ID |
Date |
Author |
Target/No.# |
Source |
Station |
Module |
Target Oven W.O# |
Heat Shield W.O# |
Status |
Subject |
Text |
 |
848
|
Wednesday, February 10, 2021, 09:49 |
Aaron Schmidt | | LP-SIS | | | 44691-8 | 44378-2 / 44378-3 | Failed | Energy spread calibration with SIS | Note* target has a ring on the TGHT - Right
leg. EE & PE placed. Target to HS OL
- OK. |
 |
843
|
Monday, February 01, 2021, 08:38 |
Fernando Maldonado | | LP-SIS | | | 44139-10 | 44378-2 | Failed | Energy spread calibration | Monday, February 01, 2021, 08:38 : The
anode seems to be shorted but we can still
test the amount of dispersion at the |
   |
104
|
Monday, June 04, 2012, 11:40 |
Anders Mjos | | | | | | | In progress | Empty chamber | HS water lines blanked.
Monday, June 04, 2012, 11:40: Roughing.
Monday, June 04, 2012, 11:58: Starting |
|
385
|
Monday, June 16, 2014, 09:12 |
Anders Mjos | | | | | | | In progress | Empty chamber | Monday, June 16, 2014, 09:12: Roughing
Tuesday, June 17, 2014, 14:38:
Venting |
|
391
|
Tuesday, July 08, 2014, 09:05 |
Anders Mjos | | | | | | | In progress | Empty chamber | Tuesday, July 08, 2014, 09:05: Roughing
Tuesday, July 08, 2014, 13:23: Starting
turbos |
|
395
|
Wednesday, July 23, 2014, 14:34 |
Anders Mjos | | | | | | | In progress | Empty chamber | Wednesday, July 23, 2014, 14:34: Roughing
Wednesday, July 23, 2014, 15:03: Starting
turbos. |
|
432
|
Tuesday, March 24, 2015, 09:50 |
Anders Mjos | | | | | | | In progress | Empty chamber | Roughed down on Friday 20th
Tuesday, March 24, 2015, 09:49: Turbos
started |
|
922
|
Monday, May 02, 2022, 14:10 |
Aaron Schmidt | | P2N-SIS | | | | | | Empty Chamber PS test. | No P2N is loaded. Testing the power supplies.
Tuesday, May 03, 2022, 10:07
In the past few days, the ITS has |
|
883
|
Monday, June 28, 2021, 09:22 |
Aaron Schmidt | | | | | | | | Empty Chamber | Monday, June 28, 2021, 09:22: Roughing.
Monday, June 28, 2021, 10:10: TP1B
on. |
|
320
|
Tuesday, July 16, 2013, 15:39 |
Anders Mjos | | | | | | | | Empty | Tuesday, July 16, 2013, 15:39: Roughing
Tuesday, July 16, 2013, 16:01: Starting
turbos. |
|
545
|
Tuesday, October 11, 2016, 14:55 |
Anders Mjos | | | | | | | In progress | Empty | Breaker tripped during roughing. Removed
exhaust line during first 2 min.
Tuesday, October 11, 2016, 14:55: |
|
531
|
Friday, August 12, 2016, 14:40 |
Aaron Schmidt | | | | | | | Problems/Solutions | Emittance scanner communications | Wednesday, July 27, 2016, 16:06: Spark
around 15:10 or 16:05
Emittance rig communications affected. |
|
517
|
Friday, June 24, 2016, 08:07 |
Aaron Schmidt | | | | | | | | Emittance scanner check/repair. | Friday, June 24, 2016, 08:06: Ion gauge
IG6 OFF. Turbo pumps TP6 and TP2 off.
Friday, June 24, 2016, 09:58: Venting. |
|
520
|
Wednesday, July 06, 2016, 10:42 |
Anders Mjos | | | | | | | Problems/Solutions | Emittance scanner check/repair. | Dave Morris increased the current from
~ 1 A to ~2.5 A. This seem to solve the problem
with the in/out drive of the emittance meter |
|
666
|
Wednesday, June 06, 2018, 14:01 |
Aaron Schmidt | | | | | | | Problems/Solutions | Emittance scanner (E-rig) communication issues. | Wednesday, June 06, 2018, 13:50:
It was noted yesterday during the
TM2 Source HV tests that the E-rig was not |
|
788
|
Wednesday, March 04, 2020, 17:15 |
Fernando Maldonado | | | | | | | Problems/Solutions | Emittance rig communication | Wednesday, March 04, 2020, 17:13: EPICS
page indicated a sucesful scan but data was
empty. |
|
863
|
Wednesday, March 10, 2021, 14:57 |
Aaron Schmidt | | HP-FEBIAD | | | | 42752-5 | In progress | Emittance meter test with FEBIAD | Wednesday, March 10, 2021, 14:54: Roughing.
Wednesday, March 10, 2021, 14:57:
BV1A open. |
|
359
|
Wednesday, February 05, 2014, 11:27 |
Anders Mjos | | | | | | | Problems/Solutions | Emittance Rig installation | Wednesday, February 05, 2014, 11:27 : Stopped
turbos
2x spacers ITD0468 1/8" |
  |
366
|
Friday, March 21, 2014, 14:12 |
Anders Mjos | | | | | | | Problems/Solutions | Elevated backing pressure on ISAC Test Stand TMS:RP2 | The performance of the roughing pump has
gradually gone down. Notably after the system
has been vented. See attached screenshot |
|
383
|
Thursday, June 12, 2014, 09:28 |
Anders Mjos | | | | | | | Problems/Solutions | Elevated backing pressure on ISAC Test Stand TMS:RP2 |
|
|
|