Entry  Monday, June 10, 2019, 14:34, Aaron Schmidt, , , , , , , Done, Removed TM4 Source Tray 

Monday, June 10, 2019, 09:30: TM4 Source Tray removed - To HC area.

Entry  Monday, June 10, 2019, 14:35, Aaron Schmidt, , , , , , , Done, Optics Tray / EZL inspection. 20190610_135100.jpg20190610_135926.jpg20190610_135045.jpg20190610_135517.jpg

Monday, June 10, 2019, 13:00: Optics Tray removed.

Megger'd @ 1000V on EZL and Collimator. Passed. Open it.

Monday, June 10, 2019, 14:34: 3 cracked insulators found. 1 quite broken on the threads (see attached pictures). Replaced insulators & re-assembled optics tray.

Megger'd @ 1000V on EZL and Collimator. Passed.


Thursday, June 13, 2019, 14:23: BIAS / EE / EZL @ 30 / -1.5 / 13 kV. EZL current @ 61 uA. EZL appears to be fixed. :)

Entry  Thursday, June 13, 2019, 14:05, Aaron Schmidt, , , , , , , Done, Spare TGHT PS installed. 

Thursday, June 13, 2019, 14:04: Spare TGHT PS installed /  tested. The old one is to be sent out for repair.

 

Entry  Wednesday, June 19, 2019, 17:25, Fernando Maldonado, , , , , , , Done, Thermocouple connection 

Wednesday, June 19, 2019, 17:13  Ferran and Fernando tested the 9-pin connector to have a reading on a thermocouple following the connections used by Aurelia (see elog 721).

Wednesday, June 19, 2019, 17:24: Test succesful!

 

 

Entry  Friday, June 21, 2019, 15:12, Aaron Schmidt, P2N - 1, , , , , , , P2N - 1 - 2019 

Friday, June 21, 2019, 14:48: Roughing.

Friday, June 21, 2019, 15:18: Turbo pumps on.

Friday, June 21, 2019, 15:31: IG1 on.

Friday, June 21, 2019, 15:42: Vacuum@9.31e-5 T

Friday, June 21, 2019, 15:51: RGA switched on.

Friday, June 21, 2019, 16:30: Luca wants to put heat shields on his target. Aborting pumping. 

Friday, June 21, 2019, 16:57: IG1 off 

Friday, June 21, 2019, 16:57:  Turbo pumps off.

 Friday, June 21, 2019, 16:57: RGA switched off


AS

Monday, June 24, 2019, 07:18: Restart TP1A (Timeout) Global Reset. Restart again.

Monday, June 24, 2019, 07:29: TP1A to speed. Monitor. Vacuum @ 4.31e-06T

Monday, June 24, 2019, 07:31: Restart RGA.

Monday, June 24, 2019, 08:57: Waterlines opened. No response on RGA. Vacuum @ 3.23e-06T.

Monday, June 24, 2019, 09:03: Power / sources on. (No HV)

Monday, June 24, 2019, 09:04: TGHT / TBHT / Coil PS ready.  Vacuum @ 3.23e-06T.

Monday, June 24, 2019, 10:09: Auto-ramping TGHT / TBHT to 150 / 75 A @ 2 A per min. 

Monday, June 24, 2019, 10:57: Auto-ramping was halted @ 35 A. Coil increased. TGHT, TBHT, Coil brought back to 0 A

Monday, June 24, 2019, 10:58:

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP 26.27 5.47
 TBHT 26.11

8.20

 COIL + EE 26.03 2.36
 TGHT  26.12 6.33

 Monday, June 24, 2019, 11:01: Auto-ramping TGHT / TBHT to 150 / 75 A @ 2 A per min. Manually ramp coil to 150 A @ approx the same rate.

Monday, June 24, 2019, 12:20: Halt at 140A TGHT / Coil. Vacuum limit?

Monday, June 24, 2019, 13:23: Increasing good vac limit. From 3e-6 to 4.5e-6 T

Monday, June 24, 2019, 13:29: Auto-ramping TGHT / TBHT to 300 / 120 A @ 2 A per min. Manually ramp coil from 140 to 150 A @ approx the same rate.

