ID |
Date |
Author |
Target/No.# |
Source |
Station |
Module |
Target Oven W.O# |
Heat Shield W.O# |
Status |
Subject |
|
308
|
Wednesday, May 29, 2013, 12:10 |
Anders Mjos | CTL FEBIAD | HP-FEBIAD | | | 38481-5 | | Done | CTL Test | Wednesday, May 29, 2013, 12:09: Debiased to insert temp logger
Wednesday, May 29, 2013, 14:40: Temp logger installed
CH1 COIL
CH2 CTL Block
Wednesday, May 29, 2013, 14:51: Opening gas lines
Temperatures [deg C]
COIL: 190
CTL: 44
Wednesday, May 29, 2013, 15:31: Coil at 50A
Temperatures [deg C]
COIL: 212
CTL: 45
Thursday, May 30, 2013, 09:18: TGHT was voltage limited at about 570A. Increased voltage limit to 5.5V and raised current to 580A
Thursday, May 30, 2013, 09:20: Ramping TBHT to 280A
Thursday, May 30, 2013, 10:03
Temperatures [deg C]
COIL: 227
CTL: 48
Thursday, May 30, 2013, 10:07: Heard a noise from the vacuum chamber coinciding with a spike in vacuum on both gauges.
Monday, June 03, 2013, 08:54: Target debiased and gases off. Target cooling started in preparation for power outage tomorrow at 9am.
Wednesday, June 05, 2013, 09:57: Purging gas lines to vacuum chamber
Wednesday, June 05, 2013, 10:13: Target biased again. Started target heating.
Thursday, June 06, 2013, 13:23:
Temperatures [deg C]
COIL: 227
CTL: 48
Thursday, June 06, 2013, 16:45: TBHT increased ti 290A
Temperatures [deg C]
COIL: 230
CTL: 50
Friday, June 07, 2013, 08:40: Magnet found off. TPS:Q4 and TPS:Q2 found off.
Temperatures [deg C]
COIL: 227
CTL: 48
Friday, June 07, 2013, 14:21: Anode current limit increased to 500 mA. Adjusted magnet current. Increasing TBHT.
Friday, June 07, 2013, 16:24: TBHT at 296A
Temperatures [deg C]
COIL: 237
CTL: 50
Monday, June 10, 2013, 08:19
Temperatures [deg C]
COIL: 232
CTL: 49
Monday, June 10, 2013, 16:55: COIL at 60A
Temperatures [deg C]
COIL: 244
CTL: 49
Tuesday, June 11, 2013, 08:42: TBHT voltage limited this morning at 291A
Temperatures [deg C]
COIL: 242
CTL: 49
Tuesday, June 11, 2013, 11:02: COIL at 70A
Temperatures [deg C]
COIL: 256
CTL: 49
Tuesday, June 11, 2013, 15:49: COIL at 80A
Temperatures [deg C]
COIL: 272
CTL: 49
Wednesday, June 12, 2013, 08:19:
Short on TBHT - see attached photo.
T/C logger is is off.
Gas lines closed.
Cooling down target.
Target debiased.
Thursday, June 13, 2013, 08:37: Turbos stopped.
Thursday, June 13, 2013, 09:20: Water lines purged.
Thursday, June 13, 2013, 09:41: Venting
Thursday, June 13, 2013, 10:19: Target removed |
Attachment 1: Photo_2013-06-13_10_33_42_AM.jpg
|
|
|
307
|
Tuesday, May 28, 2013, 09:53 |
Anders Mjos | | | | | | | Problems/Solutions | TPS:Q4 and TPS:Q2 restarted | |
|
306
|
Tuesday, May 28, 2013, 09:51 |
Anders Mjos | | | | | | | Problems/Solutions | Archivers restarted | COIL and ANODE data added to ISACT Data Archiver |
|
305
|
Friday, May 24, 2013, 15:13 |
Aurelia Laxdal | CLT FEBIAD | | | | | | | CLT FEBIAD conditioning started | Purged the gas lines, turned on the HV and started the heaters for CLT FEBIAD: TGHT up to 580A and TBHT up to 230A. |
|
304
|
Tuesday, May 21, 2013, 19:38 |
Friedhelm Ames | | | | | | | Problems/Solutions | magnet power supply water leak | The cyclotron operators discovered a water leak in the magnet power supply. The water is valved off and the power is off. A fault report has been issued to the power supplies group. |
|
303
|
Tuesday, May 21, 2013, 15:50 |
Rick Maharaj | CTL Febiad | | | | | | | Cooling Water Turned On | Cooling water turned on when vacuum reading 5.54e-06 T. Vacuum steadily increasing. Ion gauge reading steadily decreasing now reading 4.48e-06 T. |
|
302
|
Tuesday, May 21, 2013, 15:14 |
Rick Maharaj | CTL Febiad | | | | | | | Turbos Started | Turbos started |
|
301
|
Tuesday, May 21, 2013, 14:58 |
Rick Maharaj | CTL Febiad | | | | | | | CTL Febiad Installed | Ceramic coated coil development target removed. CTL Febiad target installed.
