948
|
Monday, December 05, 2022, 15:41 |
Aaron Schmidt | | | | | | | | Source tray insulator replacement | Monday, December 05, 2022, 15:38: Source Tray TGHT & TBHT insulators replaced.
Torqued @ 75 in-lbs. (Reference image attached)
|
953
|
Wednesday, December 21, 2022, 17:06 |
Carla Babcock | | | | | | | | Prep for power outage | Source and beamline power supplies turned off in EPICS
HV cage power off
Magnet ramped down and power supplies turned off manually (bira and tdk lambda)
VME crates and kepco turned off
Water lines closed
Will turn off pumps remotely later. Left PLC on |
954
|
Tuesday, January 03, 2023, 10:03 |
Carla Babcock | | | | | | | | Recovery from power outage | Easy recovery after power outage, just had to power cycle the ground PLC IOC and the BiRa IOC.
Test stand vacuum currently pumping down again. Water and HV elements still off.
Tuesday, January 03, 2023, 11:13: Reset IG6 - Filament 2. Vacuum 7.22e-06T - AS
Tuesday, January 03, 2023, 14:00: Both Turbo pumps on.
Tuesday, January 03, 2023, 14:27: Vacuum @ 2.32e-06T
Tuesday, January 03, 2023, 14:28: FS#2 opened. Vacuum ok.
Tuesday, January 03, 2023, 14:29: FS#3 opened. Vacuum ok.
Tuesday, January 03, 2023, 14:30: FS#4 opened. Vacuum ok.
Tuesday, January 03, 2023, 14:31: FS#5 opened. Vacuum ok. Stable @ (2.24-2.32)e-06T. - AS |
957
|
Tuesday, January 17, 2023, 09:48 |
Aaron Schmidt | | | | | | | Problems/Solutions | TMS:RP2 Failure | Tuesday, January 17, 2023, 09:48: TMS:RP2 off. Audible failure was in progress. Also observable on the strip tool. Vacuum group contacted.
|
961
|
Thursday, April 13, 2023, 11:07 |
Aaron Schmidt | | | | | | | In progress | Installation of new IDP-15 TMS:TP2 | IDP15 Scroll Pump, Std w/ inlet.
TMS:RP2
PN: X3815-64010
Serial: MY2301SA17
Thursday, April 13, 2023, 11:04: Roughing RP2
Thursday, April 13, 2023, 11:05: Open BV6 & BV2
Thursday, April 13, 2023, 11:15: TMS:TP2 & TMS:TP6 on.
Thursday, April 13, 2023, 11:19: IG6 on.
Thursday, April 13, 2023, 12:05: Vacuum @ 1.43e-05T. |
968
|
Thursday, May 25, 2023, 13:47 |
Aaron Schmidt | | | | | | | | Rough down empty chamber | Thursday, May 25, 2023, 13:47: Roughing. |
970
|
Thursday, June 08, 2023, 14:22 |
Aaron Schmidt | | | | | | | | Rough down empty chamber | Thursday, June 08, 2023, 14:22: Roughing. |
972
|
Monday, July 10, 2023, 15:01 |
Aaron Schmidt | | | | | | | | Pump down empty chamber | Monday, July 10, 2023, 15:01: Roughing.
Wednesday, July 12, 2023, 09:38: Venting both chambers. |
973
|
Thursday, July 13, 2023, 07:37 |
Aaron Schmidt | | | | | | | | Tests - Aurelia L | Thursday, July 13, 2023, 07:37: Chamber is vented. Beamline is vented. Interlock bypassed on TPS:IV4 - AS |
977
|
Wednesday, August 16, 2023, 11:32 |
Aaron Schmidt | | | | | | | | Pump down empty chamber | Wednesday, August 16, 2023, 11:32: Roughing.
Thursday, August 17, 2023, 11:01: Venting. |
979
|
Tuesday, August 29, 2023, 12:14 |
Aaron Schmidt | | | | | | | | Pump down empty chamber | Tuesday, August 29, 2023, 12:14: Roughing.
Tuesday, August 29, 2023, 13:17: TP1B started.
Tuesday, August 29, 2023, 13:21: TP1B on.
Tuesday, August 29, 2023, 13:46: TP1A started.
Tuesday, August 29, 2023, 14:00: TP1A Tripped.
Tuesday, August 29, 2023, 14:20: TP1B off. |
981
|
Thursday, September 28, 2023, 13:42 |
Aaron Schmidt | | | | | | | | Pump down empty chamber | Thursday, September 28, 2023, 13:40: Roughing - BB.
Tuesday, October 10, 2023, 14:08: Venting. |
987
|
Tuesday, December 12, 2023, 12:41 |
Aaron Schmidt | | | | | | | Done | Source Tray / TS inspection | Tuesday, December 12, 2023, 12:39: Visual inspection.
Source tray: OK. Minor cracks on insulator near the coil conductor. Small chip in the upper TBHT insulator as well.
Water blocks: No leaks.
Pumping: TMS:RP2 recently purged. Otherwise all TP & RP OK.