Monday, June 24, 2019, 13:37

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP 26.97 5.95
 TBHT 26.82

8.62

 COIL + EE 26.70 2.60
 TGHT 26.80 6.54

 Monday, June 24, 2019, 14:4: TGHT @ 270 A. Vacuum limits reached 3.05e-06T. Gradual out-gassing w/ cont'd auto ramp.


Tuesday, June 25, 2019, 07:53: Auto-ramping TGHT / TBHT to 550 / 120 A @ 2 A per min.

Tuesday, June 25, 2019, 08:34:

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP 25.30 5.75
 TBHT 25.08

8.40

 COIL + EE 24.96 2.47
 TGHT 25.08 6.55

Tuesday, June 25, 2019, 10:09: At approx 9:45am a vacuum spike tripped the test stand. All heaters at 0 A. Power supplies checked.

Tuesday, June 25, 2019, 10:11: TGHT / TBHT / Coil @ 6 A. Bumped up manually.

Tuesday, June 25, 2019, 10:12: Auto-ramping TGHT / TBHT to 300 / 100 A @ 2 A per min. Manually ramp coil to 150 A.

Tuesday, June 25, 2019, 11:01: One sheet on the target leg is shining red.

Tuesday, June 25, 2019, 11:01: Aborting the ramping.

Tuesday, June 25, 2019, 11:08 :

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP 27.50 6.29
 TBHT 27.28

8.88

 COIL + EE 27.20 2.74
 TGHT 27.30 6.73

Tuesday, June 25, 2019, 11:18: Continue auto ramping

Tuesday, June 25, 2019, 11:37: Auto-cooling @ 12 A per min. Coil tapped down manually.

Tuesday, June 25, 2019, 11:58: Sources off. RGA off. Power off.

Tuesday, June 25, 2019, 11:59: IG1 off. Turbos off.

Entry  Saturday, June 22, 2019, 17:05, Luca Egoriti, p2n, , , , , , Done, Test stand installation 

I opened the test stand because I forgot to install tantalum heat shields around the target. Everything was reinstalled as before (with heat shields). I could turn on the TSGTP1B but TSGTP1A does not turn on for some reason. I tried multiple times opening/closing its valve (BV1A) but the pump never starts.

Will keep pumping over the weekend with TP1B only.

Entry  Monday, June 24, 2019, 15:41, Fernando Maldonado, , , , , , , Problems/Solutions, TMS:Q3 polarity 

Monday, June 24, 2019, 15:25: Current quadrupole polarities:

  Top/Bottom North/South
TSP Q1 Positive Negative
TSP Q2 Negative Positive
TSP Q3 Positive Negative
TSP Q4 Negative Positive
TMS Q1 Positive Negative
TMS Q2 Negative Positive
TMS Q3 Negative Positive
TMS Q4 Positive Negative
TMS Q5 Negative Positive
TMS Q6

Positive

Negative

 

Monday, June 24, 2019, 15:35 : The polarity on TMS:Q3 is reversed. The top and bottom poles should be at a positive voltage similar to TMS:Q4, however a negative tagged cable is connected to it.

Monday, June 24, 2019, 15:39 : Swapping the cables on TMS:Q3.

 

  Top/Bottom North/South
TSP Q1 Positive Negative
TSP Q2 Negative Positive
TSP Q3 Positive Negative
TSP Q4 Negative Positive
TMS Q1 Positive Negative
TMS Q2 Negative Positive
TMS Q3 Positive Negative
TMS Q4 Positive Negative
TMS Q5 Negative Positive
TMS Q6

Positive

Negative

 

Entry  Tuesday, June 25, 2019, 17:19, Fernando Maldonado, , , , , , , Problems/Solutions, Burnt cables on top of the test stand 20190625_154015.jpg20190625_153834.jpg20190625_165001.jpg

Tuesday, June 25, 2019, 16:15: While inspecting the 9-pin connection with Ferran, it was noticed how two braided cables were burnt out pretty bad to the point they were separated in half (see attached pictures).  Additionally the plastic insulator for the anode wire was melted.