Roughing chamber. |
|
300
|
Tuesday, May 21, 2013, 10:09 |
Rick Maharaj | | | | | | | | Test stand Vented | Turbos stopped, waterlines flushed, chamber vented |
|
299
|
Thursday, May 09, 2013, 15:28 |
Anders Mjos | | | | | | | Problems/Solutions | TSGRP1 showing signs of reduced performance | TSG:CG1A and TSG:CG1B shows an increase in vacuum.
See attached archived data for details. |
Attachment 1: Archiver.PNG
|
|
|
298
|
Wednesday, May 08, 2013, 08:52 |
Anders Mjos | | | | | | | Problems/Solutions | TMS and TPS P/S problems | Wednesday, May 08, 2013, 08:52: TMS:CB5 found off this morning. Switched back on.
Wednesday, May 08, 2013, 12:14: Lost the following devices during a mass scan
TMS:VCB5
TMS:OCT3
TPS:Q4
TPS:Q2
TPS:Q1
TSG:CBC
All devices but TPS:Q1 could be completely restored.
Wednesday, May 08, 2013, 12:49: TPS:Q1 restored by lowering and increasing the voltage
|
|
297
|
Friday, May 03, 2013, 14:32 |
Anders Mjos | | | | | | | Problems/Solutions | Cathode PS cable reconnected |
Sebastian Raeder wrote: |
The powersupplies added to the teststand for operation of the IGLIS source have been removed from the HV cage as well as the RFQ driver.. The connections of the 9PIN connector in the HV cage have been grounded and the wire used for an voltage offset of the source has been removed.
NOTE: The Anode PS cable (used for biasing the target with a FEBIAD) is left grounded --> has to be rewired when running a FEBIAD source - Anode PS is turned off
|
Friday, May 03, 2013
The anode cable has been reconnected to F/T J and the 100k resistor placed between L and J. Q is now grounded to L. See dwg ISK4523
Tuesday, May 07, 2013
The cathode cable has been reconnected to F/T B and the 100k resistor removed between L and J. See dwg ISK4563 Rev 3
|
Attachment 1: ISK4523D-rev4.pdf
|
|
Attachment 2: ISK4563D-rev3.pdf
|
|
|
296
|
Thursday, April 25, 2013, 13:32 |
Anders Mjos | Empty | LP-FEBIAD | | | Tube Only | 38307-9 | In progress | FEBIAD Coil test | Same target as in e-log entry https://elog.triumf.ca/TIS/Test-Stand/106
Thursday, April 25, 2013, 13:54: Roughing
Thursday, April 25, 2013, 14:25: Started turbos
Thursday, April 25, 2013, 14:33: Turbos at speed
Thursday, April 25, 2013, 14:33: Vacuum at 8.8E-6 T
Friday, April 26, 2013, 08:25: Cooling water supply opened. Vacuum stable at 2.2E-7 T
Friday, April 26, 2013, 13:35: Gas lines evacuated.
