Entry  Thursday, May 09, 2013, 15:28, Anders Mjos, , , , , , , Problems/Solutions, TSGRP1 showing signs of reduced performance Archiver.PNG
TSG:CG1A and TSG:CG1B shows an increase in vacuum.
See attached archived data for details.
Entry  Wednesday, May 08, 2013, 08:52, Anders Mjos, , , , , , , Problems/Solutions, TMS and TPS P/S problems 
Wednesday, May 08, 2013, 08:52: TMS:CB5 found off this morning. Switched back on.
Wednesday, May 08, 2013, 12:14: Lost the following devices during a mass scan


Normal
0


Entry  Monday, March 25, 2013, 16:50, Sebastian Raeder, , , , , , , Problems/Solutions, RFQ powersupplies removed - Anode PS still connected to ground 
The powersupplies added to the teststand for operation of the IGLIS source have been removed from the HV cage as well as the RFQ driver.. The connections
of the 9PIN connector in the HV cage have been grounded and the wire used for an voltage offset of the source has been removed.
 
    Reply  Friday, May 03, 2013, 14:32, Anders Mjos, , , , , , , Problems/Solutions, Cathode PS cable reconnected ISK4523D-rev4.pdfISK4563D-rev3.pdf
 

    
        
            Sebastian Raeder wrote:
        
        
            
Entry  Thursday, April 25, 2013, 13:32, Anders Mjos, Empty, LP-FEBIAD, , , Tube Only, 38307-9 , In progress, FEBIAD Coil test 2014-04-30_FEBIAD_COIL_AWG18.PNG2014-05-01_FEBIAD_COIL_AWG18.PNGTarget_Assembly.pdf
Same target as in e-log entry https://elog.triumf.ca/TIS/Test-Stand/106
Thursday, April 25, 2013, 13:54: Roughing
Thursday, April 25, 2013, 14:25: Started turbos 
Entry  Wednesday, April 10, 2013, 12:14, Anders Mjos, Ta#40, HP-SIS, ITE, TM4, 38295-4, , Done, Conditioning Ta#40 
 Wednesday, April 10, 2013, 12:13: Stopped turbos in preparation for venting the chamber.
Wednesday, April 10, 2013, 13:05: Venting
Wednesday, April 10, 2013, 13:37: Ta#40 installed with 130 in lbs torque on all bolts.
    Reply  Thursday, April 18, 2013, 13:50, Anders Mjos, Ta#40, HP-SIS, ITE, TM4, 38295-4, , Done, Ta#40 stored under vacuum 
Target installed at the Test Stand after an inspection in the lab. EE was cleand. All bolts torqued to 130 in lbs
Thursday, April 18, 2013, 13:48: Rouging
Thursday, April 18, 2013, 14:11: Starting turbos
Entry  Tuesday, April 16, 2013, 08:59, Anders Mjos, , , , , , , Problems/Solutions, TMS:TP2 found in timeout / fault state TMS-TP2_Fault.pngTMS-IG6-RDVAC.png
Tuesday, April 16, 2013, 08:59
The turbo was found in fault state this morning. Based on data from IG6 the pump stopped around midnight.
An attempt to restart the pump will be made after the conditioning of Ta#40 is complete later today.
Entry  Tuesday, April 02, 2013, 15:19, Anders Mjos, , , , , , , Problems/Solutions, Water leak at MB1 Power Supply 
See Cyclotron e-fault 6637
 
    Reply  Tuesday, April 09, 2013, 16:21, Anders Mjos, , , , , , , Problems/Solutions, Water leak at MB1 Power Supply 
 

    
        
            Anders Mjos wrote:
        
        
            
       Reply  Thursday, April 11, 2013, 08:49, Anders Mjos, , , , , , , Problems/Solutions, MB1 Power Supply operational 
 

    
        
            Anders Mjos wrote:
        
        
            
