  913   Monday, March 21, 2022, 13:59 Carla Babcock       3rd mass marker test

3rd version of the mass marker target has been installed. This one is further back on the heat shield, and has a longer ceramic piece attached. There are three thermocouples as follows:

Thermocouple Source tray pins Rack position Target location

TC1

1,2  4,5  ceramic feeder tube
TC2 4,5  1,2  Right side oven
TC3 8,9  6,7  Left side oven

 

Monday, March 21, 2022, 13:55 : Roughing down.

Monday, March 21, 2022, 16:45 : Turbos have been on for a few hours. Starting water.

Monday, March 21, 2022, 17:20 : Only TC1 has to be tested with heating and maybe swapped if it is the wrong way around. Otherwise ready to go.

 

Thursday, March 24, 2022, 10:51 : Ramping up heaters to test thermocouples.


AS:

Monday, April 04, 2022, 09:10: Power locked out. IG1 & Turbo pumps off. HV top cage removed.

  914   Monday, April 04, 2022, 20:44 Carla Babcock       Change from 9-pin connectors to 5-pin connectors

Swapped the old 9pin connectors out and replaced with 2 5-pin connectors, same as on the modules.

See attached for current pin out diagram. Many of the wires are too short to reach the bottom sockets, so wires 2, 8, 9 are not connected in the connector. 4 spots are empty on connector 2 (right).  (6, 7) and (4, 5) are twisted pairs. Unused wires are tapped up out of the way, but we should improve this, the tape may come loose due to heat and then the wires could present an HV risk. (Update: added some wire to hold them in place. Slightly better...)

Need to either extend the wires, or put in new ones. All wires are grounded on the rack.

In addition, there are two screws in each connector which are floating right now. Need to make a connection for them but should be ok if we dont go to really high voltages.

Attachment 1: 5pin_pinout_April42022.png
5pin_pinout_April42022.png
  915   Monday, April 04, 2022, 20:56 Carla Babcock       wiring reverted for cathode-bias FEBIAD

Wiring which was changed to run the mass marker tests has been reverted:

  • anode bias cable connected to "B"
  • tube negative attached to HV common through "B" to "F" connection

Ready for cathode biased FEBIAD operation.

  917   Thursday, April 07, 2022, 11:19 Aaron SchmidtTest FEBIAD TM2-2022 ITWTM2 42752-5 Test FEBAID & TS operation

 Gas system switched on manually to use Ar & calibrated leak.

Thursday, April 07, 2022, 10:25: Roughing. 

Thursday, April 07, 2022, 11:17: TP1B on.

Thursday, April 07, 2022, 12:55: TP1A on.

Thursday, April 07, 2022, 14:42: SV5 on. Power /  sources on.

Thursday, April 07, 2022, 14:44: IV4 open. Optics on. Vacuum @ 2.7e-06T.

Thursday, April 07, 2022, 14:47: System check:

TGHT / TBHT @ 10 A. Coil @ 10A.

BIAS /  EE / EZL @ 1 / -0.5 / 1 kV. Anode @ 50V

OK. Set.

Thursday, April 07, 2022, 14:49: Auto-ramping TGHT / TBHT to 350 / 150 A @ 2 A per min.

Thursday, April 07, 2022, 14:51: BIAS /  EE / EZL @ 0 kV. Anode @ 0V


Friday, April 08, 2022, 05:44: Auto-ramping TGHT / TBHT to 500 / 200 A @ 2 A per min.

Friday, April 08, 2022, 05:51: BIAS / EE / EZL @ 20 / -1.0 / 7.5 kV.

Coil @ 20 A, Anode @ 100 V.

Friday, April 08, 2022, 10:01: Auto-ramping TGHT / TBHT to 580 / 270 A @ 2 A per min.

BIAS / EE / EZL @ 30 / -1.5 / 13 kV.

Friday, April 08, 2022, 11:15: TBHT @ 290 A. 

Friday, April 08, 2022, 12:09: Mass & wire scans complete. HV to 0kV. Anode to to V. Auto cooling @ 1 A per min. Coil @ 0 A. 


