578
|
Wednesday, April 12, 2017, 16:04 |
Anders Mjos | | | | | | | Problems/Solutions | Leak on FS#3 COIL and EE | A water to vacuum leak has been found on
FS#3. The leak is not detected on the leak
detector, but can be seen as an increase |
|
|
579
|
Tuesday, April 18, 2017, 07:46 |
Aaron Schmidt | | | | | | | Problems/Solutions | TSG:TP1B & TSG:BV1B tripped | Tuesday, April 18, 2017, 07:30: TSG : TP1B
Tripped on Saturday.
Tuesday, April 18, 2017, 07:40: TSG |
|
|
580
|
Tuesday, May 02, 2017, 14:03 |
Aaron Schmidt | | | | | | | | Pump down empty chamber. (FS#3 out) | Check to fit lines FS#3
Tuesday, May 02, 2017, 14:00: Rouging.
Wednesday, May 03, 2017, |
|
|
583
|
Wednesday, May 10, 2017, 15:07 |
Aaron Schmidt | | | | | | | | Pump down empty chamber. (FS#3 out) | FS#3 lines blanked off.
Wednesday, May 10, 2017, 14:40: Roughing
Wednesday, May 10, 2017, 15:05: Turbos |
|
|
587
|
Wednesday, May 24, 2017, 11:12 |
Anders Mjos | | | | | | | Problems/Solutions | FEBIAD Anode bias configuration | The Test Stand has been configured
for Anode bias. John Chow changed the power
supply and the electrical connections have |
|
|
589
|
Saturday, June 03, 2017, 09:34 |
Anders Mjos | | | | | | | Problems/Solutions | FEBIAD Cathode bias configuration |
|
|
|
590
|
Tuesday, June 06, 2017, 09:22 |
Aaron Schmidt | | | | | | | | Pump down empty chamber | Tuesday, June 06, 2017, 09:21: roughing.
Friday, June 09, 2017, 08:50:
Ion gauge off. Turbo pumps off. |
|
|
591
|
Wednesday, June 07, 2017, 12:49 |
Aaron Schmidt | | | | | | | | Gas bottles | Gas bottles for FEBIAD testing were
exchanged yesterday around 1:30. One Neon
& one Argon bottle were removed. |
|
|
593
|
Friday, June 16, 2017, 11:23 |
Aaron Schmidt | | | | | | | | Pump down empty chamber. | Friday, June 16, 2017, 11:22: roughing.
Friday, June 16, 2017, 14:28: Turbo
pumps on |
|
|
597
|
Monday, July 17, 2017, 09:55 |
Aaron Schmidt | | | | | 41882-4 | 42738-1 | In progress | Out Gas HS for Target Cleaning Test | -No EE. Insulators, gripper arms,
and blank EE plate included |
|
|
600
|
Wednesday, July 19, 2017, 09:13 |
Aaron Schmidt | Ta Targets | | | | | | Done | Ion Peaks | Attached is a recent list of Ta targets
with their extracted ions peaks. |
|
|
601
|
Thursday, August 03, 2017, 17:00 |
Anders Mjos | | | | | | | Problems/Solutions | Vacuum system tripped on power interruption | Thursday, August 03, 2017, 17:00:
Restarted TPs |
|
|
603
|
Thursday, August 17, 2017, 12:45 |
Anders Mjos | | | | | | | Problems/Solutions | TBHT power supply removed | The Xantrex 10V 600 A power supply
for the TBHT has been moved to ITE to replace
the failed TGHT power supply |
|
|
604
|
Monday, August 21, 2017, 16:20 |
Anders Mjos | | | | | | | Problems/Solutions | TBHT power supply removed |
|
|
|
606
|
Monday, September 25, 2017, 14:10 |
Aaron Schmidt | | | | | | | | Pump down empty chamber | Monday, September 25, 2017, 14:10: Roughing.
Wednesday, September 27,
2017, 08:23: Turbo pumps on |
|
|
608
|
Tuesday, October 10, 2017, 13:10 |
Aaron Schmidt | | | | | | | | Gas bottles | Tuesday, October 10, 2017, 09:30:
Install/swap gas bottles. Elog.
Removed smallest Neon leak. Neon |
|
|
609
|
Tuesday, October 10, 2017, 14:56 |
Aaron Schmidt | | | | | | | In progress | FEBIAD Anode bias configuration | Unable to hold Anode voltage after power
supply change out.
Tuesday, October 10, 2017, 14:55: |
|
|
611
|
Monday, October 16, 2017, 11:46 |
Aaron Schmidt | | | | | | | In progress | Pump down empty chamber Test EE | Monday, October 16, 2017, 11:45: Roughing.
Monday, October 16, 2017, 12:05:
Turbo pumps started. |
|
|
612
|
Tuesday, October 24, 2017, 11:38 |
Anders Mjos | | | | | | | | FEBIAD coil magnetic field measurment | with Fernando
Tuesday, October 24, 2017: Testing
setup with triple coil |
|
|
613
|
Monday, October 30, 2017, 08:54 |
Anders Mjos | | | | | | | Problems/Solutions | TMS:TP6 shut down due to high noise | The turbo pump will need replacement. |
|