Entry  Thursday, March 28, 2013, 13:55, Anders Mjos, Empty, , , , , , In progress, Pumping down empty chamber 
Thursday, March 28, 2013, 13:55: Roughing
Thursday, March 28, 2013, 14:36: Starting turbos (vacuum at ~0.100 T)
Thursday, March 28, 2013, 14:44: Both turbos at speed
Entry  Monday, March 25, 2013, 11:39, Anders Mjos, Ta#39, LP-SIS, ITW, TM1, , , Done, Ta#39 commissioning 
Target installed with 130 in lbs torque on all bolts.
Monday, March 25, 2013, 11:36: Roughing
Monday, March 25, 2013, 11:54: Starting turbos
Entry  Tuesday, March 19, 2013, 12:34, Anders Mjos, SiC#28, , ITE, TM4, , , Done, Installation of SiC#28 LP-RFQ grab.n5HwXJ.png20130321_heating_and_signal.PNG
Tuesday, March 19, 2013, 12:32 : Turbos off (vaccum at 2E-7 Torr)
Tuesday, March 19, 2013, 13:35: Venting
Target SiC#28 LP-RFQ inserted
    Reply  Thursday, March 21, 2013, 15:05, Sebastian Raeder, SiC#28, , ITE, TM4, , , Done, 2nd heating of SiC#28 LP-RFQ - short resolved 20130322_heating.png20130322_massscan_transmission.png20130322_massscan_suppression1.png20130322_suppression2.pnglegs.JPG
 

    
        
            
            Anders Mjos wrote:
Entry  Tuesday, March 19, 2013, 19:13, Sebastian Raeder, , , , , , , Problems/Solutions, 9 Pin connector rewired to match wiring in TM4 
The 9 Pin connector was rewired in the ISAC teststand to match the wiring in TM4
The wiring from the connection board in the HV cage to the connector (view from the target unit onto module) is now the following
      ---------------------------
Entry  Tuesday, March 19, 2013, 17:25, Sebastian Raeder, , , , , , , Problems/Solutions, new turbo installed 
Edi replaced the faulty turbo pump in the mass separator section.
Roughing and turbo started
vacuum @ 9E-7T after 2.5h
Entry  Tuesday, February 26, 2013, 08:32, Anders Mjos, , , , , , , Problems/Solutions, TMSTP2 timeout / fault Vacuum_2013-02-26.PNG
Tuesday, February 26, 2013, 08:24: Started turbo
Tuesday, February 26, 2013, 08:24: Turbo timed out
e-fault 6585 submitted
    Reply  Tuesday, March 19, 2013, 09:04, Anders Mjos, , , , , , , Problems/Solutions, Venting TMS section for replacement of TP2 by vacuum group 
 

    
        
            Anders Mjos wrote:
        
        
            
Entry  Monday, March 04, 2013, 09:11, Anders Mjos, , , , , , , Problems/Solutions, Restarted turobos after planned power outage 
Started archivers
Started turbos
Switched on ion gauges
Entry  Tuesday, February 19, 2013, 08:28, Anders Mjos, , , , , , , Problems/Solutions, Opened all backing valves after scheduled site wide air outage 
 
Entry  Monday, January 28, 2013, 14:41, Anders Mjos, Empty, , , , , , , Pumping down 
Monday, January 28, 2013, 14:41: Roughing
Monday, January 28, 2013, 15:35: Starting turbos
Monday, January 28, 2013, 15:43: Turbos at speed
Entry  Monday, January 28, 2013, 12:56, Anders Mjos, Empty, , , , , , , Venting 
 For conductor bolt work
Monday, January 28, 2013, 12:56: Turbos off
Monday, January 28, 2013, 14:18: Venting
Entry  Thursday, January 17, 2013, 08:16, Sebastian Raeder, RFQ empty, , , , , , In progress, heating 
Thursday, January 17, 2013, 08:16: started heating of the target, vacuum at 2.6E-7T
 Thursday, January 17, 2013, 14:55: current at 572A/6.95V (panel reading), vacuum at 6.7E-7T
Thursday, January 17, 2013, 18:40: measurements done, vacuum at 5.3E-7T, current 572V/6.94V, start cooling down
    Reply  Friday, January 18, 2013, 16:17, Anders Mjos, RFQ empty, , , , , , In progress, heating Test_Stand_cooling_temp_data_2013-01-16.pdfTest_Stand_strip_tool_TGHT_CUR_2013-01-16.PNG
 

    
        
            Sebastian Raeder wrote:
        
        
            
Entry  Friday, January 18, 2013, 15:57, Anders Mjos, , , , , , , Problems/Solutions, Conductor bolts to be replaced Model.jpgdamaged_bolt.JPG
After the last test at the test stand, one of the conductor bolts (ITD0058) is damaged. To prevent damage to the thread inserts, all conductor bolts
will be replaced with new ones.
Entry  Friday, January 18, 2013, 15:34, Anders Mjos, empty, , , , , , , Pumping down empty chamber 
Started roughing
Friday, January 18, 2013, 15:25: Started turbos
Friday, January 18, 2013, 15:33: Turbos at speed