Monday, April 11, 2022, 07:25: Auto-ramping TGHT /TBHT to 580 / 290 A @ 2 A per min.  

Monday, April 11, 2022, 13:48: BIAS / EE / EZL 30 / -1.5 / 13 kV. Mass & wire scans started.

Wire scans good.

Monday, April 11, 2022, 13:58: Controller for TP6 is dead. Literally smokes if you try to use it.

Monday, April 11, 2022, 14:05: HV to 0 kV / Off. IV4 closed. Anode & Coil to 0.


Tuesday, April 12, 2022, 07:14: Vacuum instability noted. 2 spikes to 4.6e-06T. Back to 2.48e-06T. BIAS / EE / EZL 30 / -1.5 / 13 kV. IV4 opened. Coil to 10 A. Anode to 100 V Optics standard tune set.

Mass & wire scans started.

Tuesday, April 12, 2022, 08:16: FM tune used. Mass & wire scans ok. Minor vacuum instability continues. Begin auto-cooling @ 2 A per min.

Tuesday, April 12, 2022, 08:27: Coil, Anode off. HV off. Closed SV5. Closed IV4

 

  918   Monday, April 11, 2022, 14:52 Aaron Schmidt      Problems/SolutionsTP6 controller

Monday, April 11, 2022, 13:58: Controller for TP6 is dead. Literally smokes if you try to use it.

Monday, April 11, 2022, 14:51: TP6 Controller is replaced. TP6 on.

  919   Wednesday, April 13, 2022, 07:46 Aaron Schmidt      Problems/SolutionsWater leak

Wednesday, April 13, 2022, 07:38: Appears to have a water leak. Vacuum @ 8.48e-06T. All power / sources shut off. (Had already tripped).

Wednesday, April 13, 2022, 07:44: All waterlines closed. Water leak confirmed. Vacuum dropped to 2.33e-06T.

Wednesday, April 13, 2022, 08:23: Vacuum @ 2.06e-06T.

Wednesday, April 13, 2022, 08:28: Open FS#2. Vacuum @ 2.06e-06T.

Wednesday, April 13, 2022, 08:34: Vacuum @ 2.06e-06T. Open FS#3. Vacuum @ 2.06e-06T.

Wednesday, April 13, 2022, 08:39:. Open FS#4. immediate spike to 2.57e-06T.

Wednesday, April 13, 2022, 08:44: All lines closed & purged.

Wednesday, April 13, 2022, 08:47: Opened FS#4 w/ added air pressure (40 PSI). Immediate spike noticed.

Wednesday, April 13, 2022, 08:50: FS#5 Pressurized. No change. Leak appears on FS#4.

Wednesday, April 13, 2022, 08:51: IG1 & Turbo pumps off.

 

  920   Wednesday, April 20, 2022, 13:42 Aaron Schmidt       Vent Beamline half

Aurelia to do a visual test later.

Wednesday, April 20, 2022, 13:41: IG6 Off. TP6 & TP2 off.


Tests by AL were complete. Installed a fresh gasket on the rear window.

Thursday, April 21, 2022, 12:04: BV6 open. Roughing.

Thursday, April 21, 2022, 12:06: BV2 open.

Thursday, April 21, 2022, 12:11: TMS:TP6 on.

Thursday, April 21, 2022, 12:15: TMS:TP2 on.

Thursday, April 21, 2022, 12:16: TMS:TP6 Green.

Thursday, April 21, 2022, 12:20: TMS:TP2 Green.

  921   Thursday, April 21, 2022, 13:38 Aaron Schmidt      Problems/SolutionsLeak checks

https://elog.triumf.ca/TIS/Test-Stand/919

Vacuum Group LD#1

(A) Top feed through fittings upgraded

Thursday, April 21, 2022, 13:11: Pumping directly on FS#4-Line A (TBHT). Leak rate @ 0.0E-07 atm-cc/sec.

Thursday, April 21, 2022, 13:13: Sprayed He on Block (A) & the TBHT solder joints. No signal change.

