  304   Tuesday, May 21, 2013, 19:38 Friedhelm Ames      Problems/Solutionsmagnet power supply water leakThe cyclotron operators discovered a water
leak in the magnet power supply. The water
is valved off and the power is off. A fault
  
  303   Tuesday, May 21, 2013, 15:50 Rick MaharajCTL Febiad      Cooling Water Turned OnCooling water turned on when vacuum reading
5.54e-06 T. Vacuum steadily increasing. Ion
gauge reading steadily decreasing now reading
  
  302   Tuesday, May 21, 2013, 15:14 Rick MaharajCTL Febiad      Turbos StartedTurbos started   
  301   Tuesday, May 21, 2013, 14:58 Rick MaharajCTL Febiad      CTL Febiad InstalledCeramic coated coil development target
removed. CTL Febiad target installed.
Roughing chamber.
  
  300   Tuesday, May 21, 2013, 10:09 Rick Maharaj       Test stand VentedTurbos stopped, waterlines flushed, chamber
vented
  
  299   Thursday, May 09, 2013, 15:28 Anders Mjos      Problems/SolutionsTSGRP1 showing signs of reduced performanceTSG:CG1A and TSG:CG1B shows an increase
in vacuum.
See attached archived data for details.
 Archiver.PNG 
  298   Wednesday, May 08, 2013, 08:52 Anders Mjos      Problems/SolutionsTMS and TPS P/S problemsWednesday, May 08, 2013, 08:52: TMS:CB5
found off this morning. Switched back on.
Wednesday, May 08, 2013, 12:14: Lost
  
  297   Friday, May 03, 2013, 14:32 Anders Mjos      Problems/SolutionsCathode PS cable reconnected 

 ISK4523D-rev4.pdfISK4563D-rev3.pdf 
  296   Thursday, April 25, 2013, 13:32 Anders MjosEmptyLP-FEBIAD  Tube Only38307-9 In progressFEBIAD Coil testSame target as in e-log entry https://elog.triumf.ca/TIS/Test-Stand/106
Thursday, April 25, 2013, 13:54:
Roughing
 2014-04-30_FEBIAD_COIL_AWG18.PNG2014-05-01_FEBIAD_COIL_AWG18.PNGTarget_Assembly.pdf 
  295   Thursday, April 18, 2013, 13:50 Anders MjosTa#40HP-SISITETM438295-4 DoneTa#40 stored under vacuumTarget installed at the Test Stand after
an inspection in the lab. EE was cleand.
All bolts torqued to 130 in lbs
  
  294   Tuesday, April 16, 2013, 08:59 Anders Mjos      Problems/SolutionsTMS:TP2 found in timeout / fault stateTuesday, April 16, 2013, 08:59
The turbo was found in fault state
this morning. Based on data from IG6 the
 TMS-TP2_Fault.pngTMS-IG6-RDVAC.png 
  293   Thursday, April 11, 2013, 08:49 Anders Mjos      Problems/SolutionsMB1 Power Supply operational 

    
  
  292   Wednesday, April 10, 2013, 12:14 Anders MjosTa#40HP-SISITETM438295-4 DoneConditioning Ta#40 Wednesday, April 10, 2013, 12:13:
Stopped turbos in preparation for venting
the chamber.
  
  291   Tuesday, April 09, 2013, 16:21 Anders Mjos      Problems/SolutionsWater leak at MB1 Power Supply 

    
  
  290   Tuesday, April 02, 2013, 15:19 Anders Mjos      Problems/SolutionsWater leak at MB1 Power SupplySee
Cyclotron e-fault 6637
 
  
  289   Thursday, March 28, 2013, 13:55 Anders MjosEmpty     In progressPumping down empty chamberThursday, March 28, 2013, 13:55: Roughing
Thursday, March 28, 2013, 14:36:
Starting turbos (vacuum at ~0.100 T)
  
  288   Monday, March 25, 2013, 16:50 Sebastian Raeder      Problems/SolutionsRFQ powersupplies removed - Anode PS still connected to groundThe powersupplies added to the teststand
for operation of the IGLIS source have been
removed from the HV cage as well as the RFQ
  
  287   Monday, March 25, 2013, 11:39 Anders MjosTa#39LP-SISITWTM1  DoneTa#39 commissioningTarget installed with 130 in lbs torque
on all bolts.
Monday, March 25, 2013, 11:36: Roughing
  
  286   Thursday, March 21, 2013, 15:05 Sebastian RaederSiC#28 ITETM4  Done2nd heating of SiC#28 LP-RFQ - short resolved 

    
 20130322_heating.png20130322_massscan_transmission.png20130322_massscan_suppression1.png20130322_suppression2.pnglegs.JPG 
  285   Tuesday, March 19, 2013, 19:13 Sebastian Raeder      Problems/Solutions9 Pin connector rewired to match wiring in TM4The 9 Pin connector was rewired in the
ISAC teststand to match the wiring in TM4
The wiring from the connection board
  