ID |
Date |
Author |
Target/No.# |
Source |
Station |
Module |
Target Oven W.O# |
Heat Shield W.O# |
Status |
Subject |
656
|
Thursday, April 19, 2018, 12:55 |
Fernando Maldonado | | | | | | | Done | Re-wiring Anode PS | Thursday, April 19, 2018, 12:52: Pin J1 was reconnected into the anode power supply. All jumpers were put back to remote control.
NOTE: the cable EXTLKT is still not connected. I will ask Carla about this one.
Thursday, April 19, 2018, 18:00: Cable EXTLKT connected.
Thursday, April 19, 2018, 18:12 When turning the transformer on, the Anode PS was not turned on. Neither the TGHT.
Thursday, April 19, 2018, 18:30: I turned off everything. Will check tomorrow with someone.
Friday, April 20, 2018, 11:01 : Issue fixed. I've attached a picture of the jumpers connection for future references
|
657
|
Friday, April 20, 2018, 13:20 |
Carla Babcock | | | | | | | Done | BIAS* fan sounds like it is dying | The fan in the EZL power supply is making a terrible noise - keep an eye on it, it sounds like it might give up soon.
Monday, April 23, 2018, 10:47: The back panel was opened. Original entry stated EZL power supply issue. Corrected to BIAS PS. High voltage group notified. Fan replacement required.
Monday, May 14, 2018, 13:20: BIAS fans, external an internal were replaced. Re-installed @ TS.
Monday, May 14, 2018, 13:26: BIAS ramped up to 10 kV. Response ok on epics and locally on the PS. No odd noise on the fans either. The issue appears to be fixed. |
658
|
Wednesday, April 25, 2018, 09:50 |
Aaron Schmidt | Ta (test) | LP-SIS | | | 41177-3 | | In progress | Ta test and window change | Window changed on view port. Ta target prepared for Aurelia's tests.
***Note*** No Ta window foils on the end plates. Initial ramping to on the TGHT to 300 A. Follow up in increments of 50 A and check the right door window temperature.
Wednesday, April 25, 2018, 09:47: Roughing both the Evap/box end and beam end.
Wednesday, April 25, 2018, 10:27: All 4 turbo pumps started.
Wednesday, April 25, 2018, 10:49: Both Ion gauges on.
Wednesday, April 25, 2018, 14:56: RGA on.
Thursday, April 26, 2018, 06:54: Water lines opened. No response on RGA. Vacuum stable @ 4.23e-07T
Thursday, April 26, 2018, 06:56: Power/sources on.
Thursday, April 26, 2018, 07:00: Auto ramping TGHT to 300 @ 2A per min.
Thursday, April 26, 2018, 07:05: IV4 opened.
Thursday, April 26, 2018, 08:50: Door temp @ 25 C @ left window.
Thursday, April 26, 2018, 09:30: 300A reached. Door temp @ 26 C @ left window.
Thursday, April 26, 2018, 13:01: 550A Reached. Door temp @ 29 C @ left window.
Monday, April 30, 2018, 07:05: IV4 closed, RGA off.
Monday, April 30, 2018, 07:10: Ion gauge off. Turbo pumps off.
Monday, April 30, 2018, 11:00: Venting. Purging water lines. |
661
|
Tuesday, May 22, 2018, 08:48 |
Anders Mjos | | | | | | | Problems/Solutions | TSG:TP1A not running | Pump found off on Tuesday morning.
Tuesday, May 22, 2018, 08:40: Starting TP1A
Tuesday, May 22, 2018, 08:47: TP1A at speed
Tuesday, May 22, 2018, 16:33: Source and optics off
Wednesday, May 23, 2018, 08:30: Stopped TP
Wednesday, May 23, 2018, 14:10: Water purged |
662
|
Thursday, May 24, 2018, 08:38 |
Anders Mjos | | | | | | | Problems/Solutions | Venting beamline for IG6 replacement | Thursday, May 24, 2018, 08:38: TPs stopped
Thursday, May 24, 2018, 09:18: Venting
Thursday, May 24, 2018, 14:30: IG6 replaced (second attempt) by Anthony. System pumping down |
663
|
Thursday, May 24, 2018, 15:28 |
Anders Mjos | | | | | | | Problems/Solutions | Reconfigured FEBIAD coil for testing new source tray | Thursday, May 24, 2018: Configured coil to be (-) E&F, (+) G&H. Water should be supplied to both terminals in either configuration. |
665
|
Monday, June 04, 2018, 16:02 |
Anders Mjos | | | | | | | Problems/Solutions | MB1 timeout | Mass separator magnet timed out. Tried reconfigure. Called Kyle from controls who power cycled the CANbus card. This resolved the issue
(From the Source tray swap out.) - AS
Tuesday, June 05, 2018, 11:25: BIAS / EZL / EE @ 52 / 24 / 2.8 kV. SPARK *knocked out optics, magnet & Turbo TMS:TP6. IV4 closed/opened/reset. TP6/optics restarted. Magnet still off.