Door seals: OK. |
988
|
Tuesday, December 12, 2023, 16:11 |
Dave Neilson | Shunt #0 | | | | - | - | | P2N Thermal Test | Tuesday, December 12, 2023, 16:07 - Pumping down test stand overnight for testing tomorrow. vacuum good, turbos starting now. Four thermocouples attached inside. tc1: high on (+) TGHT leg, pins 1+2. tc2: at target terminal (+), pins 4+5. tc3: at target terminal (-), pins 6+7. tc4: low on (+) TGHT leg, pins 8+9.
Wednesday, December 13, 2023, 09:32 : Vacuum at 8.2e-7 T. Electrical team is finishing connecting the cables. Claim it will be complete at 11am.
Wednesday, December 13, 2023, 11:41Started both tc loggers at 11:40 - important for offset time. Beginning ramp as well on ATTS TGHT. set vacuum values high at 1e3 1e4 to bypass ATTS interlock, which does not apply here. ramping to 600A with step increment 10A and wait interval 10s.
ATTS TGHT claims ramping in progress, but increased voltage is reported only on the autoramp window, which reports increasing the target amperage by 10A each 10s. However, no increased voltage reading is reported there, nor is there any increased current. ATTS:TGHT:RDCUR and ATTS:TGHT:RDVOL are ~0 as well. No increased temperature on any of 6 tc channels.
Wednesday, December 13, 2023, 11:57 ATTS TGHT power supplies appear to be under local control. It also appears (low current right now) that the value reported in EPICS is 1/3 of the value reported on the master power supply. It may be that the epics value is per output of the individual 3 supplies, while the total output is reported on the PS display. Planning to now increase to 300A and reach steady state.
Wednesday, December 13, 2023, 12:13 : 1/3 ratio idea confirmed at 33A EPICS reading / 100A master reading and again at 100A EPICS reading / 300A master reading. 300A now reached. Waiting for 20min. Temps inside ~ 21°C. Temps on feed through terminals ~22°C
Wednesday, December 13, 2023, 12:26: 200epics 600A master. tc out: 23.0, 22.6. tc in: 21.4 21.7 22.0 20.8. waiting
Wednesday, December 13, 2023, 12:36 No temp change over 10 min. increasing to 900A
Wednesday, December 13, 2023, 12:47: 900A. outside tc 24.5 23.7°C. inside tc 21.7 23 23.6 21.0 °C.
Wednesday, December 13, 2023, 13:04: increasing to 1200A
Wednesday, December 13, 2023, 13:11 1200A. outside tc 27.1 25.4. inside tc 22.6 24.8 25.9 21.7 °C. Will wait to observe stability
Wednesday, December 13, 2023, 13:20 after ~10min. outsideTC: 27.6 25.9. insideTC: 22.5 25.2 26.1 21.8 °C. Temperatures appear stable. increasing to 1300A
Wednesday, December 13, 2023, 13:25 at 1300A. outsideTC: 28.3 26.5, insideTC: 22.8 25.7 26.8 21.8. waiting for stability
Wednesday, December 13, 2023, 13:38 after ~10min, outsideTC 29.1 27.1, insideTC 23.2, 26.2, 27.4, 21.9. stable. Increasing to 1400A
Wednesday, December 13, 2023, 13:41: 1400A. outsideTC 29.8, 27.6. insideTC 23.4 26.7 28.2 21.4
Wednesday, December 13, 2023, 13:50 temps look stable 30.1 27.9, 23.3 27.7 28.4 21.4 . going to increase to 1500A ---- turning off turbo pumps in case of failure at high current
Wednesday, December 13, 2023, 13:57 at 1500A. temps: 30.9 28.3. 23.6 27.2 28.9 21.8 .
Wednesday, December 13, 2023, 14:07 temps look stable: 31.5 28.8... 23.6 28.0 29.4 22.0 going to increase to 1600A
Wednesday, December 13, 2023, 14:10 at 1600A temps: 32.0 29.1..... 23.8 28.2 30.0 22.2
Wednesday, December 13, 2023, 14:20 temps stable: 32.8 29.7, 23.9 28.9 30.6 22.2,. increasing to 1700A
Wednesday, December 13, 2023, 14:24 at 1700A temps: 33.5 30.2 24.3 29.3 31.5 22.4
Wednesday, December 13, 2023, 14:35 temps stable : 34.2 31.0 24.3 30.0 32.0 22.6 increasing to 1800A
Wednesday, December 13, 2023, 14:38 at 1800A. temps: 35.0 31.3 24.6 30.3 32.7 22.8
Wednesday, December 13, 2023, 14:47 temps: 35.8 32.0 24.7 31.2 33.3 22.8
Wednesday, December 13, 2023, 14:58 temps stable. 36.0 32.2 24.7 31.2 33.3 23.1 turning down power supply
Wednesday, December 13, 2023, 15:23 power supply off. strip tool data dumped to test1.txt --- copy this elsewhere. TCs left to continue monitoring for any additional cooldown.