Tuesday, June 25, 2019, 16:30: Braided cables need to be changed and anode wire redone. 

Tuesday, June 25, 2019, 17:16: Wondering if this happened during TM4 source tray conditioning given the following entries in the elog (entry 725):

Monday, June 03, 2019, 09:51: BIAS down to 50 kV. Burnt plastic smell lingering. Wait* 

Tuesday, June 04, 2019, 10:29: Note* Minute fluctuations of Anode current have ended after the spark. Also slight 'Burnt' smell noticed around the test stand area.

 

Entry  Wednesday, June 26, 2019, 14:41, Carla Babcock, none, , , , , , Problems/Solutions, Issues with test stand wiring in service cap area isk4523d_ITSrewiring_June2019.png

The wiring on the top of the test stand was burned, see entry 737.

Probable cause of this is as follows:

Coil lines are connected by a wire to HV common, the 9-pin feedthrough etc to maintain same voltage on all the insulator tops. This is also directly connected to the extraction electrode spark gap. When this sparks, it momentarily changes the potential in that line (normally HV common) which then can make this path the best route for current from the coil to return to ground.

See attached diagram.

 

Best solution to this problem is to disconnect the high current section from the low current section, and attach each separately to HV common.

Other possible improvements to wiring:

1. Remove jumpers between positive coil lines (and neg. coil lines) since these feethroughs are physically connected by the copper pipe.

2. Add a resistor to the jumper between coil - and TBHT - since this will eliminate all possibility of current flowing between the two.

3. Add a resistor in line where the high current section is connected to HV common to avoid possibility of current going through jumpers.

Entry  Thursday, June 27, 2019, 09:51, Fernando Maldonado, , , , , , , Problems/Solutions, Melted cables changed 

See elog 737 

Fernando Maldonado wrote:

Tuesday, June 25, 2019, 16:15: While inspecting the 9-pin connection with Ferran, it was noticed how two braided cables were burnt out pretty bad to the point they were separated in half (see attached pictures).  Additionally the plastic insulator for the anode wire was melted.

Tuesday, June 25, 2019, 16:30: Braided cables need to be changed and anode wire redone. 

Tuesday, June 25, 2019, 17:16: Wondering if this happened during TM4 source tray conditioning given the following entries in the elog (entry 725):

Monday, June 03, 2019, 09:51: BIAS down to 50 kV. Burnt plastic smell lingering. Wait* 

Tuesday, June 04, 2019, 10:29: Note* Minute fluctuations of Anode current have ended after the spark. Also slight 'Burnt' smell noticed around the test stand area.

 

 

Thursday, June 27, 2019, 09:45: The cables showing burnt marks were changed with new ones on Wednesday 26th. The grounding cables were insulated with yellow heatshrink. The anode wire connection was redone.

Entry  Tuesday, July 02, 2019, 18:25, Fernando Maldonado, , , , , , , Done, Blank on FEBIAD gas line installed 20190702_182254.jpg

 Tuesday, July 02, 2019, 18:24: A blind is installed  on the FEBIAD gas line (see attached picture)  to rule out the possibility of  gases entering the TIS.

Entry  Thursday, July 04, 2019, 15:15, Aaron Schmidt, P2N - 1, , , , , , , P2N - 1 - 2 - 2019 

Screws instead of rivets on target leg. Insulator changed.

Thursday, July 04, 2019, 15:14: Roughing

Thursday, July 04, 2019, 16:00: Turbos on.

Thursday, July 04, 2019, 16:12: IG1 on. RGA on


Friday, July 05, 2019, 08:12: Waterlines opened. No response on RGA. Vacuum ok @ 4.57e-06T.

Friday, July 05, 2019, 08:14: Power / sources on.