Complete failure of the communications with the magnet.
Wednesday, June 06, 2018, 13:40: Canbus contoller was swapped by Kyle L from Controls group. The old card was dead and replaced with a new one. The magnet is back and running. |
666
|
Wednesday, June 06, 2018, 14:01 |
Aaron Schmidt | | | | | | | Problems/Solutions | Emittance scanner (E-rig) communication issues. | Wednesday, June 06, 2018, 13:50:
It was noted yesterday during the TM2 Source HV tests that the E-rig was not running accordingly through the beam.
Upon turning on the PS, there a 45 second or so delay before the needle drops to the right at +500V and the PS no longer responds. (similar issue in August 2016)
Wednesday, June 06, 2018, 14:20: Soft reboot on Emittance rig communication. (Reboot IOC - Kyle LeBlanc)
Wednesday, June 06, 2018, 14:30: Calibrate
test scan & park
Reference parameters. Dac in bottom right corner to control PS.
Enter: 100 on Dac -- Reads 100 - On PS
Enter: 200 on Dac -- Reads 200 - On PS
Enter: 0 on Dac -- Reads 0 - On PS
Enter: -200 on Dac -- Reads -200 - On PS
The reboot fixed the erig/scanner. |
667
|
Thursday, June 07, 2018, 09:21 |
Aaron Schmidt | | | | | | | Problems/Solutions | Pump down empty chamber. Anode check | TM2 Source tray still in.
Thursday, June 07, 2018, 09:20: Roughing.
Thursday, June 07, 2018, 12:42: Turbo pumps started.
Friday, June 08, 2018, 08:00: Anode run to 15 A. Short still apparent.
Friday, June 08, 2018, 08:12: Ion gauge, Turbos off.
Friday, June 08, 2018, 08:55: Venting.
Friday, June 08, 2018, 09:45: Anode connection investigated. Short found on the bracket once the anode wire was disconnected from the back screw (Picture)
Friday, June 08, 2018, 10:00: Removed 9-pin bracket. (Top connector left connected to TS. (Picture)
New Anode 9-pin connection/wire to be installed on the bracket. Test in the cold lab.
Friday, June 08, 2018, 10:12: Roughing.
Friday, June 08, 2018, 11:14: Turbo pumps started.
Friday, June 08, 2018, 12:31: Ion gauge on.
Tuesday, June 12, 2018, 06:18: Ion gauge & Turbo pumps off.
Tuesday, June 12, 2018, 07:40: Venting. |
668
|
Tuesday, June 12, 2018, 11:38 |
Aaron Schmidt | | | | | | | In progress | Source Tray re-installation | Re-installation of the ISAC Test Stand Source tray. The TM2 ST was removed.
Tuesday, June 12, 2018, 10:15: Disconnect Optics Tray. Set blocks.
-Continue with removal of TM2 Tray
Tuesday, June 12, 2018, 10:56: TM2 Tray Removed.
-Continue with installation of ISAC Test Stand Source Tray. Optics reconnect.
Tuesday, June 12, 2018, 11:25: Open line FS#8. No visible leaks found.
Tuesday, June 12, 2018, 11:37: Connect Source tray, optics tray, gas line, etc. Complete.
Tuesday, June 12, 2018, 14:37: Roughing.
Wednesday, June 13, 2018, 06:32: Turbo pumps on.
Wednesday, June 13, 2018, 06:37; Ion Gauge on.
He Leak TEST #1:
Cold Lab Leak detector. RGA unavailable.
