ID Date Author Target/No.# Source Station Module Target Oven W.O# Heat Shield W.O#down Status Subject Text Attachments
  945   Tuesday, November 15, 2022, 15:32 Sam Gupta       ATTS tantalum Bracket Heating testHeated up sample 01 for the second time
and measured the temperature with increasing
current. Used pyrometre to measure temperature
  
  946   Wednesday, November 16, 2022, 13:28 Aaron Schmidt      Problems/SolutionsTSG:TP1A Replaced See elog 944
Wednesday, November 16, 2022, 13:23:
TP1 A replaced
  
  948   Monday, December 05, 2022, 15:41 Aaron Schmidt       Source tray insulator replacement Monday, December 05, 2022, 15:38:
Source Tray TGHT & TBHT insulators replaced. 
Torqued @ 75 in-lbs. (Reference image
 7x 
  952   Monday, December 19, 2022, 12:49 Carla Babcock HP-FEBIAD     HP-FEBIAD testsMonday, December 19, 2022, 12:06 : Tomislav
changed the polarity of the anode power supply
last week and everything has been closed
  
  953   Wednesday, December 21, 2022, 17:06 Carla Babcock       Prep for power outageSource and beamline power supplies turned
off in EPICS
HV cage power off
  
  954   Tuesday, January 03, 2023, 10:03 Carla Babcock       Recovery from power outageEasy recovery after power outage, just
had to power cycle the ground PLC IOC and
the BiRa IOC.
  
  956   Monday, January 16, 2023, 16:02 Aaron Schmidt HP-FEBIAD-CTL    In progressHP-FEBIAD testsExtra wraps of foil around the center block
(6) + 3 full wraps around the shield.
Monday, January 16, 2023, 15:40:
  
  957   Tuesday, January 17, 2023, 09:48 Aaron Schmidt      Problems/SolutionsTMS:RP2 FailureTuesday, January 17, 2023, 09:48: TMS:RP2
off. Audible failure was in progress. Also
observable on the strip tool. Vacuum group
  
  961   Thursday, April 13, 2023, 11:07 Aaron Schmidt      In progressInstallation of new IDP-15 TMS:TP2IDP15 Scroll Pump, Std w/ inlet.
TMS:RP2
PN: X3815-64010
  
  968   Thursday, May 25, 2023, 13:47 Aaron Schmidt       Rough down empty chamberThursday, May 25, 2023, 13:47: Roughing.   
  970   Thursday, June 08, 2023, 14:22 Aaron Schmidt       Rough down empty chamberThursday, June 08, 2023, 14:22: Roughing.   
  972   Monday, July 10, 2023, 15:01 Aaron Schmidt       Pump down empty chamberMonday, July 10, 2023, 15:01: Roughing.

Wednesday, July 12, 2023,
09:38: Venting both chambers. 
  
  973   Thursday, July 13, 2023, 07:37 Aaron Schmidt       Tests - Aurelia LThursday, July 13, 2023, 07:37: Chamber
is vented. Beamline is vented. Interlock
bypassed on TPS:IV4 - AS
  
  974   Thursday, July 13, 2023, 18:29 Aurelia Laxdal LP-SIS    In progressSpectrometer tests Pumping down: TS loaded with a LP-SIS
container for spectrometer test. 
Started heating up the target container:
  
  977   Wednesday, August 16, 2023, 11:32 Aaron Schmidt       Pump down empty chamberWednesday, August 16, 2023, 11:32: Roughing.

Thursday, August 17, 2023,
11:01: Venting.
  
  979   Tuesday, August 29, 2023, 12:14 Aaron Schmidt       Pump down empty chamberTuesday, August 29, 2023, 12:14: Roughing.
Tuesday, August 29, 2023, 13:17:
TP1B started. 
  
  981   Thursday, September 28, 2023, 13:42 Aaron Schmidt       Pump down empty chamberThursday, September 28, 2023, 13:40: Roughing
- BB.

Tuesday, October 10, 2023,
  
  985   Thursday, November 16, 2023, 09:43 Aaron Schmidt LP-SIS    In progressThermal testsAurelia has been testing on the ISAC TS
since last week. Thermocouples are installed
in the end cap, left side & the ionizer.
  
  987   Tuesday, December 12, 2023, 12:41 Aaron Schmidt      DoneSource Tray / TS inspectionTuesday, December 12, 2023, 12:39: Visual
inspection.
Source tray: OK. Minor cracks on
  
  989   Thursday, January 18, 2024, 10:44 Aaron Schmidt      DoneThermal tests 2December 18 - January 15. Were not logged.
Placed holder. Aurelia's tests. Included
thermocouples in the oven & ionizer.
  