  Test-Stand, Page 50 of 53  Not logged in ELOG logo
New entries since:Wed Dec 31 16:00:00 1969
  ID Date Author Target/No.# Sourcedown Station Module Target Oven W.O# Heat Shield W.O# Status Subject Text Attachments
  913   Monday, March 21, 2022, 13:59 Carla Babcock       3rd mass marker test3rd version of the mass marker target has
been installed. This one is further back
on the heat shield, and has a longer ceramic
  
  914   Monday, April 04, 2022, 20:44 Carla Babcock       Change from 9-pin connectors to 5-pin connectorsSwapped the old 9pin connectors out and
replaced with 2 5-pin connectors, same as
on the modules.
 5pin_pinout_April42022.png 
  915   Monday, April 04, 2022, 20:56 Carla Babcock       wiring reverted for cathode-bias FEBIADWiring which was changed to run the mass
marker tests has been reverted:

    anode bias cable connected
  
  917   Thursday, April 07, 2022, 11:19 Aaron SchmidtTest FEBIAD TM2-2022 ITWTM2 42752-5 Test FEBAID & TS operation Gas system switched on manually to
use Ar & calibrated leak.
Thursday, April 07, 2022, 10:25:
  
  918   Monday, April 11, 2022, 14:52 Aaron Schmidt      Problems/SolutionsTP6 controller Monday, April 11, 2022, 13:58: Controller
for TP6 is dead. Literally smokes if you
try to use it.
  
  919   Wednesday, April 13, 2022, 07:46 Aaron Schmidt      Problems/SolutionsWater leakWednesday, April 13, 2022, 07:38: Appears
to have a water leak. Vacuum @ 8.48e-06T.
All power / sources shut off. (Had already
  
  920   Wednesday, April 20, 2022, 13:42 Aaron Schmidt       Vent Beamline halfAurelia to do a visual test later.
Wednesday, April 20, 2022, 13:41:
IG6 Off. TP6 & TP2 off.
  
  921   Thursday, April 21, 2022, 13:38 Aaron Schmidt      Problems/SolutionsLeak checkshttps://elog.triumf.ca/TIS/Test-Stand/919
Vacuum Group LD#1
(A) Top feed through fittings upgraded
  
  929   Friday, May 27, 2022, 07:19 Fernando Maldonado      DoneFEBIAD parameter scan web-app and brief description (with links)A web-app for systematic FEBIAD parametrizations
has been develop and  now includes the
ISAC Test Stand (ITS) :
  
  930   Tuesday, May 31, 2022, 13:35 Aaron SchmidtUCx HS ITWTM2 44378-19In progressConditioning UC#38 assemblyUsing a broken LP-FEBIAD source. TGHT only.
Tuesday, May 31, 2022, 13:24: Roughing.
Tuesday, May 31, 2022, 13:54: TP1B
  
  933   Monday, June 20, 2022, 11:49 Aaron Schmidt       Pump down empty chamberMonday, June 20, 2022, 11:49: Water line
loop installed. Roughing.

Thursday, June 23, 2022,
  
  935   Thursday, June 30, 2022, 13:50 Aaron Schmidt       Pump down empty chamberThursday, June 30, 2022, 13:46: Roughing.

Thursday, July 07, 2022,
15:00: Venting.
  
  937   Sunday, July 10, 2022, 22:19 Aaron Schmidt      Problems/SolutionsTP2 Trip / TMS:RP2 issue Sunday, July 10, 2022, 22:19: A trip
was noted on TP2. the backing pressure is
quite high. Shutting off the turbo pumps
  
  938   Monday, July 11, 2022, 09:17 Aaron Schmidt      In progressPump down empty chamberMonday, July 11, 2022, 09:15: Roughing.   
  939   Tuesday, August 30, 2022, 13:58 Aaron Schmidt    44062-744378-25In progressConditioning UC#40 assemblyConditioning the UC#40 LP-SIS assembly
& ISAC TS main vacuum chamber. Straight
/ round oven in use (TGHT only).
  
  941   Thursday, September 29, 2022, 13:50 Aaron Schmidt      In progressPump down empty chamberWater loop installed.
Thursday, September 29, 2022, 13:50:
Roughing
  
  943   Wednesday, October 19, 2022, 12:16 Aaron Schmidt       Test Stand controls changedgenepicsas.triumf.ca
x11 enabled.
Then use login credentials.
  
  945   Tuesday, November 15, 2022, 15:32 Sam Gupta       ATTS tantalum Bracket Heating testHeated up sample 01 for the second time
and measured the temperature with increasing
current. Used pyrometre to measure temperature
  
  946   Wednesday, November 16, 2022, 13:28 Aaron Schmidt      Problems/SolutionsTSG:TP1A Replaced See elog 944
Wednesday, November 16, 2022, 13:23:
TP1 A replaced
  
  947   Wednesday, November 23, 2022, 13:52 Aaron Schmidt     44378-14In progressFEBIAD Coil TestsSam G. & Navid N.
Work Permit# C2022-11-23--1
Wednesday, November 23, 2022, 13:51
  