Monday, June 18, 2018, 11:00 Vacuum @ 2.15e-06T
LD Base line before opening valve to turbo pumps: 0.0 to 5.6 e-11 atm-cc/sec
LD baseline after opening valve to turbo pumps: 8.e-10 atm-cc/sec
Full open base after five minutes:
Vacuum @ 2.18e-06T.
LD: 8.2e-09 atm-cc/sec
Monday, June 18, 2018, 11:05: Open line FS#2 . Pressurize to 30 PSI. Record after 5 minutes
Vacuum @ 2.15e-06T .
LD: 6.6e-09 atm-cc/sec. Purge and close FS#2.
Monday, June 18, 2018, 11:10: Open line FS#3 . Pressurize to 30 PSI.
Drop followed by Major SPIKE into e-04 vacuum.
Vacuum @ 1.5e-05T.
LD: 1.6e-04 atm-cc/sec. Confirmed leak on FS#3
Monday, June 18, 2018, 11:26: Continued Vacuum instability.
Halt leak test!
Monday, June 18, 2018, 11:30: Close port to LD.
Monday, June 18, 2018, 11:34: Vent and shut down LD. Ion gauge and turbos off.
Tuesday, June 19, 2018, 06:40: Venting.
C-seals replaced with O-rings on line FS#3 (E)(G)
Tuesday, June 19, 2018, 08:36: Re-install RGA
Continue C-Seal replacement. (F)(H)(K).
Tuesday, June 19, 2018, 09:00: Roughing.
Tuesday, June 19, 2018, 10:15: Turbo pumps on.
Tuesday, June 19, 2018, 10:19: Ion gauge on.
Tuesday, June 19, 2018, 10:28: RGA operational.
Thursday, June 21, 2018, 14:28 Vacuum @ 4.95e-07T
LD Base line before opening valve to turbo pumps: 0.0 e-11 atm-cc/sec
LD baseline after opening valve to turbo pumps: 3.3e-10 atm-cc/sec
Full open base after five minutes:
Vacuum @ 4.95e-07T. RGA ok
LD: 3.3e-08 atm-cc/sec
Thursday, June 21, 2018, 14:33 : Open line FS#4 . Pressurize to 30 PSI. Record after 5 minutes
Vacuum @ 4.76e-07T . RGA ok
LD: 3.3e-08 atm-cc/sec. Purge and close FS#4.
Thursday, June 21, 2018, 14:38: Open line FS#5 . Pressurize to 30 PSI.
Vacuum @ 4.76e-07T. RGA ok
LD: 3.6e-08 atm-cc/sec.
Thursday, June 21, 2018, 14:43: Open line FS#3 . Pressurize to 30 PSI. Record after 5 minutes
Vacuum @ 4.95e-07T . RGA ok
LD: 3.7e-08 atm-cc/sec.
Purge and close FS#3.
Thursday, June 21, 2018, 14:48: Open line all lines . Pressurize to 30 PSI. Record after 5 minutes
Vacuum @ 4.95e-07T . RGA ok
LD: 4.0e-08 atm-cc/sec.
Thursday, June 21, 2018, 14:53: Close port to LD.
Vent and shut down LD.
Purge He, Open with water.
Thursday, June 21, 2018, 14:58: Vacuum @ 5.04e-07T . RGA ok.
Thursday, June 21, 2018, 15:00: Power/sources on. Vacuum @ 5.04e-07T . RGA ok.
See Target Heating - TS Elog 670.*
Monday, June 25, 2018, 09:10: Auto-cooling at 2A/min - AS. |
669
|
Tuesday, June 19, 2018, 10:30 |
Aaron Schmidt | | | | | | | Done | RGA repair | Monday, June 18, 2018, 10:00: RGA removed from ISAC TS. Handed to Travis C. Communications issues found
Communications chip replaced.
Tuesday, June 19, 2018, 08:36: Re-install RGA.
Tuesday, June 19, 2018, 10:29: RGA confirmed operational |
675
|
Monday, July 23, 2018, 14:25 |
Aaron Schmidt | UC#23 | LP-FEBIAD-CTL | ITE | TM2 | | | In progress | Conditioning Heat Shield for UC#23 | Monday, July 23, 2018, 14:20: Roughing.