LE,FM

Friday, July 05, 2019, 10:00: Autoramping TGHT/TBHT to 250/100 A @ 3 A/min. Vacuum limits change to 5e-6 T and 5.5e-6 T. Vacuum ok @ 4.2e-6 T.

Friday, July 05, 2019, 11:42 :

 

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP 28.06 6.46
 TBHT 27.91 9.01
 COIL + EE 27.82 2.80
 TGHT 27.93 6.82

Friday, July 05, 2019, 11:45 : Auto ramping TGHT/TBHT to 300/150A @ 3 A/min.

Friday, July 05, 2019, 17:32:

Friday, July 05, 2019, 13:56: Source/Optics on

Friday, July 05, 2019, 14:38: BIAS / EE / EZL @ 30 / -1.5 / 13 kV. One spark while bring the BIAS to 30 kv around 27.5 kV. IV4 opened.

Friday, July 05, 2019, 17:32: BIAS / EE / EZL @ 0 for the weekend. Heater will be left on.


FM

Monday, July 08, 2019, 15:12:  BIAS / EE / EZL @ 30 / -1.5 / 13 kV.

Monday, July 08, 2019, 18:59: BIAS / EE / EZL @ 0.00 kV


Tuesday, July 09, 2019, 13:42: TBHT/TGHT @ 590/230A.

Tuesday, July 09, 2019, 13:49 BIAS / EE / EZL @ 30 / -1.5 / 13 kV.

Tuesday, July 09, 2019, 14:04: Dipole magnet not responding. Cycling the PS on EPICS didn't work. Cycling the PS directly worked.

Tuesday, July 09, 2019, 17:28: BIAS / EE / EZL @ 0.00 kV

 

Entry  Thursday, July 04, 2019, 15:16, Aaron Schmidt, , , , , , , Problems/Solutions, TBHT insulator changed 

Thursday, July 04, 2019, 15:00: TBHT insulator was swapped out on the source tray side. 

The old one is very chipped.

Entry  Monday, July 08, 2019, 09:20, Luca Egoriti, p2n1, , ITE, , , , In progress, p2n heating test Capture.PNGCapture1.PNG

(see entry 742)

 

p2n target heated over the weekend after the connections between the bottom target legs and the copper connector has been modified from rivets to M3 screws. Target hold current nicely with no major voltage spikes.

The plan now is to cycle the current heating few times to "stress test" the target.

Entry  Monday, July 15, 2019, 15:59, Fernando Maldonado, P2N, , , , , , Done, Re-wiring on service cap. 

Monday, July 15, 2019, 15:54 : TBHT high current cables moved to Coil feedthroughs.

Coil high current cables moved to TBHT feedthroughs.

Resistor across  Coil feedthroughs E and F are now moved between TBHT feedthroughs A and B.

Tuesday, July 16, 2019, 09:00

A braided cable between F and H was changed due to the burnt aspect it had. Most likely this cable was burnt along the previous ones (see entry 740) but since it was uniformed blacked and not broken I didn't noticed it.

Resistor/Varistor between TGHT and TBHT removed.

 

Entry  Tuesday, July 16, 2019, 10:28, Fernando Maldonado, P2N, , , , , , , P2N 1200 A test 

Tuesday, July 16, 2019, 10:27: The idea of this run is to have the full 600 A from TGHT and the full 600 A from TBHT.

This will done based on the rewiring done previously (see entry 745)

Tuesday, July 16, 2019, 12:16: Jumper cable F-H burning while target was at 600 A total. Ramp up aborted and auto-cooling started to remove the jumper.

Jumper removed.

TBHT cables on both positive coil FT.

Jumper E-G removed.

High current cable connecting F-H.

Tuesday, July 16, 2019, 16:49

Current ramped up to 300A + 300A on TGHT and TBHT in parallel, for an equivalent of 600A on the target. No burn to anything noticed, PS ramping nicely together. Stopped ramping up and started ramp down for the night.

