Entry  Wednesday, November 23, 2022, 13:52, Aaron Schmidt, , , , , , 44378-14, In progress, FEBIAD Coil Tests 

Sam G. & Navid N.

Work Permit# C2022-11-23--1

Wednesday, November 23, 2022, 13:51 FS#5 on (HS bypassed with a water loop)

Wednesday, November 23, 2022, 13:55: TSG:IG1 Bypass on

Wednesday, November 23, 2022, 14:03: Signage up. Main breaker on.

Wednesday, November 23, 2022, 14:07: FS#5 off & purged. Not needed.

 Wednesday, November 23, 2022, 15:01: measured magnetic field of coil at 8A

end test


 Monday, November 28, 2022, 11:45: start test set up the hall probe with the jig to move it on the table and centered the hall probe in the magnet. signage up Main breaker on

Monday, November 28, 2022, 13:17: start collecting data at 8 amps

Monday, November 28, 2022, 16:11: end test


 Tuesday, November 29, 2022, 10:50:Signage up Main Breaker on Testing started; with current of 8 amps

Taking measurements of temperature at 8A 9A and 10A

Tuesday, November 29, 2022, 15:25 : system locked out and took out magnet

end test


Wednesday, November 30, 2022, 12:40: Test started. Breaker on. signage up. put in low profile magnet with wire ties to keep coils together.

taking data with 8A of current

Wednesday, November 30, 2022, 16:25: end of test power supply off breaker off


 

Entry  Monday, December 05, 2022, 15:41, Aaron Schmidt, , , , , , , , Source tray insulator replacement 7x

 Monday, December 05, 2022, 15:38: Source Tray TGHT & TBHT insulators replaced. 

Torqued @ 75 in-lbs. (Reference image attached)

 

Entry  Wednesday, December 21, 2022, 17:06, Carla Babcock, , , , , , , , Prep for power outage 

Source and beamline power supplies turned off in EPICS

HV cage power off

Magnet ramped down and power supplies turned off manually (bira and tdk lambda)

VME crates and kepco turned off

Water lines closed

Will turn off pumps remotely later. Left PLC on

Entry  Tuesday, January 03, 2023, 10:03, Carla Babcock, , , , , , , , Recovery from power outage 

Easy recovery after power outage, just had to power cycle the ground PLC IOC and the BiRa IOC.

Test stand vacuum currently pumping down again. Water and HV elements still off.

Tuesday, January 03, 2023, 11:13: Reset IG6 - Filament 2. Vacuum 7.22e-06T - AS

Tuesday, January 03, 2023, 14:00: Both Turbo pumps on.

Tuesday, January 03, 2023, 14:27: Vacuum @ 2.32e-06T

Tuesday, January 03, 2023, 14:28: FS#2 opened. Vacuum ok.

Tuesday, January 03, 2023, 14:29: FS#3 opened. Vacuum ok.

Tuesday, January 03, 2023, 14:30: FS#4 opened. Vacuum ok.

Tuesday, January 03, 2023, 14:31: FS#5 opened. Vacuum ok. Stable @ (2.24-2.32)e-06T. - AS

Entry  Tuesday, January 17, 2023, 09:48, Aaron Schmidt, , , , , , , Problems/Solutions, TMS:RP2 Failure 

Tuesday, January 17, 2023, 09:48: TMS:RP2 off. Audible failure was in progress. Also observable on the strip tool. Vacuum group contacted.

Entry  Thursday, April 13, 2023, 11:07, Aaron Schmidt, , , , , , , In progress, Installation of new IDP-15 TMS:TP2 

IDP15 Scroll Pump, Std w/ inlet.

TMS:RP2

PN: X3815-64010

Serial: MY2301SA17

Thursday, April 13, 2023, 11:04: Roughing RP2

Thursday, April 13, 2023, 11:05: Open BV6 & BV2

Thursday, April 13, 2023, 11:15: TMS:TP2 & TMS:TP6 on.

Thursday, April 13, 2023, 11:19: IG6 on.

Thursday, April 13, 2023, 12:05: Vacuum @ 1.43e-05T.

Entry  Thursday, May 25, 2023, 13:47, Aaron Schmidt, , , , , , , , Rough down empty chamber 

Thursday, May 25, 2023, 13:47: Roughing.

Entry  Thursday, June 08, 2023, 14:22, Aaron Schmidt, , , , , , , , Rough down empty chamber 

Thursday, June 08, 2023, 14:22: Roughing.

Entry  Monday, July 10, 2023, 15:01, Aaron Schmidt, , , , , , , , Pump down empty chamber 

Monday, July 10, 2023, 15:01: Roughing.


Wednesday, July 12, 2023, 09:38: Venting both chambers. 

Entry  Thursday, July 13, 2023, 07:37, Aaron Schmidt, , , , , , , , Tests - Aurelia L 

Thursday, July 13, 2023, 07:37: Chamber is vented. Beamline is vented. Interlock bypassed on TPS:IV4 - AS

Entry  Wednesday, August 16, 2023, 11:32, Aaron Schmidt, , , , , , , , Pump down empty chamber 

Wednesday, August 16, 2023, 11:32: Roughing.