Testing Coil current vs Temperature before heating
COIL:RDCUR at 1.95A
COIL:RDVOL at 1.47V
COIL T/C at 86 deg C and still slowly increasing
Tuesday, April 30, 2013
Testing Coil current vs Temperature before heating
COIL:RDCUR at 3.96A
COIL:RDVOL 3.2 V Vacuum starts to increase (base 1.4E-7
COIL:RDVOL 3.8 V T/C at 150 C vacuum at 5E-7
COIL:RDCUR at 3.47A to reduce out-gassing T/C at 175 C
Tuesday, April 30, 2013, 12:39
COIL:RDCUR at 3.96A T/C 225 C
COIL:RDVOL 5.0 V T/C at 250 C vacuum at 6.2E-7
Tuesday, April 30, 2013, 13:00
COIL:RDCUR at 4.25A COIL:RDVOL at 5.7V T/C 290 C
Tuesday, April 30, 2013, 13:10
COIL:RDCUR at 4.15A COIL:RDVOL at 5.75V T/C 310 C
Tuesday, April 30, 2013, 14:53
COIL:RDCUR at 4.15A COIL:RDVOL at 5.85V T/C 320 C
Tuesday, April 30, 2013, 16:30
COIL:RDCUR at 4.15A COIL:RDVOL at 5.89V T/C 328 C
Wednesday, May 01, 2013, 08:16
COIL:RDCUR at 4.15A COIL:RDVOL at 5.95V T/C 350 C - P/S is voltage limited at 5.95V
Ramping down current to 0. T/C logger is required elsewhere.
Friday, May 03, 2013, 12:07: Pumping out gas line through vacuum chamber.
The anode cable has been reconnected (see e-log entry 297)
Friday, May 03, 2013, 14:17: BIAS and EE to 30kV and -800V
Friday, May 03, 2013, 14:24: Started heating TBHT to 280A at 1A/min
Monday, May 06, 2013, 08:46: TBHT @ 276A, Voltage limiting at 2.5V. Increased limit to 2.7V. TGHT to 280A and 2.52V. COIL temp ~100C
Monday, May 06, 2013, 09:48: COIL:RDCUR at 2.93A
Monday, May 06, 2013, 10:34: Coil temp ~240C. Increasing COIL:RDCUR to 3.52A COIL:RDVOL at 4.1V
Monday, May 06, 2013, 11:48: Coil temp 330C COIL:RDCUR at 3.52A RDVOL at 4.9V
Monday, May 06, 2013, 11:54: COIL:RDCUR at 3.9A
Monday, May 06, 2013, 12:56: RDVOL at 5.9V. Coil temp ~380C
Monday, May 06, 2013, 13:47: Cooling down target to correct anode connection.
Tuesday, May 07, 2013, 08:47: De-biased
Tuesday, May 07, 2013, 10:06: Corrected el. connections to cathode floating. Started tube heating to 280A
Wednesday, May 08, 2013, 12:12: De-biased
Wednesday, May 08, 2013, 12:12: Cooling down cathode 1A/min
Thursday, May 09, 2013, 15:22: TPS:IV4 closed |
Attachment 1: 2014-04-30_FEBIAD_COIL_AWG18.PNG
|
|
Attachment 2: 2014-05-01_FEBIAD_COIL_AWG18.PNG
|
|
Attachment 3: Target_Assembly.pdf
|
|
|
295
|
Thursday, April 18, 2013, 13:50 |
Anders Mjos | Ta#40 | HP-SIS | ITE | TM4 | 38295-4 | | Done | Ta#40 stored under vacuum | Target installed at the Test Stand after an inspection in the lab. EE was cleand. All bolts torqued to 130 in lbs
Thursday, April 18, 2013, 13:48: Rouging
Thursday, April 18, 2013, 14:11: Starting turbos
Thursday, April 18, 2013, 14:20 : Turbos at speed
Thursday, April 18, 2013, 14:21 : Vacuum at 2.3E-5 T
Friday, April 19, 2013, 08:23: Opened cooling water. Vacuum stable at 9.6E-6 T
Vacuum is somewhat higher than expected (5.2E-7 T) . Will went and clean the o-rings on the doors.
Monday, April 22, 2013, 09:32: Turbos off.
Monday, April 22, 2013, 10:57: Venting
Monday, April 22, 2013, 12:25: Vented
Monday, April 22, 2013, 14:09: Roughing
Monday, April 22, 2013, 14:31: Started Turbos
Monday, April 22, 2013, 14:40: Turbos at speed
Monday, April 22, 2013, 14:41: Vacuum at 1.8E-5 T
Tuesday, April 23, 2013, 09:52 : Vacuum at 2.6E-7 T - already an improvement from yesterday
Thursday, April 25, 2013, 08:47: Stopped turbos. A test target with at new FEBIAD coil will be tested.
Thursday, April 25, 2013, 13:27: Venting |
|
294
|
Tuesday, April 16, 2013, 08:59 |
Anders Mjos | | | | | | | Problems/Solutions | TMS:TP2 found in timeout / fault state | Tuesday, April 16, 2013, 08:59
The turbo was found in fault state this morning. Based on data from IG6 the pump stopped around midnight.