(B) Top feed through fittings upgraded.

Thursday, April 21, 2022, 13:39: Pumping directly on FS#4-Line B (TBHT). Leak rate @ 0.0E-07 atm-cc/sec.

Thursday, April 21, 2022, 13:42: Sprayed He on Block (A) & the TBHT solder joints. Dips up to a Leak rate @ 0.1E-07 atm-cc/sec & back to 0.0.

Disconnect LD. Will need to pressurize w/ He.

Thursday, April 21, 2022, 14:09: Pressurize FS#4-Line B (TBHT) to 50 PSI.

Thursday, April 21, 2022, 14:20: False positives. Saturated the area w/ He. LD off & lines depressurized.


Tuesday, April 26, 2022, 11:14: Leak rate @ 0.0E-07 atm-cc/sec. (No He)

Tuesday, April 26, 2022, 11:15: Pressurize FS#4-Line B (TBHT) to 120 PSI.

Tuesday, April 26, 2022, 11:20: Checked TBHT solder joints & water block (B). Leak rate @ 0.0E-07 atm-cc/sec. Disconnect, purge, & swap fittings to (A)

Tuesday, April 26, 2022, 11:31: Pressurize FS#4-Line A (TBHT) to 120 PSI. Leak rate @ 0.0E-07 atm-cc/sec

Tuesday, April 26, 2022, 11:38: Checked TBHT solder joints & water block (A). Leak rate @ 0.4E-07 atm-cc/sec on the water block.  Disconnect, purge.


Wednesday, April 27, 2022, 10:38: Indium gasket installed on FS#4-Line A water block.

Wednesday, April 27, 2022, 10:43: Leak rate @ 0.0E-07 atm-cc/sec. (No He)

Wednesday, April 27, 2022, 10:44: Spiked as soon as He was applied.

Wednesday, April 27, 2022, 11:14: Line A removed.

Wednesday, April 27, 2022, 11:40: Line A reinstalled after inspection w/ new Indium gasket fitted. Gasket only. No C-Seal.

Wednesday, April 27, 2022, 11:44: Leak rate @ 0.0E-07 atm-cc/sec. (No He)

Wednesday, April 27, 2022, 11:46: Spiked as soon as He was applied.

Wednesday, April 27, 2022, 11:53: New Indium gasket fitted. Gasket only. No C-Seal.

Leak rate @ 0.0E-07 atm-cc/sec. (No He)

Wednesday, April 27, 2022, 11:54: Pressurize to 30 PSI. Leak rate @ 0.0E-07 atm-cc/sec

Wednesday, April 27, 2022, 11:57: Pressurize to 50 PSI. Leak rate gradually increased to the (X)E-05 atm-cc/sec range.


Multiple leak checks & gasket attempts Thursday.


Monday, May 02, 2022, 09:45: Indium gasket installed w/ 90-100 inch pounds of torque. Used a heat gun up to 90. Allowed to cool, then given one more tightening.

Monday, May 02, 2022, 09:57: Leak rate @ 0.0E-08 atm-cc/sec. (No He) using the sniffer.

Monday, May 02, 2022, 09:59: Initial leak rate @ 0.0E-08 atm-cc/sec. (w/ 120 PSI He)

Monday, May 02, 2022, 10:11: Leak rate @ 0.0E-08 atm-cc/sec. (w/ 120 PSI He).

Monday, May 02, 2022, 10:20: BV1B open. Rouging

Monday, May 02, 2022, 10:22: BV1A open.

Monday, May 02, 2022, 11:51: TP1B on.

Monday, May 02, 2022, 11:57: TP1A on.

Monday, May 02, 2022, 12:05: IG1 on.

Monday, May 02, 2022, 12:10: Vacuum @ 4.19e-05T & dropping.

Monday, May 02, 2022, 13:59: Vacuum @ 1.33e-05T

Monday, May 02, 2022, 14:04: FS#4 open. Vacuum @ 1.33e-05T. Stable. No immediate Spike.

Monday, May 02, 2022, 14:05: FS#2 open. Vacuum @ 1.33e-05T.

