  714   Tuesday, March 26, 2019, 10:44 Aaron Schmidt      Problems/SolutionsEZL PS replaced. TestEZL checked. OK @ 5kV
BIAS PS issues.
2.3kV on screen. Read back on PS
 New_EZL_PS_testing_-_2019.docx 
  715   Wednesday, March 27, 2019, 11:01 Aaron Schmidt      Problems/SolutionsBIAS PS replaced. TestWednesday, March 27, 2019, 10:25: BIAS
@ 1 kV
952V - 548uA on controls readback
 NEW_BIAS_PS_testing_-_2019.docx 
  716   Friday, April 05, 2019, 07:02 Aaron Schmidt LP-FEBIAD  395530-342752-5In progressTS operation test - LP FEBIADDue to previous issues, a full run / test
should be performed on the ISAC Test Stand.
Friday, April 05, 2019, 07:00: RGA
 TS_-_New_BIAS__EZL_Testing_-_2019.docxTS-2019-04-05-07-00.rga 
  717   Monday, April 15, 2019, 14:42 Aaron Schmidt LP-SIS   42972-1DoneConditioning UC#27 HS & test FS#3New coil lines installed for P2N testing
later.
Monday, April 15, 2019, 14:15: Roughing.
 UC#27_&_FS#3_check.docxTS-2019-04-16-08-20.rga 
  718   Tuesday, April 23, 2019, 14:39 Aaron Schmidt LP-SIS   42752-8DoneConditioning UC#28 HS Tuesday, April 23, 2019, 14:39: Roughing.
Tuesday, April 23, 2019, 15:09: Turbo
pumps started.
 TS-2019-04-24-07-30.rgaUC#28_HS.docx 
  720   Friday, May 03, 2019, 08:30 Anders Mjos      In progressTrainingTraining: Venting and pump down
Friday, May 03, 2019, 08:30: Turbo
pumps stopped.
  
  723   Wednesday, May 22, 2019, 13:47 Aaron Schmidt       Calibrated MasscorrWednesday, May 22, 2019, 13:44: Calibration
Confirmed.
New Masscorr setup:
  
  728   Friday, June 07, 2019, 16:56 Carla Babcock       TM4 source tray stateTM4 source tray left in test stand over
weekend, just the rouging pumps on. Ready
to be removed Monday morning.
  
  729   Monday, June 10, 2019, 14:34 Aaron Schmidt      DoneRemoved TM4 Source TrayMonday, June 10, 2019, 09:30: TM4 Source
Tray removed - To HC area.
  
  730   Monday, June 10, 2019, 14:35 Aaron Schmidt      DoneOptics Tray / EZL inspection.Monday, June 10, 2019, 13:00: Optics Tray
removed.
Megger'd @ 1000V on EZL and Collimator.
 20190610_135100.jpg20190610_135926.jpg20190610_135045.jpg20190610_135517.jpg 
  731   Tuesday, June 11, 2019, 14:33 Aaron SchmidtTest FEBIADLP-FEBIAD  395530-342752-5In progressISAC Source tray re-installed w/ optics tray.Tuesday, June 11, 2019, 14:33: Roughing.

Wednesday, June 12, 2019,
08:18: Venting to install FEBIAD.
  
  732   Thursday, June 13, 2019, 14:05 Aaron Schmidt      DoneSpare TGHT PS installed.Thursday, June 13, 2019, 14:04: Spare TGHT
PS installed /  tested. The old one
is to be sent out for repair.
  
  733   Wednesday, June 19, 2019, 17:25 Fernando Maldonado      DoneThermocouple connectionWednesday, June 19, 2019, 17:13  Ferran
and Fernando tested the 9-pin connector to
have a reading on a thermocouple following
  
  734   Friday, June 21, 2019, 15:12 Aaron SchmidtP2N - 1      P2N - 1 - 2019Friday, June 21, 2019, 14:48: Roughing.
Friday, June 21, 2019, 15:18: Turbo
pumps on.
  
  735   Saturday, June 22, 2019, 17:05 Luca Egoritip2n     DoneTest stand installationI opened the test stand because I forgot
to install tantalum heat shields around the
target. Everything was reinstalled as before
  
  736   Monday, June 24, 2019, 15:41 Fernando Maldonado      Problems/SolutionsTMS:Q3 polarityMonday, June 24, 2019, 15:25: Current quadrupole
polarities:
  
  737   Tuesday, June 25, 2019, 17:19 Fernando Maldonado      Problems/SolutionsBurnt cables on top of the test standTuesday, June 25, 2019, 16:15: While inspecting
the 9-pin connection with Ferran, it was
noticed how two braided cables were burnt
 20190625_154015.jpg20190625_153834.jpg20190625_165001.jpg 
  739   Wednesday, June 26, 2019, 14:41 Carla Babcocknone     Problems/SolutionsIssues with test stand wiring in service cap areaThe wiring on the top of the test stand
was burned, see entry 737.
Probable cause of this is as follows:
 isk4523d_ITSrewiring_June2019.png 
  740   Thursday, June 27, 2019, 09:51 Fernando Maldonado      Problems/SolutionsMelted cables changedSee elog 737 

  
  741   Tuesday, July 02, 2019, 18:25 Fernando Maldonado      DoneBlank on FEBIAD gas line installed Tuesday, July 02, 2019, 18:24: A
blind is installed  on the FEBIAD gas
line (see attached picture)  to
 20190702_182254.jpg 