Thursday, August 17, 2023, 11:01: Venting.

Entry  Tuesday, August 29, 2023, 12:14, Aaron Schmidt, , , , , , , , Pump down empty chamber 

Tuesday, August 29, 2023, 12:14: Roughing.

Tuesday, August 29, 2023, 13:17: TP1B started. 

Tuesday, August 29, 2023, 13:21: TP1B on. 

Tuesday, August 29, 2023, 13:46: TP1A started. 

Tuesday, August 29, 2023, 14:00: TP1A Tripped.

Tuesday, August 29, 2023, 14:20: TP1B off. 

Entry  Thursday, September 28, 2023, 13:42, Aaron Schmidt, , , , , , , , Pump down empty chamber 

Thursday, September 28, 2023, 13:40: Roughing - BB.


Tuesday, October 10, 2023, 14:08: Venting.

Entry  Tuesday, December 12, 2023, 12:41, Aaron Schmidt, , , , , , , Done, Source Tray / TS inspection 

Tuesday, December 12, 2023, 12:39: Visual inspection.

Source tray: OK. Minor cracks on insulator near the coil conductor. Small chip in the upper TBHT insulator as well.

Water blocks: No leaks.

Pumping: TMS:RP2 recently purged. Otherwise all TP & RP OK.

Door seals: OK.

Entry  Tuesday, December 12, 2023, 16:11, Dave Neilson, Shunt #0, , , , -, -, , P2N Thermal Test 

Tuesday, December 12, 2023, 16:07  - Pumping down test stand overnight for testing tomorrow. vacuum good, turbos starting now. Four thermocouples attached inside. tc1: high on (+) TGHT leg, pins 1+2. tc2: at target terminal (+), pins 4+5. tc3: at target terminal (-), pins 6+7. tc4: low on (+) TGHT leg, pins 8+9.

 Wednesday, December 13, 2023, 09:32 : Vacuum at 8.2e-7 T.  Electrical team is finishing connecting the cables. Claim it will be complete at 11am.

 Wednesday, December 13, 2023, 11:41Started both tc loggers at 11:40 - important for offset time. Beginning ramp as well on ATTS TGHT. set vacuum values high at 1e3 1e4 to bypass ATTS interlock, which does not apply here. ramping to 600A with step increment 10A and wait interval 10s.

    ATTS TGHT claims ramping in progress, but increased voltage is reported only on the autoramp window, which reports increasing the target amperage by 10A each 10s. However, no increased voltage reading is reported there, nor is there any increased current. ATTS:TGHT:RDCUR and ATTS:TGHT:RDVOL are ~0 as well. No increased temperature on any of 6 tc channels.

Wednesday, December 13, 2023, 11:57 ATTS TGHT power supplies appear to be under local control. It also appears (low current right now) that the value reported in EPICS is 1/3 of the value reported on the master power supply. It may be that the epics value is per output of the individual 3 supplies, while the total output is reported on the PS display. Planning to now increase to 300A and reach steady state.

Wednesday, December 13, 2023, 12:13 : 1/3 ratio idea confirmed at 33A EPICS reading / 100A master reading and again at 100A EPICS reading / 300A master reading. 300A now reached. Waiting for 20min. Temps inside ~ 21°C. Temps on feed through terminals ~22°C

 Wednesday, December 13, 2023, 12:26:  200epics 600A master. tc out: 23.0, 22.6. tc in: 21.4 21.7 22.0 20.8.  waiting

Wednesday, December 13, 2023, 12:36  No temp change over 10 min. increasing to 900A

 Wednesday, December 13, 2023, 12:47: 900A. outside tc 24.5 23.7°C. inside tc 21.7 23 23.6 21.0 °C.

Wednesday, December 13, 2023, 13:04: increasing to 1200A

Wednesday, December 13, 2023, 13:11  1200A. outside tc 27.1 25.4. inside tc 22.6 24.8 25.9 21.7 °C. Will wait to observe stability

Wednesday, December 13, 2023, 13:20 after ~10min. outsideTC: 27.6 25.9. insideTC: 22.5 25.2 26.1 21.8 °C.  Temperatures appear stable. increasing to 1300A

 Wednesday, December 13, 2023, 13:25   at 1300A. outsideTC: 28.3 26.5, insideTC: 22.8 25.7 26.8 21.8.   waiting for stability

 Wednesday, December 13, 2023, 13:38 after ~10min, outsideTC 29.1 27.1, insideTC 23.2, 26.2, 27.4, 21.9.  stable. Increasing to 1400A

 Wednesday, December 13, 2023, 13:41:   1400A. outsideTC 29.8, 27.6. insideTC 23.4 26.7 28.2 21.4

Wednesday, December 13, 2023, 13:50     temps look stable 30.1 27.9,     23.3 27.7 28.4 21.4 .    going to increase to 1500A   ---- turning off turbo pumps in case of failure at high current

 Wednesday, December 13, 2023, 13:57    at 1500A. temps:   30.9 28.3.  23.6 27.2 28.9 21.8 .

