714
|
Tuesday, March 26, 2019, 10:44 |
Aaron Schmidt | | | | | | | Problems/Solutions | EZL PS replaced. Test | EZL checked. OK @ 5kV
BIAS PS issues.
2.3kV on screen. Read back on PS |
|
|
715
|
Wednesday, March 27, 2019, 11:01 |
Aaron Schmidt | | | | | | | Problems/Solutions | BIAS PS replaced. Test | Wednesday, March 27, 2019, 10:25: BIAS
@ 1 kV
952V - 548uA on controls readback |
|
|
716
|
Friday, April 05, 2019, 07:02 |
Aaron Schmidt | | LP-FEBIAD | | | 395530-3 | 42752-5 | In progress | TS operation test - LP FEBIAD | Due to previous issues, a full run / test
should be performed on the ISAC Test Stand.
Friday, April 05, 2019, 07:00: RGA |
|
|
717
|
Monday, April 15, 2019, 14:42 |
Aaron Schmidt | | LP-SIS | | | | 42972-1 | Done | Conditioning UC#27 HS & test FS#3 | New coil lines installed for P2N testing
later.
Monday, April 15, 2019, 14:15: Roughing. |
|
|
718
|
Tuesday, April 23, 2019, 14:39 |
Aaron Schmidt | | LP-SIS | | | | 42752-8 | Done | Conditioning UC#28 HS | Tuesday, April 23, 2019, 14:39: Roughing.
Tuesday, April 23, 2019, 15:09: Turbo
pumps started. |
|
|
720
|
Friday, May 03, 2019, 08:30 |
Anders Mjos | | | | | | | In progress | Training | Training: Venting and pump down
Friday, May 03, 2019, 08:30: Turbo
pumps stopped. |
|
|
723
|
Wednesday, May 22, 2019, 13:47 |
Aaron Schmidt | | | | | | | | Calibrated Masscorr | Wednesday, May 22, 2019, 13:44: Calibration
Confirmed.
New Masscorr setup: |
|
|
728
|
Friday, June 07, 2019, 16:56 |
Carla Babcock | | | | | | | | TM4 source tray state | TM4 source tray left in test stand over
weekend, just the rouging pumps on. Ready
to be removed Monday morning. |
|
|
729
|
Monday, June 10, 2019, 14:34 |
Aaron Schmidt | | | | | | | Done | Removed TM4 Source Tray | Monday, June 10, 2019, 09:30: TM4 Source
Tray removed - To HC area. |
|
|
730
|
Monday, June 10, 2019, 14:35 |
Aaron Schmidt | | | | | | | Done | Optics Tray / EZL inspection. | Monday, June 10, 2019, 13:00: Optics Tray
removed.
Megger'd @ 1000V on EZL and Collimator. |
|
|
731
|
Tuesday, June 11, 2019, 14:33 |
Aaron Schmidt | Test FEBIAD | LP-FEBIAD | | | 395530-3 | 42752-5 | In progress | ISAC Source tray re-installed w/ optics tray. | Tuesday, June 11, 2019, 14:33: Roughing.
Wednesday, June 12, 2019,
08:18: Venting to install FEBIAD. |
|
|
732
|
Thursday, June 13, 2019, 14:05 |
Aaron Schmidt | | | | | | | Done | Spare TGHT PS installed. | Thursday, June 13, 2019, 14:04: Spare TGHT
PS installed / tested. The old one
is to be sent out for repair. |
|
|
733
|
Wednesday, June 19, 2019, 17:25 |
Fernando Maldonado | | | | | | | Done | Thermocouple connection | Wednesday, June 19, 2019, 17:13 Ferran
and Fernando tested the 9-pin connector to
have a reading on a thermocouple following |
|
|
734
|
Friday, June 21, 2019, 15:12 |
Aaron Schmidt | P2N - 1 | | | | | | | P2N - 1 - 2019 | Friday, June 21, 2019, 14:48: Roughing.
Friday, June 21, 2019, 15:18: Turbo
pumps on. |
|
|
735
|
Saturday, June 22, 2019, 17:05 |
Luca Egoriti | p2n | | | | | | Done | Test stand installation | I opened the test stand because I forgot
to install tantalum heat shields around the
target. Everything was reinstalled as before |
|
|
736
|
Monday, June 24, 2019, 15:41 |
Fernando Maldonado | | | | | | | Problems/Solutions | TMS:Q3 polarity | Monday, June 24, 2019, 15:25: Current quadrupole
polarities:
|
|
|
737
|
Tuesday, June 25, 2019, 17:19 |
Fernando Maldonado | | | | | | | Problems/Solutions | Burnt cables on top of the test stand | Tuesday, June 25, 2019, 16:15: While inspecting
the 9-pin connection with Ferran, it was
noticed how two braided cables were burnt |
|
|
739
|
Wednesday, June 26, 2019, 14:41 |
Carla Babcock | none | | | | | | Problems/Solutions | Issues with test stand wiring in service cap area | The wiring on the top of the test stand
was burned, see entry 737.
Probable cause of this is as follows: |
|
|
740
|
Thursday, June 27, 2019, 09:51 |
Fernando Maldonado | | | | | | | Problems/Solutions | Melted cables changed | See elog 737
|
|
|
741
|
Tuesday, July 02, 2019, 18:25 |
Fernando Maldonado | | | | | | | Done | Blank on FEBIAD gas line installed | Tuesday, July 02, 2019, 18:24: A
blind is installed on the FEBIAD gas
line (see attached picture) to |
|
|