Entry  Wednesday, June 09, 2021, 11:51, Aaron Schmidt, , , , , , , Problems/Solutions, TPS:CB2 issue. 
Tuesday, June 08, 2021, 08:25: IV4 open. Optics set minus TPS:CB2. Shows  as green 'on', set to 500V, however read back shows as 0 V.

Wednesday, June 09, 2021, 08:37: HV off. Attempts made to restart TPS:CB2 unsuccessful. Controls notified.
Wednesday, June 09, 2021, 11:49: Card replaced by controls. Verified "Ok"  in " LB Mode": RDVOL, RDCUR, RDDAC all similar.
Entry  Monday, June 28, 2021, 09:22, Aaron Schmidt, , , , , , , , Empty Chamber 
Monday, June 28, 2021, 09:22: Roughing.
Monday, June 28, 2021, 10:10: TP1B on.
Monday, June 28, 2021, 10:22: TP1A on (Tripped)
Entry  Wednesday, June 30, 2021, 19:08, Fernando Maldonado, , LP-FEBIAD, , , , , Failed, FEBIAD parameter scan - efficiency measurements  anomalous-ionization-regime.pngFernando_screenshots.docx
Wednesday, June 30, 2021, 19:08: Roughing

Thursday, July 01, 2021, 08:57: Turbos on 
Thursday, July 01, 2021, 09:11: TP1A timed out. Reset it. Waiting for CG1A to drop a bit more. 
Entry  Friday, July 30, 2021, 15:34, Carla Babcock, , , , , , , Failed, TSG:RP1 failure 
TP1A tripped off on Fernando, seems the backing pressure got too high. Even with PV1 closed the RP1 pump could not get below 200mTorr. Derek from vacuum
group came and had a look, and is swapping RP1 out for one of the vacuum group pumps, then will see if they can repair ours.
Entry  Tuesday, August 03, 2021, 11:55, Fernando Maldonado, , , , , , , Problems/Solutions, Swapped emmittance meter voltage cables. 
After not being able to get beam through the emittance meter. I diagnosed that the plates was not biased (reason yet unknow).
I swapped the cables from the plates such that it looks like the picture below. With this, I was able to take an emittance scan with the previous
parameters.
Entry  Thursday, August 05, 2021, 08:49, Fernando Maldonado, , , , , , , Problems/Solutions, CANBUS snooper set up to investigate random optics turnining off Annotation_2021-08-06_144737.png20210806_150334.jpg
Problem: Some devices turn off unexpectedly and sometimes without any obvious trigger. In the past, the only time this was an issue
was during mass scans. Now with the automation of measurements, this is a major problem as it prevents longer parameter scans.
Thursday, August 05, 2021, 08:00: Kevin setup the CANBUS snooper by hooking it up on the magnet card loop port.
Entry  Saturday, August 07, 2021, 18:07, Fernando Maldonado, , , , , , , Problems/Solutions, FC0 lasrge oscillation and RMPs offset. Both started today. [Got solved by itself] 
Saturday, August 07, 2021, 18:02: As mentions in previous entries, the FC0 current oscillates with no change on ion source parameters.
Hence, I came on-site to see if there was an issue with the hardware. Nothing obvious.
Last night there were some sparks that might have cause some issue.
Entry  Monday, August 23, 2021, 09:55, Fernando Maldonado, , , , , , , Problems/Solutions, RP1 changed back 
 Monday, August 23, 2021, 09:53: RP1 was swapped back to our original pump. (see e-log
889)
Derek informed that they test it overnight and performed well, and it's a bit slow but it goes down to 20 mT.
Entry  Monday, August 23, 2021, 10:49, Aaron Schmidt - Fernando Maldonado, , , , , , , Problems/Solutions, RGA replaced with a blind flange 
Monday, August 23, 2021, 10:49: Aaron removed the Extorr RGA and install a blind instead.
When the new RGA arrives it will be changed.
Entry  Wednesday, August 25, 2021, 15:30, Ferran Boix Pamies, , , , , , , , Thermocouple high voltage test 
Wednesday, August 25, 2021, 15:29: Roughing.

Thursday, August 26, 2021, 04:11: IG1 switched on. Vacuum @ 8.35e-06T - AS 
Thursday, August 26, 2021, 14:04 Water on, no spike in vacuum. IG1:2.6e-6T
Entry  Tuesday, August 31, 2021, 13:55, Aaron Schmidt, , , , , , , , Pump down chamber 
Pump down chamber w/ empty HS
Entry  Tuesday, September 07, 2021, 16:04, Alexander Shkuratoff, , , , , , , Done, Replaced flange on F/T R with blank flange 
Feedthrough R had a flange installed with a HV feedthrough on it for TM3 service tray prototype HV tests. It was replaced today with the original blank
flange.
Entry  Thursday, September 23, 2021, 07:16, Aaron Schmidt, , , , , , , , Pump down empty chamber & reboot 
Thursday, September 23, 2021, 07:15: Roughing. Waterline loop installed.

Monday, September 27, 2021, 10:35: MB1 off. Turbo pumps, IG, RP, all off/closed. DI water closed/purged.
TS shutdown for planned power outage.
Entry  Wednesday, October 06, 2021, 11:56, Aaron Schmidt, , , , , , , , Pump down empty chamber 
Wednesday, October 06, 2021, 11:56: Roughing.

Thursday, October 14, 2021, 09:07: Venting.
Entry  Wednesday, October 20, 2021, 15:01, Aaron Schmidt, , , , , , , , Pump down empty chamber 
Wednesday, October 20, 2021, 15:01: Roughing.
Entry  Thursday, November 04, 2021, 11:55, Fernando Maldonado, , , , , , , Done, Opening vacuum chamber for thesis pictures :p 
Thursday, November 04, 2021, 11:54: Venting
water loop removed
Thursday, November 04, 2021, 13:39: Roughing
Entry  Tuesday, November 16, 2021, 13:45, Aaron Schmidt, , , , , , , , Pump down empty chamber 
Tuesday, November 16, 2021, 13:44: Roughing. Water loop installed. Lock out tag removed.
Entry  Tuesday, January 04, 2022, 13:00, Aaron Schmidt, , , , , , , , Post water leak 
 December 30th, 2021: Water poured down around Isac test stand and probes lab area in service
annex extension. problem was traced to a Cracked HVAC coil on SA roof
Fault: 14601 
Entry  Wednesday, January 05, 2022, 15:12, Carla Babcock, , , , , , , , Modifications to test stand for mass marker tests 
Connection of TBHT negative to HV common removed (R4 in circuit diagram). Labelled and put in MRO bucket.
Anode connection moved to feedthrough J.
Rewired multipin patch panel. Left some grounded (HVC) wires hanging, should probably make this nice later.
Entry  Wednesday, January 12, 2022, 16:12, Carla Babcock, , , , , , , , Ramp up of the mass marker target 133CssettingsJan132022.PNG23NasettingsJan132022.PNG23NasettingsJan172022-source.PNG23NasettingsJan172022-beamline.PNG
Wednesday, January 12, 2022, 16:08 : HV ramped to 30kV, EZL=15kV, EE=-1.5kV
Ramping up to 250A on TGHT, 200A on TBHT. See MassMarkerTest#1
for ramp up values of the thermocouples.