Tuesday, September 07, 2021, 16:04, Alexander Shkuratoff, , , , , , , Done, Replaced flange on F/T R with blank flange
|
Feedthrough R had a flange installed with a HV feedthrough on it for TM3 service tray prototype HV tests. It was replaced today with the original blank
flange. |
Thursday, November 04, 2021, 11:55, Fernando Maldonado, , , , , , , Done, Opening vacuum chamber for thesis pictures :p
|
Thursday, November 04, 2021, 11:54: Venting
water loop removed
Thursday, November 04, 2021, 13:39: Roughing |
Friday, May 27, 2022, 07:19, Fernando Maldonado, , , , , , , Done, FEBIAD parameter scan web-app and brief description (with links)
|
A web-app for systematic FEBIAD parametrizations has been develop and now includes the ISAC Test Stand (ITS) :
https://beta.hla.triumf.ca/degaussing/FEBIAD-scan/
Upon landing in the web-app the ITS will be selected by default as well as the TMS:FC6:SCALECUR faraday cup, which corresponds the last cup of |
Monday, September 25, 2023, 16:31, Aaron Schmidt, Ta#66, LP-SIS, ITW, TM2, 45220-5, 45235-9, Done, Conditioning Ta#66 & HV Tests.  
|
Thermocouples installed on the left end plate x 2.
Monday, September 25, 2023, 16:23: Roughing.
Monday, September 25, 2023, 16:51: TP1B on. |
Tuesday, December 12, 2023, 12:41, Aaron Schmidt, , , , , , , Done, Source Tray / TS inspection
|
Tuesday, December 12, 2023, 12:39: Visual inspection.
Source tray: OK. Minor cracks on insulator near the coil conductor. Small chip in the upper TBHT insulator as well.
Water blocks: No leaks. |
Thursday, January 18, 2024, 10:44, Aaron Schmidt, , , , , , , Done, Thermal tests 2
|
December 18 - January 15. Were not logged. Placed holder. Aurelia's tests. Included thermocouples in the oven & ionizer. |
Thursday, April 04, 2024, 10:38, Dave Neilson, , LP-SIS, , , 44691-8, 45235-26, Done, Mass marker testing
|
Thursday, April 04, 2024, 09:49: Target inserted yesterday, April 3. mass marker tube connections carefully confirmed. Vacuum roughed, turbo pumps
switched on at end of day. Water cooling turned on this morning.
Thursday, April 04, 2024, 09:52 : Vacuum at 6.4e-6. Not low enough to bypass lockout for TGHT TBHT ramp. |
Tuesday, July 23, 2024, 09:43, Dave Neilson, , LP-SIS, , , 44691-8, 45235-26, Done, mass marker - reservoir testing
|
Wednesday, July 22, 2024, 11:41 - target installed
Wednesday, July 22, 2024, 13:31 - pumping down
Wednesday, July 22, 2024, 14:21 - turbo pumps on |
Friday, September 06, 2024, 12:08, Dave Neilson, , , , , , , Done, Test Stand repair/update
|
Friday, September 06, 2024: New TSH:TGHT power supply has been installed and is now functional. Magna-Power TSD-900/208. The TSH:TBHT power supply
has also been cleaned, and the COIL power supply replaced with a duplicate that should function identically.
|
Tuesday, December 03, 2024, 14:55, Dave Neilson, , , , , , , Done, Power supply changed to CATHODE mode (-)
|
Tuesday, December 03, 2024, 14:55 ANODE/CATHODE power supply switched to cathode mode, NEGATIVE |
Tuesday, December 17, 2024, 16:09, Dave Neilson, , , , , , , Done, Anode,TGHT, TBHT power supply investigation. Resolved
|
Note, ground and HVC (high voltage common) are used interchangeably here.
|
Wednesday, June 29, 2011, 15:30, John Wong, , , , , , , , Testing Yield station elog
|
ABC 123 blah blah blah... |
Thursday, September 15, 2011, 09:20, Anders Mjos, , , , , , , , ISAC TestStand old e-log
|
link to old e-log |
Friday, September 23, 2011, 15:38, Rick Maharaj, , , , , , , , test stand vented
|
Test stand vented |
Wednesday, September 28, 2011, 14:11, Friedhelm Ames, SiC#26, , ITE, TM4, , , , gas system checked and pumped
|
The gas system has been checked. The variable valve opens at about 7.55 very fast. Please be careful when using it. Stepsize for opening around this
value should be 0.01. Gas lines have been pumped with pump in the high voltage rack. Ne leak was opened to release pressure. |
Thursday, October 13, 2011, 12:33, Rick Maharaj, Training , , , , , , , Test stand vented
|
test stand vented |
Tuesday, December 13, 2011, 14:10, Aurelia Laxdal, , , , , , , , Test Stand IOC reboot
|
Evgeniy rebooted the ISAC Test Stand IOC. Re-started EPICS at the Test Stand.
Found all 4 turbo pumps off and their backing valves closed. Re-started the pumps. |
Monday, December 19, 2011, 13:09, Aurelia Laxdal, , , , , , , , Test Stand updates
|
In January Controls will install a new firewall for ISAC Test Stand. Until then ISAC Test Stand can be used, but it may require an IOC reboot once in
while. |
Friday, January 20, 2012, 10:37, Friedhelm Ames, , , , , , , , vacuum pumps shut off
|
turbo pumps shut off due to work on cooling water system |
Tuesday, January 24, 2012, 09:44, Friedhelm Ames, , , , , , , , turbo pumps restarted
|
All turbo pumps have been restarted after cooling water is back and running.
|
|