Monday, July 23, 2018, 14:54: Turbo pumps on.
Tuesday, July 24, 2018, 06:40: Ion gauge on. Vacuum slowly decreasing
Tuesday, July 24, 2018, 07:20: RGA on.
Tuesday, July 24, 2018, 07:27: Waterlines opened. No response on RGA. Vacuum stable @ 2.24e-06T
Tuesday, July 24, 2018, 07:29: Power/sources on.
Tuesday, July 24, 2018, 07:34: Opening gas lines slowly.
Tuesday, July 24, 2018, 07:36: SV2 & SV5 Open.
Tuesday, July 24, 2018, 07:43: SV3 Open.
Tuesday, July 24, 2018, 07:47: SV4 Open.
Tuesday, July 24, 2018, 09:00: Turn off sources/power and check 9-pin in the back of the TS. OK
Tuesday, July 24, 2018, 09:20: Restart sources/power. Gases open.
Tuesday, July 24, 2018, 13:39: Auto-ramping TGHT / TBHT to 500 / 275 A @ 2A per min.
Tuesday, July 24, 2018, 13:45: BIAS / EZL / EE @ 30 / 13 / -1.5 kV.
Tuesday, July 24, 2018, 13:46: IV4 opened.
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
26.4 |
3.92 |
TBHT |
26.9 |
3.08 |
COIL + EE |
26.1 |
5.00 |
TGHT |
26.5 |
5.64 |
Tuesday, July 24, 2018, 13:48: Optics set.
Note* Approx 10 sparks noted during auto-ramping. All occurred between 12:30am - 4:00am today.
Wednesday, July 25, 2018, 06:35: Auto-ramping is ongoing since it was started yesterday. Auto-ramping TGHT / TBHT to 500 / 275 A @ Vacuum limited rate
TGHT / TBHT @ 310 / 275. Significant out gassing noted adjusting the ramping rate.
Wednesday, July 25, 2018, 06:40: Auto-ramp halted. Auto-ramping TGHT / TBHT to 580 / 285 (290 w/ direct readout) A @ Vacuum limited rate. Restart auto-ramp.
Wednesday, July 25, 2018, 11:25: Increased good ramping limit to 2E-6 Torr - AM
Wednesday, July 25, 2018, 11:28: ANODE voltage to 200 V, 11 mA current read back
Thursday, July 26, 2018, 08:08: RGA Restarted
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
35.6 |
3.86 |
TBHT |
26.8 |
3.06 |
COIL + EE |
26.5 |
5.03 |
TGHT |
28.6 |
5.65 |
Thursday, July 26, 2018, 08:13: EZL to 13.4 kV
Thursday, July 26, 2018, 08:19: Coil @ 20 A.
Thursday, July 26, 2018, 08:29: Coil @ 30 A. TBHT @ 300A.
Thursday, July 26, 2018, 08:35: Coil @ 40 A.
Thursday, July 26, 2018, 08:41: Coil @ 50 A.
Thursday, July 26, 2018, 14:33: auto-cooling @ 2 A per min
Thursday, July 26, 2018, 14:45: Coil @ 0 A.
Friday, July 27, 2018, 08:29: Gas lines closed
Friday, July 27, 2018, 08:32: Sources off.
Friday, July 27, 2018, 08:34: RGA off. IV4 closed
Friday, July 27, 2018, 08:36: Ion gauge & turbos off.
Friday, July 27, 2018, 08:39: Power off. Waterlines purged. |
677
|
Friday, August 10, 2018, 10:56 |
Aaron Schmidt | | | | | | | Problems/Solutions | New PS installation and Cathode BIAS set | Friday, August 10, 2018, 10:25: Remove TBHT 500 PS and replace with TBHT 600 PS.
Friday, August 10, 2018, 10:50: Switch wiring in the high voltage cage from and Anode BIAS to Cathode BIAS setting.
Friday, August 10, 2018, 11:32: TBHT limit increased from 500A to 600A by Controls group.