Monday, May 02, 2022, 14:06: FS#3 open. Vacuum @ 1.33e-05T.

Monday, May 02, 2022, 14:09: FS#5 open. Vacuum @ 1.33e-05T. Stable.

 

  929   Friday, May 27, 2022, 07:19 Fernando Maldonado      DoneFEBIAD parameter scan web-app and brief description (with links)

A web-app for systematic FEBIAD parametrizations has been develop and  now includes the ISAC Test Stand (ITS) :

https://beta.hla.triumf.ca/degaussing/FEBIAD-scan/

Upon landing in the web-app the ITS will be selected by default as well as the TMS:FC6:SCALECUR faraday cup, which corresponds the last cup of the ITS beamline.

To run a similar scan but on the total source current (FC0) the field has to change from TMS:FC6:SCALECUR to TMS:FC0:SCALECUR.

 

Each measurement will create a unique id (measurement_id), and the data can be retrieved from

https://beta.hla.triumf.ca/jaya/data/get/measure_id

 

Plot and analysis routines for the data generated by the FEBIAD-scan can be found in 

https://jupyter.triumf.ca/hub/login

for which you need a TRCOMP account. The routines are located in the group folder 

/group/ionsrc/fernando

  930   Tuesday, May 31, 2022, 13:35 Aaron SchmidtUCx HS ITWTM2 44378-19In progressConditioning UC#38 assembly

Using a broken LP-FEBIAD source. TGHT only.

Tuesday, May 31, 2022, 13:24: Roughing.

Tuesday, May 31, 2022, 13:54: TP1B on.

Tuesday, May 31, 2022, 14:06: TP1A on.

Tuesday, May 31, 2022, 14:13: IG1 on.


Wednesday, June 01, 2022, 07:41: Vacuum @ 2.13e-06T. Waterline FS#5 open.

Wednesday, June 01, 2022, 07:43: Power/Sources on.

Wednesday, June 01, 2022, 07:51: Auto-ramping TGHT to 580A @ 2A per min.


Monday, June 06, 2022, 07:09: Auto-cooling @ 2A per min. 


Wednesday, June 08, 2022, 07:07: Turbo pumps off.

Wednesday, June 08, 2022, 07:53: Venting.

  933   Monday, June 20, 2022, 11:49 Aaron Schmidt       Pump down empty chamber

Monday, June 20, 2022, 11:49: Water line loop installed. Roughing.


Thursday, June 23, 2022, 09:25: Venting.

  935   Thursday, June 30, 2022, 13:50 Aaron Schmidt       Pump down empty chamber

Thursday, June 30, 2022, 13:46: Roughing.


Thursday, July 07, 2022, 15:00: Venting.

  937   Sunday, July 10, 2022, 22:19 Aaron Schmidt      Problems/SolutionsTP2 Trip / TMS:RP2 issue

 Sunday, July 10, 2022, 22:19: A trip was noted on TP2. the backing pressure is quite high. Shutting off the turbo pumps for the beamline side.


Monday, July 11, 2022, 06:01: Venting.

Monday, July 11, 2022, 08:12: RP1 off.

Monday, July 11, 2022, 09:01: RP changed. SN#LPA49885

Monday, July 11, 2022, 09:02: Down to 0.032T Fast. TP2 & TP6 on.

Monday, July 11, 2022, 09:08: Pumps up to speed. IG6 on.

  938   Monday, July 11, 2022, 09:17 Aaron Schmidt      In progressPump down empty chamber

Monday, July 11, 2022, 09:15: Roughing.

  939   Tuesday, August 30, 2022, 13:58 Aaron Schmidt    44062-744378-25In progressConditioning UC#40 assembly

Conditioning the UC#40 LP-SIS assembly & ISAC TS main vacuum chamber. Straight / round oven in use (TGHT only).

Tuesday, August 30, 2022, 13:55: BV1B open. Roughing.

Tuesday, August 30, 2022, 14:00: BV1A open.


Wednesday, August 31, 2022, 07:29: Vacuum @ 0.064T. TP1B on. 

