Monday, February 28, 2022, 08:08, Aaron Schmidt, , LP-SIS, , , , , , Mass marker / Coil-Tube target Test #2
|
Installed & roughing Friday.
Monday, February 28, 2022, 08:07: Turbopump TP1B on.
Monday, February 28, 2022, 09:21: TP1A on. |
Monday, March 21, 2022, 13:59, Carla Babcock, , , , , , , , 3rd mass marker test
|
3rd version of the mass marker target has been installed. This one is further back on the heat shield, and has a longer ceramic piece attached. There
are three thermocouples as follows:
Thermocouple
|
Monday, April 04, 2022, 20:44, Carla Babcock, , , , , , , , Change from 9-pin connectors to 5-pin connectors
|
Swapped the old 9pin connectors out and replaced with 2 5-pin connectors, same as on the modules.
See attached for current pin out diagram. Many of the wires are too short to reach the bottom sockets, so wires 2, 8, 9 are not connected in the
connector. 4 spots are empty on connector 2 (right). (6, 7) and (4, 5) are twisted pairs. Unused wires are tapped up out of the way, but we should |
Monday, April 04, 2022, 20:56, Carla Babcock, , , , , , , , wiring reverted for cathode-bias FEBIAD
|
Wiring which was changed to run the mass marker tests has been reverted:
anode bias cable connected to "B"
tube negative attached to HV common through "B" to "F"
connection
Ready for cathode biased FEBIAD operation. |
Monday, April 11, 2022, 14:52, Aaron Schmidt, , , , , , , Problems/Solutions, TP6 controller
|
Monday, April 11, 2022, 13:58: Controller for TP6 is dead. Literally smokes if you try to use it.
Monday, April 11, 2022, 14:51: TP6 Controller is replaced. TP6 on. |
Wednesday, April 13, 2022, 07:46, Aaron Schmidt, , , , , , , Problems/Solutions, Water leak
|
Wednesday, April 13, 2022, 07:38: Appears to have a water leak. Vacuum @ 8.48e-06T. All power / sources shut off. (Had already tripped).
Wednesday, April 13, 2022, 07:44: All waterlines closed. Water leak confirmed. Vacuum dropped to 2.33e-06T.
|
Wednesday, April 20, 2022, 13:42, Aaron Schmidt, , , , , , , , Vent Beamline half
|
Aurelia to do a visual test later.
Wednesday, April 20, 2022, 13:41: IG6 Off. TP6 & TP2 off.
Tests by AL were complete. Installed a fresh gasket on the rear window. |
Thursday, April 21, 2022, 13:38, Aaron Schmidt, , , , , , , Problems/Solutions, Leak checks
|
https://elog.triumf.ca/TIS/Test-Stand/919
Vacuum Group LD#1
(A) Top feed through fittings upgraded |
Monday, May 02, 2022, 14:10, Aaron Schmidt, , P2N-SIS, , , , , , Empty Chamber PS test.
|
No P2N is loaded. Testing the power supplies.
Tuesday, May 03, 2022, 10:07
In the past few days, the ITS has been reconfigured for P2N operation: |
Monday, May 09, 2022, 10:08, Luca Egoriti, , P2N-SIS, ITE, TM4, , , In progress, P2N heating test
|
Beginning of May:
The cabling on the top of the test stand was changed to adapt for P2N testing. The TGHT and COIL PS were disconnected, and their DC cable terminals
were connected instead to the TDK-LAMBDA P2Nheaters. The configuration on top of the ITS module is the following: |
Friday, May 27, 2022, 07:19, Fernando Maldonado, , , , , , , Done, FEBIAD parameter scan web-app and brief description (with links)
|
A web-app for systematic FEBIAD parametrizations has been develop and now includes the ISAC Test Stand (ITS) :
https://beta.hla.triumf.ca/degaussing/FEBIAD-scan/
Upon landing in the web-app the ITS will be selected by default as well as the TMS:FC6:SCALECUR faraday cup, which corresponds the last cup of |
Monday, June 20, 2022, 11:49, Aaron Schmidt, , , , , , , , Pump down empty chamber
|
Monday, June 20, 2022, 11:49: Water line loop installed. Roughing.
Thursday, June 23, 2022, 09:25: Venting. |
Thursday, June 30, 2022, 13:50, Aaron Schmidt, , , , , , , , Pump down empty chamber
|
Thursday, June 30, 2022, 13:46: Roughing.
Thursday, July 07, 2022, 15:00: Venting. |
Sunday, July 10, 2022, 22:19, Aaron Schmidt, , , , , , , Problems/Solutions, TP2 Trip / TMS:RP2 issue
|
Sunday, July 10, 2022, 22:19: A trip was noted on TP2. the backing pressure is quite high. Shutting off the turbo pumps for the beamline side.
|
Monday, July 11, 2022, 09:17, Aaron Schmidt, , , , , , , In progress, Pump down empty chamber
|
Monday, July 11, 2022, 09:15: Roughing. |
Thursday, September 29, 2022, 13:50, Aaron Schmidt, , , , , , , In progress, Pump down empty chamber
|
Water loop installed.
Thursday, September 29, 2022, 13:50: Roughing
Tuesday, October 18, 2022, 11:17: Venting |
Wednesday, October 19, 2022, 12:16, Aaron Schmidt, , , , , , , , Test Stand controls changed
|
genepicsas.triumf.ca
x11 enabled.
Then use login credentials. |
Tuesday, November 15, 2022, 15:32, Sam Gupta, , , , , , , , ATTS tantalum Bracket Heating test
|
Heated up sample 01 for the second time and measured the temperature with increasing current. Used pyrometre to measure temperature and calibrated it
with the emmissivity values from cassidy |
Wednesday, November 16, 2022, 13:28, Aaron Schmidt, , , , , , , Problems/Solutions, TSG:TP1A Replaced
|
See elog 944
Wednesday, November 16, 2022, 13:23: TP1 A replaced
Wednesday, November 16, 2022, 13:25: Roughing. |
Monday, December 05, 2022, 15:41, Aaron Schmidt, , , , , , , , Source tray insulator replacement 7x
|
Monday, December 05, 2022, 15:38: Source Tray TGHT & TBHT insulators replaced.
Torqued @ 75 in-lbs. (Reference image attached)
|
|