Entry  Friday, July 19, 2019, 13:48, Fernando Maldonado, , , , , , , Problems/Solutions, RMP0A and FC6 gains signal redirection to another channel 

After submitting a fault report (FR - ISAC Fault 12461) a Work Permit was issued (WP - C2019-07-19-1),

Controls tunnel the faulty signal to another ADC by removing signal no longer used at the Test Stand.

Test successful with a constant current power supply in the range 1 nA-40 nA.

TBD: does this work with beam?

Entry  Tuesday, July 30, 2019, 12:19, Luca Egoriti, P2N - 1, HP-FEBIAD, ITE, TM2, , , Problems/Solutions, p2n heating test - target inspection IMG_20190730_110927.jpgIMG_20190730_113437.jpgIMG_20190730_105629.jpg

The p2n target was taken out of the test stand for inspection. Comments and measurements on the container below:

- Initially, continuity measurements were mode between the target and heat shield (HS) while they were still in the test stand, and looks like they were shorted. However, after removing the HS from the test stand, no short was seen, not even after moving the target legs. Instead, we confirmed that the short was happening in the test stand, so some water lines were touching each other. 

- The target look in one piece, except for the ion source that came off right after manufacturing. (see picture)

- The insulator connecting the bottom section of the ion source central current lead, to the HS, was broken (see picture)

- The annular disc of the connecting the inner and outer tube of the ion source was bulging outwards, maybe the ion source was heating too much while we put current in it (see picture).

- The screw connecting the top part of the central ion source current lead, is now of a blue-ish color

 

 

Resistance measurementts:

- Copper to copper: 1008 microOhm

- Copper to bottom flexy leg: 101 microOhm

-  Bottom-to-top (flexy): 30-45 microOhm

- Target: 476 microOhm

- Copper to top flexy: 261 microOhm

- Copper to bottom flexy (left): 100 microOhm

- Copper to bottom flexy (right): 94 microOhm

- Top Flexy - botton target assy (left): 88 microOhm

 

 

From left to right:

- Cu to bottom flexy leg: 102

- Flexy bottom to flexy top: 31

- Flexy top left to flexy top right: 473

- Flexy top to flexy bottom: 0 (???)

- flexy bottom to Cu: 93

Entry  Friday, August 02, 2019, 13:16, Aaron Schmidt, P2N - 1, , , , , , In progress, p2n heating test 4 

Friday, August 02, 2019: p2n target installed in the test stand, the ion source was fully removed to avoid any risk of shorting. The Central ion source current lead is attached to the target body so it was left there and attached to its electrodes.

Friday, August 02, 2019, 13:15: Roughing.

Friday, August 02, 2019, 13:58: BV1A closed to allow pressure stabilization. Opened about 10-15 seconds later with BV1B.

Friday, August 02, 2019, 14:00: Turbos pumps on.

Friday, August 02, 2019, 14:09: Ion gauge on.

Friday, August 02, 2019, 15:15: RGA cycled. Now the filament can start. RGA on.


Tuesday, August 06, 2019, 07:49: RGA Error. Halted.

Tuesday, August 06, 2019, 07:53: Restarted RGA.

Tuesday, August 06, 2019, 09:32: Waterlines opened on FS#5. No response on RGA. Vacuum ok @ 1.16e-06T.

Power on.

Entry  Wednesday, August 07, 2019, 08:18, Luca Egoriti, P2N - 1, , ITE, TM2, , , Problems/Solutions, p2n heating test 4 IMG_20190806_182939.jpgIMG_20190806_182953.jpg

Tuesday, August 06, 2019, 16:00

Start ramp up to 300+300 = 600 A

 

Tuesday, August 06, 2019, 17:30

Target glowing, see images. Ramp down started
 
 

Wednesday, August 07, 2019, 08:11

The same p2n target was installed in the test stand, taking off the ion source since we thought it could have been shorting to the reference electrode and providing a return path for the current, hence generating the asymmetric heating that was noticed on the target.

On Tuesday 6th afternoon, the p2n was ramped up to 600 A (300 + 300 A from TGHT and TBHT in parallel). The target and its right flexible leg were still glowing. After noticing it, the current was ramped down wating to open up for inspection.