Wednesday, August 31, 2022, 07:35: TP1 A on. 

Wednesday, August 31, 2022, 08:56: Vacuum @ 9.97e-06T. Waterline FS#5 opened.

Wednesday, August 31, 2022, 08:58: Vacuum @ 9.95e-06T. OK. Power on.


Thursday, September 01, 2022, 07:50: Vacuum @ 5.21e-06T. 

Thursday, September 01, 2022, 07:54: Manually tapped up TGHT to 50 A.

Limit increased on TGHT parameter setup to 5.500e-06T.

Thursday, September 01, 2022, 07:57: Auto-ramping TGHT to 580 A @ 2 A per min. 


Monday, September 12, 2022, 15:09: Vacuum @ 1.69e-06T. Auto-cooling @ 2A per min. 


Monday, September 26, 2022, 10:52: Turbo pumps off.

Monday, September 26, 2022, 12:20: Venting. PS off & waterlines purged.

  941   Thursday, September 29, 2022, 13:50 Aaron Schmidt      In progressPump down empty chamber

Water loop installed.

Thursday, September 29, 2022, 13:50: Roughing


Tuesday, October 18, 2022, 11:17: Venting

  943   Wednesday, October 19, 2022, 12:16 Aaron Schmidt       Test Stand controls changed

genepicsas.triumf.ca

x11 enabled.

Then use login credentials.

 

Wednesday, October 19, 2022, 12:10: Login. Success


Monday, November 07, 2022, 13:13 Use ATTS on putty page.

New ramping program:

Monday, November 07, 2022, 13:15: Auto-ramping TGHT /  TBHT to 20 A @ 4A per minute. (Testing new auto-ramp)

Monday, November 07, 2022, 13:19: Ramping complete:

  945   Tuesday, November 15, 2022, 15:32 Sam Gupta       ATTS tantalum Bracket Heating test

Heated up sample 01 for the second time and measured the temperature with increasing current. Used pyrometre to measure temperature and calibrated it with the emmissivity values from cassidy

  946   Wednesday, November 16, 2022, 13:28 Aaron Schmidt      Problems/SolutionsTSG:TP1A Replaced

 See elog 944

Wednesday, November 16, 2022, 13:23: TP1 A replaced

Wednesday, November 16, 2022, 13:25: Roughing.

Wednesday, November 16, 2022, 14:53: TP1B on

Wednesday, November 16, 2022, 14:56: TP1B at speed.

Wednesday, November 16, 2022, 14:58: TP1A on.

Wednesday, November 16, 2022, 15:07: TP1A at speed. IG1 on. Vacuum @ 3.32e-05T

 

 

  947   Wednesday, November 23, 2022, 13:52 Aaron Schmidt     44378-14In progressFEBIAD Coil Tests

Sam G. & Navid N.

Work Permit# C2022-11-23--1

Wednesday, November 23, 2022, 13:51 FS#5 on (HS bypassed with a water loop)

Wednesday, November 23, 2022, 13:55: TSG:IG1 Bypass on

Wednesday, November 23, 2022, 14:03: Signage up. Main breaker on.

Wednesday, November 23, 2022, 14:07: FS#5 off & purged. Not needed.

 Wednesday, November 23, 2022, 15:01: measured magnetic field of coil at 8A

end test


 Monday, November 28, 2022, 11:45: start test set up the hall probe with the jig to move it on the table and centered the hall probe in the magnet. signage up Main breaker on

Monday, November 28, 2022, 13:17: start collecting data at 8 amps

Monday, November 28, 2022, 16:11: end test


 Tuesday, November 29, 2022, 10:50:Signage up Main Breaker on Testing started; with current of 8 amps

Taking measurements of temperature at 8A 9A and 10A

Tuesday, November 29, 2022, 15:25 : system locked out and took out magnet

end test


Wednesday, November 30, 2022, 12:40: Test started. Breaker on. signage up. put in low profile magnet with wire ties to keep coils together.

taking data with 8A of current

Wednesday, November 30, 2022, 16:25: end of test power supply off breaker off


 