05, 2024, 11:05: Roughing.
Thursday, December 05, 2024, 11:10: Vacuum pressure dropping optimally. Down below 1T already
Thursday, December 05, 2024, 11:47: TP & other RP ok. Note TP1A is getting louder on startup. Will likely need a change out in Q1 - 2025.
Additional source tray inspection:
Monday, December 16, 2024, 15:30: OK
Images attached. |
1037
|
Thursday, December 05, 2024, 14:06 |
Isaiah Rabuka | | | | | | | | | Thursday, December 05, 2024, 14:05 Pressurized ATTS with argon, swapped out samples, and repressurized and heated chamber. |
1039
|
Friday, December 06, 2024, 16:03 |
Isaiah Rabuka | | | | | | | | | Friday, December 06, 2024, 16:03 Heated and cooled a sample in the ATTS 3x |
1040
|
Tuesday, December 10, 2024, 14:38 |
Isaiah Rabuka | | | | | | | | | Tuesday, December 10, 2024, 14:38 Depressurized ATTS using argon, switched out samples, and repressurized ATTS. Heated new sample to 1000 degrees Celsius.
|
|