Friday, August 10, 2018, 11:34: TBHT tested manually. Operation is satisfactory. |
679
|
Tuesday, August 21, 2018, 12:54 |
Anders Mjos | | | | | | | Problems/Solutions | 9-pin connection configuration | Pin configuration between top 9-pin connector on Source Tray and terminal in high voltage rack. Measured 2018-08-21 by Aaron and Anders
Grounded |
|
|
X |
|
|
|
|
|
|
Source Tray Side (looking head on) |
1 |
2 |
3 |
4 |
5 |
6 |
7 |
8 |
9 |
High Voltage Cage Side |
5 |
4 |
3 |
2 |
1 |
9 |
8 |
7 |
6 |
|
680
|
Wednesday, August 22, 2018, 15:20 |
Aaron Schmidt | | LP-SIS | | | 41177-3 | | | Voltage Tests (Ta Target) | Wires reconfigured / set
Wednesday, August 22, 2018, 13:10: Roughing.
Wednesday, August 22, 2018, 15:18: Turbo Pumps on.
Thursday, August 23, 2018, 08:16: RGA On.
Thursday, August 23, 2018, 08:39: Power on. Waterlines opened. No response on RGA, Vacuum ok @7.25e-06T
Monday, August 27, 2018, 09:50: Venting.
Monday, August 27, 2018, 10:59: Ta foil removed from one end plate. Roughing.
Monday, August 27, 2018, 11:29: Turbo pumps started.
Monday, August 27, 2018, 11:36: Ion gauge on. Both Turbo pumps at speed.
Tuesday, August 28, 2018, 08:27: Power on
Tuesday, August 28, 2018, 08:30: Waterlines opened. Vacuum ok @ 9.31e-07T. No response on RGA.
Wednesday, August 29, 2018, 11:34: Epics crashed. See added elog.
Friday, August 31, 2018, 10:07: Voltage tests are complete. Results to be uploaded later.
RGA crashed. Unable to re-connect. Manually turned it off.
Friday, August 31, 2018, 10:14: Ion gauge & turbo pumps off.
Friday, August 31, 2018, 11:27: Venting.
|
681
|
Wednesday, August 29, 2018, 11:36 |
Aaron Schmidt | | | | | | | | Epics / putty crash. | Wednesday, August 29, 2018, 11:35: EPIC's crashed.... epically.
Unable to restart Putty or TS controls.
|
682
|
Friday, August 31, 2018, 10:16 |
Aaron Schmidt | | | | | | | Problems/Solutions | RGA connection loss. | Friday, August 31, 2018, 10:10: The RGA will not re-connect to the computer. Manually turned it off while under vacuum to protect the filament before shutting down the turbo pumps.
Friday, August 31, 2018, 10:15: Ion gauge & turbo pumps off.
Wednesday, September 05, 2018, 10:00: Communications chip replaced by RH (Travis C.)
Wednesday, September 05, 2018, 10:40: Computer restarted to reconnect/reboot.
Wednesday, September 05, 2018, 11:05: RGA started |
689
|
Monday, October 15, 2018, 14:38 |
Aaron Schmidt | | | | | | | Problems/Solutions | Anode / Cathode PS to Negative | Monday, October 15, 2018, 13:00-14:00 Anode / Cathode BIAS PS polarity reversed by John Chow.
PS: Negative |
690
|
Monday, October 22, 2018, 07:18 |
Aaron Schmidt | | | | | | | | TS restart after power outage | Friday, October 19, 2018, 10:00 (Approx): Site wide power outage. TS completely shut down.
Power brought back Saturday
Monday, October 22, 2018, 07:15: Full white out on screens. To restart PLC.
Monday, October 22, 2018, 07:42: Multiple attempts made to restart the PLC. Controls white out continues
Also attempted restart of the Vacuum. All 4 turbo pumps switch back to red on any restart attempt.
The turbo pumps had been manually switched off from the controllers to protect them once the power was switched back on.
Monday, October 22, 2018, 09:28: Turbo pumps restarted.
Monday, October 22, 2018, 11:01: All back except the magnet.
|
694
|
Tuesday, November 06, 2018, 08:52 |
Aaron Schmidt | | | | | | | In progress | Pump down empty chamber | Tuesday, November 06, 2018, 08:50: Roughing
Tuesday, November 06, 2018, 08:51: Doors sealed.
Tuesday, November 06, 2018, 09:51: Turbo pumps on.
Thursday, November 08, 2018, 06:45: Ion gauge & Turbo pumps off.
Thursday, November 08, 2018, 08:36: Venting. |
|