  920   Wednesday, April 20, 2022, 13:42 Aaron Schmidt       Vent Beamline halfAurelia to do a visual test later.
Wednesday, April 20, 2022, 13:41:
IG6 Off. TP6 & TP2 off.
  
  922   Monday, May 02, 2022, 14:10 Aaron Schmidt P2N-SIS     Empty Chamber PS test.No P2N is loaded. Testing the power supplies.
Tuesday, May 03, 2022, 10:07
In the past few days, the ITS has
  
  926   Wednesday, May 11, 2022, 10:05 Aaron Schmidt P2N-SISITETM444812-245240-1 P2N assembly conditioning - 3Target oven #45241-1 swapped out. SS bolts
were in use on the legs.
Molybdenum screws in the legs on
  
  933   Monday, June 20, 2022, 11:49 Aaron Schmidt       Pump down empty chamberMonday, June 20, 2022, 11:49: Water line
loop installed. Roughing.

Thursday, June 23, 2022,
  
  935   Thursday, June 30, 2022, 13:50 Aaron Schmidt       Pump down empty chamberThursday, June 30, 2022, 13:46: Roughing.

Thursday, July 07, 2022,
15:00: Venting.
  
  943   Wednesday, October 19, 2022, 12:16 Aaron Schmidt       Test Stand controls changedgenepicsas.triumf.ca
x11 enabled.
Then use login credentials.
  
  945   Tuesday, November 15, 2022, 15:32 Sam Gupta       ATTS tantalum Bracket Heating testHeated up sample 01 for the second time
and measured the temperature with increasing
current. Used pyrometre to measure temperature
  
  948   Monday, December 05, 2022, 15:41 Aaron Schmidt       Source tray insulator replacement Monday, December 05, 2022, 15:38:
Source Tray TGHT & TBHT insulators replaced. 
Torqued @ 75 in-lbs. (Reference image
 7x 
  952   Monday, December 19, 2022, 12:49 Carla Babcock HP-FEBIAD     HP-FEBIAD testsMonday, December 19, 2022, 12:06 : Tomislav
changed the polarity of the anode power supply
last week and everything has been closed
  
  953   Wednesday, December 21, 2022, 17:06 Carla Babcock       Prep for power outageSource and beamline power supplies turned
off in EPICS
HV cage power off
  
  954   Tuesday, January 03, 2023, 10:03 Carla Babcock       Recovery from power outageEasy recovery after power outage, just
had to power cycle the ground PLC IOC and
the BiRa IOC.
  
  963   Wednesday, April 26, 2023, 08:46 Aaron SchmidtTiC#5LP-FEBIADITETM444692-645235-20 Testing TiC#5 assembly w/ an empty targetAnode remade with a ceramic "elbow-cube".
Empty target oven in use for testing.
Wednesday, April 26, 2023, 08:44:
 TiC#5_empty_container_run.docxScreenshot_from_2023-04-27_21-54-15.png 
  968   Thursday, May 25, 2023, 13:47 Aaron Schmidt       Rough down empty chamberThursday, May 25, 2023, 13:47: Roughing.   
  970   Thursday, June 08, 2023, 14:22 Aaron Schmidt       Rough down empty chamberThursday, June 08, 2023, 14:22: Roughing.   
  972   Monday, July 10, 2023, 15:01 Aaron Schmidt       Pump down empty chamberMonday, July 10, 2023, 15:01: Roughing.

Wednesday, July 12, 2023,
09:38: Venting both chambers. 
  
  973   Thursday, July 13, 2023, 07:37 Aaron Schmidt       Tests - Aurelia LThursday, July 13, 2023, 07:37: Chamber
is vented. Beamline is vented. Interlock
bypassed on TPS:IV4 - AS
  
  976   Monday, August 14, 2023, 12:11 Aaron Schmidt LP-SIS  45220-1145235-3 Graphite target test 2 (C2023B)Graphite experiment insert 1: ID GR-230515,
WO#45220-11. https://elog.triumf.ca/TIS/Evaporator_2/622
New disc form. End caps expanded,
 Graphitetesting_Aug102023.xlsx 
  977   Wednesday, August 16, 2023, 11:32 Aaron Schmidt       Pump down empty chamberWednesday, August 16, 2023, 11:32: Roughing.

Thursday, August 17, 2023,
11:01: Venting.
  
  979   Tuesday, August 29, 2023, 12:14 Aaron Schmidt       Pump down empty chamberTuesday, August 29, 2023, 12:14: Roughing.
Tuesday, August 29, 2023, 13:17:
TP1B started. 
  
  981   Thursday, September 28, 2023, 13:42 Aaron Schmidt       Pump down empty chamberThursday, September 28, 2023, 13:40: Roughing
- BB.

Tuesday, October 10, 2023,
  