Entry  Thursday, July 28, 2016, 08:21, Anders Mjos, , , , , , , Problems/Solutions, TMS:MB1 time out 
Fault report submitted. 9156
Thursday, July 28, 2016, 09:55: Controls group resolved the issue by cycling the power on the canbus controller
Entry  Thursday, July 28, 2016, 11:12, Aaron Schmidt, , , , , , , , Pump down empty chamber. 
Thursday, July 28, 2016, 10:00 Roughing.
Entry  Monday, August 08, 2016, 09:48, Aaron Schmidt, , , , , 41882-4, 41751-1, , HS Test Full Clean HS_41751-1_TEST.docxTS-2016-08-08-11-45.rga20160824_144103.jpg20160824_144106.jpg
Heat Shield Test (Fully Cleaned).
For all 6 tests:
-Start Turbo pumps & Ion gauge as soon as available on ISAC TEST STAND VACUUM Screen.
Entry  Wednesday, August 10, 2016, 08:09, Aaron Schmidt, , , , , 41882-4, 41751-2, , HS Test Full Clean HS_41751-2_TEST.docxTS-2016-08-10-11-45.rga20160824_143539.jpg
Heat Shield Test (Fully Cleaned).
For all 6 tests:
-Start Turbo pumps & Ion gauge as soon as available on ISAC TEST STAND VACUUM Screen.
Entry  Friday, August 12, 2016, 14:40, Aaron Schmidt, , , , , , , Problems/Solutions, Emittance scanner communications 
Wednesday, July 27, 2016, 16:06:  Spark around 15:10 or 16:05
Emittance rig communications affected.
Enter 100 on Dac -- Reads: -500
Entry  Monday, August 15, 2016, 08:09, Aaron Schmidt, , , , , 41882-4, 41751-4, , HS Test OR Clean HS_41751-4_TEST.docxTS-2016-08-15-11-45.rga20160824_143550.jpg
Heat Shield Test (OR Cleaned).
For all 6 tests:
-Start Turbo pumps & Ion gauge as soon as available on ISAC TEST STAND VACUUM Screen.
Entry  Wednesday, August 17, 2016, 08:19, Aaron Schmidt, , , , , 41882-4, 41751-5, , HS Test OR Clean HS_41751-5_TEST.docxTS-2016-08-17-11-45.rga20160824_143555.jpg20160824_143558.jpg
Heat Shield Test (OR Cleaned).
For all 6 tests:
-Start Turbo pumps & Ion gauge as soon as available on ISAC TEST STAND VACUUM Screen.
Entry  Monday, August 22, 2016, 08:20, Aaron Schmidt, , , , , 41882-4, 41751-3, , HS Test Full Clean HS_41751-3_TEST.docxTS-2016-08-22-11-50.rga20160824_143544.jpg
Heat Shield Test (Fully Cleaned).
For all 6 tests:
-Start Turbo pumps & Ion gauge as soon as available on ISAC TEST STAND VACUUM Screen.
Entry  Wednesday, August 24, 2016, 09:16, Aaron Schmidt, , , , , 41882-4, 41751-6, , HS Test OR Clean 7x
Heat Shield Test (OR only).
For all 6 tests:
-Start Turbo pumps & Ion gauge as soon as available on ISAC TEST STAND VACUUM Screen.
Entry  Monday, August 29, 2016, 10:08, Aaron Schmidt, , , , , , , , Pump down empty chamber. 
Monday, August 29, 2016, 10:07: Roughing.

Friday, September 02, 2016, 14:33: Venting
Entry  Wednesday, September 07, 2016, 15:50, Aaron Schmidt, , , , , , , Problems/Solutions, TSG:RP1 running uneven 
Fault report was submitted.
Anders informed Anthony on Tuesday, Sept 6, 2016.
Fault report # 9233.
Entry  Wednesday, September 07, 2016, 15:51, Aaron Schmidt, , , , , , , , Flexible waterlines test. Flexible_Line_Test.docxTS-2016-09-08-08-47.rga
Wednesday, September 07, 2016, 15:35: Roughing

Thursday, September 08, 2016, 08:33: Turbo pumps started.
Thursday, September 08, 2016, 08:38: Ion gauge on. TP1B @ speed 42 KRPM.
Entry  Thursday, September 08, 2016, 09:12, Anders Mjos, , , , , , , Problems/Solutions, Filament change on IG6 
Thursday, September 08, 2016, 08:20: Vacuum group changed to the other filament to investigate vacuum spikes on IG6
    Reply  Tuesday, September 13, 2016, 14:38, Anders Mjos, , , , , , , Problems/Solutions, TSG:RP1 replaced 


    
        
            Aaron Schmidt wrote:
        
        
            
            Fault report was submitted.
    Reply  Wednesday, September 14, 2016, 13:58, Anders Mjos, , , , , , , Problems/Solutions, TSG:RP1 latched breaker 


    
        
            Anders Mjos wrote:
        
        
            
            
            
              
Entry  Friday, September 30, 2016, 11:14, Aaron Schmidt, , , , , , , Problems/Solutions, TSG:RP1 Replacement 
Friday, September 30, 2016, 10:01: Roughing pump RP1 failed during roughing. Breaker was tripped to RP1 & RP2.

Friday, September 30, 2016, 10:30: Roughing
pump RP1 replaced and tested.
Entry  Tuesday, October 11, 2016, 14:55, Anders Mjos, , , , , , , In progress, Empty 
Breaker tripped during roughing. Removed exhaust line during first 2 min.
Tuesday, October 11, 2016, 14:55: Turbos at speed. Vacuum at 1.0E-6 T

Wednesday, October 12, 2016, 12:09: Ion gauge & Turbo pumps off.
Entry  Friday, October 14, 2016, 13:17, Anders Mjos, , , , , , , Problems/Solutions, Powerbump tripped off turbos 
Friday, October 14, 2016, 13:17: Restarted pumps
Friday, October 14, 2016, 13:4: Another trip: restarted pumps

Tuesday, October 18, 2016, 12:12: Venting.
Entry  Monday, October 24, 2016, 16:02, Aaron Schmidt, , , , , , , Problems/Solutions, Pump down empty chamber/Clean Exhaust/Test Exhaust_pump_down.docx
Monday, October 24, 2016, 15:45: Remove metal mesh covering roughing pump exhaust.
Clean out mesh (3/4"-5/8" thick w/ layers of dust/material).
Monday, October 24, 2016, 15:52: Roughing 710.0 T.
Entry  Wednesday, November 16, 2016, 10:50, Aaron Schmidt, , , , , , , , Pump down empty chamber. 
Wednesday, November 16, 2016, 10:50: Begin roughing.
Wednesday, November 16, 2016, 11:52: Turbo pumps on.
*Note* Unusual sound noticed right at the start up of TSG : TP1B. It was first noticed prior to venting UC#18. The sound only lasts 10-15 seconds