  872   Wednesday, April 28, 2021, 22:34 Luca EgoritiP2N test - Apr 2021P2N-SISITETM4  In progressP2N heating test Wednesday, April 28, 2021, 22:30
First P2N heating test ongoing.
At P2NHT ~ 570 A and TBHT ~ 100 A
 Target_580A_100A_glowing.jpgInitial_rampup.PNG 
  873   Wednesday, May 19, 2021, 16:02 Aaron Schmidt       P2N HS conditioning Parasitic assemblies on the lid & end
plate included. Online HS.
Wednesday, May 19, 2021, 16:00: Roughing.
 HV_test_-_Online_HS_&_parasitic_mods.docx 
  877   Monday, June 07, 2021, 14:40 Aaron Schmidt      DoneFC6 re-installedMonday, June 07, 2021, 14:39: Roughing
beam line section.
Monday, June 07, 2021, 14:46: TMS:TP6
  
  878   Wednesday, June 09, 2021, 11:51 Aaron Schmidt      Problems/SolutionsTPS:CB2 issue.Tuesday, June 08, 2021, 08:25: IV4 open.
Optics set minus TPS:CB2. Shows  as green
'on', set to 500V, however read back shows
  
  883   Monday, June 28, 2021, 09:22 Aaron Schmidt       Empty ChamberMonday, June 28, 2021, 09:22: Roughing.
Monday, June 28, 2021, 10:10: TP1B
on.
  
  884   Wednesday, June 30, 2021, 19:08 Fernando Maldonado LP-FEBIAD    FailedFEBIAD parameter scan - efficiency measurements Wednesday, June 30, 2021, 19:08: Roughing

Thursday, July 01, 2021,
08:57: Turbos on 
 anomalous-ionization-regime.pngFernando_screenshots.docx 
  889   Friday, July 30, 2021, 15:34 Carla Babcock      FailedTSG:RP1 failureTP1A tripped off on Fernando, seems the
backing pressure got too high. Even with
PV1 closed the RP1 pump could not get below
  
  891   Tuesday, August 03, 2021, 11:55 Fernando Maldonado      Problems/SolutionsSwapped emmittance meter voltage cables.After not being able to get beam through
the emittance meter. I diagnosed that the
plates was not biased (reason yet unknow).
  
  892   Thursday, August 05, 2021, 08:49 Fernando Maldonado      Problems/SolutionsCANBUS snooper set up to investigate random optics turnining offProblem: Some devices
turn off unexpectedly and sometimes without
any obvious trigger. In the past, the only
 Annotation_2021-08-06_144737.png20210806_150334.jpg 
  893   Saturday, August 07, 2021, 18:07 Fernando Maldonado      Problems/SolutionsFC0 lasrge oscillation and RMPs offset. Both started today. [Got solved by itself]Saturday, August 07, 2021, 18:02: As mentions
in previous entries, the FC0 current oscillates
with no change on ion source parameters.
  
  894   Monday, August 23, 2021, 09:55 Fernando Maldonado      Problems/SolutionsRP1 changed back Monday, August 23, 2021, 09:53: RP1
was swapped back to our original pump. (see e-log
  
  895   Monday, August 23, 2021, 10:49 Aaron Schmidt - Fernando Maldonado      Problems/SolutionsRGA replaced with a blind flangeMonday, August 23, 2021, 10:49: Aaron
removed the Extorr RGA and install a blind
instead.
  
  896   Wednesday, August 25, 2021, 15:30 Ferran Boix Pamies       Thermocouple high voltage testWednesday, August 25, 2021, 15:29: Roughing.

Thursday, August 26, 2021,
04:11: IG1 switched on. Vacuum @ 8.35e-06T
  
  897   Tuesday, August 31, 2021, 13:55 Aaron Schmidt       Pump down chamberPump down chamber w/ empty HS   
  898   Tuesday, September 07, 2021, 16:04 Alexander Shkuratoff      DoneReplaced flange on F/T R with blank flangeFeedthrough R had a flange installed with
a HV feedthrough on it for TM3 service tray
prototype HV tests. It was replaced today
  
  900   Thursday, September 23, 2021, 07:16 Aaron Schmidt       Pump down empty chamber & rebootThursday, September 23, 2021, 07:15: Roughing.
Waterline loop installed.

Monday, September 27, 2021,
  
  902   Wednesday, October 06, 2021, 11:56 Aaron Schmidt       Pump down empty chamberWednesday, October 06, 2021, 11:56: Roughing.

Thursday, October 14, 2021,
09:07: Venting.
  
  904   Wednesday, October 20, 2021, 15:01 Aaron Schmidt       Pump down empty chamberWednesday, October 20, 2021, 15:01: Roughing.   
  905   Thursday, November 04, 2021, 11:55 Fernando Maldonado      DoneOpening vacuum chamber for thesis pictures :pThursday, November 04, 2021, 11:54: Venting
water loop removed
Thursday, November 04, 2021, 13:39:
  
  907   Tuesday, November 16, 2021, 13:45 Aaron Schmidt       Pump down empty chamberTuesday, November 16, 2021, 13:44: Roughing.
Water loop installed. Lock out tag removed.
  