An attempt to restart the pump will be made after the conditioning of Ta#40 is complete later today.
The TP has recently been replaced:
https://elog.triumf.ca/TIS/Test-Stand/280
Tuesday, April 16, 2013, 16:23: TMS:TP2 restarted I=1.0A P=21W T=29C @ 42kRPM
Wednesday, April 17, 2013, 16:19: TMS:TP2 I=0.8A P=14W T=29C @ 42kRPM |
Attachment 1: TMS-TP2_Fault.png
|
|
Attachment 2: TMS-IG6-RDVAC.png
|
|
|
293
|
Thursday, April 11, 2013, 08:49 |
Anders Mjos | | | | | | | Problems/Solutions | MB1 Power Supply operational |
Anders Mjos wrote: |
Tuesday, April 09, 2013:
Water leak has been repaired, but P/S could not be turned on. Ground interlock still latched. The base of the cabinet was filled with water - most of the water could be scooped out with a bucket.
Wednesday, April 10, 2013:
Removed the remaining water in the P/S rack.
|
Thursday, April 10, 2013:
The power supply is again operational. See e-fault entry above for details. |
|
292
|
Wednesday, April 10, 2013, 12:14 |
Anders Mjos | Ta#40 | HP-SIS | ITE | TM4 | 38295-4 | | Done | Conditioning Ta#40 | Wednesday, April 10, 2013, 12:13: Stopped turbos in preparation for venting the chamber.
Wednesday, April 10, 2013, 13:05: Venting
Wednesday, April 10, 2013, 13:37: Ta#40 installed with 130 in lbs torque on all bolts.
Wednesday, April 10, 2013, 13:37: Roughing
Wednesday, April 10, 2013, 13:58: Started turbos
Wednesday, April 10, 2013, 14:07: Turbos at speed
Wednesday, April 10, 2013, 14:08: Vacuum at 9.2E-6 Torr
Thursday, April 11, 2013, 08:26: Opened cooling water. Vacuum stable at 2.2E-7 Torr
Monday, April 15, 2013, 08:40: HV conditioned to 30kV TSG:BIAS:RDCUR at 37 uA
Monday, April 15, 2013, 08:46: Started Target Heat Ramp 580A / 230A
Monday, April 15, 2013, 13:30: Target at temperature TGHT:RDCUR=574A, TBHT:RDCUR=230A
Monday, April 15, 2013, 15:10: Mass scan
Monday, April 15, 2013, 16:21: Target will be left at temperature overnight.
Tuesday, April 16, 2013, 08:40: Mass scan
Tuesday, April 16, 2013, 13:08: Started Target Cooling Sequence
Wednesday, April 17, 2013, 08:43: High voltage BIAS to zero
Wednesday, April 17, 2013, 08:47: Turbos off
Wednesday, April 17, 2013, 16:20: Target will likely be removed tomorrow Thursday.
Thursday, April 18, 2013, 11:13 : Venting
Thursday, April 18, 2013, 11:17: Water lines purged
Thursday, April 18, 2013, 11:29: Chamber vented. Target Removed |
|
291
|
Tuesday, April 09, 2013, 16:21 |
Anders Mjos | | | | | | | Problems/Solutions | Water leak at MB1 Power Supply |
Tuesday, April 09, 2013:
Water leak has been repaired, but P/S could not be turned on. Ground interlock still latched. The base of the cabinet was filled with water - most of the water could be scooped out with a bucket.
Wednesday, April 10, 2013:
Removed the remaining water in the P/S rack. |
|
290
|
Tuesday, April 02, 2013, 15:19 |
Anders Mjos | | | | | | | Problems/Solutions | Water leak at MB1 Power Supply | See Cyclotron e-fault 6637
|
|
289
|
Thursday, March 28, 2013, 13:55 |
Anders Mjos | Empty | | | | | | In progress | Pumping down empty chamber | Thursday, March 28, 2013, 13:55: Roughing
Thursday, March 28, 2013, 14:36: Starting turbos (vacuum at ~0.100 T)
Thursday, March 28, 2013, 14:44: Both turbos at speed
Thursday, March 28, 2013, 14:46: Vacuum at 5.2E-6 Torr |
|