Wednesday, December 13, 2023, 16:13 tc recording stopped.
repeat test
Thursday, December 14, 2023, 15:18 tcs start time
Thursday, December 14, 2023, 15:20 increasing TGHT from ATTS directly to 1500A and waiting for steady state temperature. Aiming for similar ramp rate to previous ~1A/s, 60A/min. tcs at cold read 21.9 21.9... 21.1 20.9 20.9 20.7
Thursday, December 14, 2023, 15:39 at 1500A
Thursday, December 14, 2023, 15:50 after~10min, temps at 31.3 28.4... 23.6 27.6 29.1 22.3
Thursday, December 14, 2023, 15:59 after ~20min, temps at 31.5 28.6.... 23.5 27.5 28.8 22.5. stable. increasing to 1800A
Thursday, December 14, 2023, 16:03 at 1800A
Thursday, December 14, 2023, 16:14 after 10min - 35.8 31.8 24.7 30.8 32.6 23.1
Thursday, December 14, 2023, 16:25 after 20min - 36.3 32.2 24.7 30.9 32.6 23.4 stable. decreasing current.
Thursday, December 14, 2023, 16:42 0A... cooling for a while
Thursday, December 14, 2023, 16:56 22.8 22.8 21.1 21.0 21.2 20.8 |
989
|
Thursday, January 18, 2024, 10:44 |
Aaron Schmidt | | | | | | | Done | Thermal tests 2 | December 18 - January 15. Were not logged. Placed holder. Aurelia's tests. Included thermocouples in the oven & ionizer. |
990
|
Thursday, January 18, 2024, 10:47 |
Aaron Schmidt | | | | | | | Problems/Solutions | FC0 Solenoid Replaced. | Issues with valve operations due to a leak in the solenoid valve above FC0. The HPA leak did not allow for sufficient pressure to remain in the lines to operate. The solenoid as changed this morning.
Thursday, January 18, 2024, 10:32: Roughing. Valves can be cycled. FC0 cycled. OK.
Thursday, January 18, 2024, 10:40: TMS TP6 & TMS:TP2 on.
Thursday, January 18, 2024, 10:45: IG6 on.
|
994
|
Tuesday, February 06, 2024, 14:09 |
Aaron Schmidt | | | | | | | Problems/Solutions | FC0 Solenoid issue | Tuesday, February 06, 2024, 14:06: Attempted to 'Close' FC0. While it succeeded in moving into position, HPA rushed out of the exhaust. This solenoid was replaced recently on January 18th. Requires replacement. (ordered)
Reference: https://elog.triumf.ca/TIS/Test-Stand/990
Stores PN: 01-7/01026
Valve, Solenoid, 24 Volt 5 Port |
995
|
Friday, February 16, 2024, 05:03 |
Aaron Schmidt | | | | | | | Problems/Solutions | Coil PS issue | 15-02-2024
The coil PS control card is fried. Roughly since the beginning of December. The PS was removed.
See attached image.
New PS was installed on Friday.
Tuesday, February 20, 2024, 08:01: Check Coil not responding.
Tuesday, February 20, 2024, 09:48: System check 2: TGHT / TBHT manually to 5 / 5 A. BIAS / EE / EZL to 1 / -0.5 / 1 kV. Anode to 50 V.
Coil set to 15 A, did not adjust.
Tuesday, February 20, 2024, 12:04: Coil PS SW1-7 switch in was in an "Off" position & wouldn't allow the voltage signal through to the PS. Switched to "on". Coil tapped to 7 A manually & back to 0 A ok.
Fixed*
|
997
|
Tuesday, February 20, 2024, 14:22 |
Aaron Schmidt | | | | | | | | Set to Cathode BIAS Mode | Tuesday, February 20, 2024, 14:20: TS to wired to Cathode BIAS mode as per ISK4563D.
Monday, March 11, 2024, 13:59: Power supply polarity switched to negative. |
998
|
Monday, February 26, 2024, 10:24 |
Aaron Schmidt | | | | | | | Problems/Solutions | TMS:RP2 purge. TS exhaust clearing. + TMS:TP6 | Monday, February 26, 2024, 10:12:
While attempting to cycle FC0, noticed that the turbo pumps TMS:TP6 & TMS:TP2 were off, with TP2 being tripped off. The vacuum on TMS:CG2A sat around 0.825T although RP2 was running. The ballast plug has since been removed to allow for a 2 hour purge of the roughing pump.
Thursday, February 29, 2024, 13:10: Backing pressure still had not stabilized. RP2 removed & taken to Vacuum Group.
Wednesday, March 06, 2024, 10:28:
Tip seals were replaced by Vacuum Group. Roughing.
Wednesday, March 06, 2024, 10:31: TMS:TP6 & TMS:TP2 on.
Wednesday, March 06, 2024, 10:49: TP6 has tripped twice. TP2 ok.
Wednesday, March 06, 2024, 12:25: Venting. TP6 is not operating above 3 krpm.
Vacuum Group acquired TP6. It was nearly seized.
Wednesday, March 06, 2024, 14:57: Varian 551 pump installed from the furnace behind the TS. Roughing.
Friday, March 08, 2024, 06:58: Soft start initiated.
Friday, March 08, 2024, 08:47: TP6 at speed. |
|