 Wednesday, December 13, 2023, 14:07  temps look stable:   31.5 28.8...   23.6 28.0 29.4 22.0     going to increase to 1600A

 Wednesday, December 13, 2023, 14:10    at 1600A     temps:  32.0 29.1..... 23.8 28.2 30.0 22.2

 Wednesday, December 13, 2023, 14:20   temps stable: 32.8 29.7,    23.9 28.9 30.6 22.2,.  increasing to 1700A

 Wednesday, December 13, 2023, 14:24 at 1700A    temps:  33.5 30.2       24.3 29.3 31.5 22.4

 Wednesday, December 13, 2023, 14:35  temps stable :   34.2 31.0       24.3 30.0 32.0 22.6 increasing to 1800A

Wednesday, December 13, 2023, 14:38  at 1800A. temps:    35.0 31.3      24.6 30.3 32.7 22.8

 Wednesday, December 13, 2023, 14:47  temps:   35.8 32.0      24.7 31.2 33.3 22.8

 Wednesday, December 13, 2023, 14:58   temps stable. 36.0 32.2    24.7 31.2 33.3 23.1       turning down power supply

 Wednesday, December 13, 2023, 15:23 power supply off. strip tool data dumped to test1.txt --- copy this elsewhere. TCs left to continue monitoring for any additional cooldown.

Wednesday, December 13, 2023, 16:13    tc recording stopped.

 

repeat test

Thursday, December 14, 2023, 15:18    tcs start time

Thursday, December 14, 2023, 15:20  increasing TGHT from ATTS directly to 1500A and waiting for steady state temperature. Aiming for similar ramp rate to previous ~1A/s, 60A/min.   tcs at cold read 21.9 21.9... 21.1 20.9 20.9 20.7

 Thursday, December 14, 2023, 15:39  at 1500A

Thursday, December 14, 2023, 15:50   after~10min, temps at 31.3 28.4... 23.6 27.6 29.1 22.3

 Thursday, December 14, 2023, 15:59 after ~20min, temps at 31.5 28.6.... 23.5 27.5 28.8 22.5.    stable.  increasing to 1800A

 Thursday, December 14, 2023, 16:03  at 1800A 

Thursday, December 14, 2023, 16:14   after 10min - 35.8 31.8      24.7 30.8 32.6 23.1

 Thursday, December 14, 2023, 16:25  after 20min - 36.3 32.2     24.7 30.9 32.6 23.4    stable.   decreasing current.

Thursday, December 14, 2023, 16:42    0A... cooling for a while

 Thursday, December 14, 2023, 16:56  22.8 22.8    21.1 21.0 21.2 20.8

Entry  Thursday, January 18, 2024, 10:44, Aaron Schmidt, , , , , , , Done, Thermal tests 2 

December 18 - January 15. Were not logged. Placed holder. Aurelia's tests. Included thermocouples in the oven & ionizer.

Entry  Thursday, January 18, 2024, 10:47, Aaron Schmidt, , , , , , , Problems/Solutions, FC0 Solenoid Replaced. 

Issues with valve operations due to a leak in the solenoid valve above FC0. The HPA leak did not allow for sufficient pressure to remain in the lines to operate. The solenoid as changed this morning.

Thursday, January 18, 2024, 10:32: Roughing. Valves can be cycled. FC0 cycled. OK.

Thursday, January 18, 2024, 10:40: TMS TP6 & TMS:TP2 on.

Thursday, January 18, 2024, 10:45: IG6 on.

 

Entry  Tuesday, February 06, 2024, 14:09, Aaron Schmidt, , , , , , , Problems/Solutions, FC0 Solenoid issue 

Tuesday, February 06, 2024, 14:06: Attempted to 'Close' FC0. While it succeeded in moving into position, HPA rushed out of the exhaust. This solenoid was replaced recently on January 18th. Requires replacement. (ordered)

Reference: https://elog.triumf.ca/TIS/Test-Stand/990

Stores PN: 01-7/01026

Valve, Solenoid, 24 Volt 5 Port

Entry  Friday, February 16, 2024, 05:03, Aaron Schmidt, , , , , , , Problems/Solutions, Coil PS issue Coil_PS_Control_Card.png

15-02-2024

The coil PS control card is fried. Roughly since the beginning of December. The PS was removed.

See attached image.


New PS was installed on Friday.

Tuesday, February 20, 2024, 08:01: Check Coil  not responding.

Tuesday, February 20, 2024, 09:48: System check 2: TGHT / TBHT manually to 5 / 5 A. BIAS / EE / EZL to 1 / -0.5 / 1 kV. Anode to 50 V.

Coil set to 15 A, did not adjust.

Tuesday, February 20, 2024, 12:04: Coil PS SW1-7 switch in was in an "Off" position & wouldn't allow the voltage signal through to the PS. Switched to "on". Coil tapped to 7 A manually & back to 0 A ok.

Fixed*

 

Entry  Tuesday, February 20, 2024, 14:22, Aaron Schmidt, , , , , , , , Set to Cathode BIAS Mode 

Tuesday, February 20, 2024, 14:20: TS to wired to Cathode BIAS mode as per ISK4563D.


Monday, March 11, 2024, 13:59: Power supply polarity switched to negative.