Entry  Wednesday, May 24, 2017, 11:12, Anders Mjos, , , , , , , Problems/Solutions, FEBIAD Anode bias configuration 20170524-ST-currentvscoil-CHT300A.PNG
 The Test Stand has been configured for Anode bias. John Chow changed the power supply and the electrical connections have been wired according
to ISK4523D REV 6.
 
    Reply  Saturday, June 03, 2017, 09:34, Anders Mjos, , , , , , , Problems/Solutions, FEBIAD Cathode bias configuration 


    
        
            Anders Mjos wrote:
        
        
            
             The Test Stand has been configured for Anode bias. John Chow changed the power supply and the
Entry  Tuesday, June 06, 2017, 09:22, Aaron Schmidt, , , , , , , , Pump down empty chamber 
Tuesday, June 06, 2017, 09:21: roughing.

Friday, June 09, 2017, 08:50: Ion gauge off. Turbo pumps off.
Friday, June 09, 2017, 10:46: Venting.
Entry  Wednesday, June 07, 2017, 12:49, Aaron Schmidt, , , , , , , , Gas bottles 
 Gas bottles for FEBIAD testing were exchanged yesterday around 1:30. One Neon & one Argon bottle were removed.
Two Neon bottles were added.
Entry  Friday, June 16, 2017, 11:23, Aaron Schmidt, , , , , , , , Pump down empty chamber. 
Friday, June 16, 2017, 11:22: roughing.
Friday, June 16, 2017, 14:28: Turbo pumps on

Friday, June 30, 2017, 10:37: Ion gauge, turbos off.
Entry  Monday, July 17, 2017, 09:55, Aaron Schmidt, , , , , 41882-4, 42738-1, In progress, Out Gas HS for Target Cleaning Test OMEGA_OM-DAQPRO-5300_24-Jul-17_10.23.02.dlpTarget_Cleaning_Test_HS_Outgassing.docxTS-2017-07-17-11-17.rga
-No EE. Insulators, gripper arms, and blank EE plate included
-New grounded 9 pins included in brackets
-TGHT included to out gas Heat shield
Entry  Monday, July 17, 2017, 09:58, Aaron Schmidt, , HP-SIS, , , 42218-8, 42738-1, , Target cleaning test (Long) HP-SIS CC Clean  HP-SIS_CC_Clean_(Long).docxOMEGA_OM-DAQPRO-5300_27-Jul-17_10.25.04.dlpTS-2017-07-24-10-40.rga
 Target
Test (Fully Cleaned vs Crystal Clean only).
Entry  Monday, July 17, 2017, 10:04, Aaron Schmidt, , HP-SIS, , , 42218-10, 42738-1, , Target cleaning test HP-SIS Full Clean  HP-SIS_Full_Clean_(Short).docxTS-2017-07-27-10-40.rga
 Target
Test (Fully Cleaned vs Crystal Clean only).
Entry  Thursday, August 03, 2017, 17:00, Anders Mjos, , , , , , , Problems/Solutions, Vacuum system tripped on power interruption 
 Thursday, August 03, 2017, 17:00: Restarted TPs
Entry  Thursday, August 17, 2017, 12:45, Anders Mjos, , , , , , , Problems/Solutions, TBHT power supply removed  
 The Xantrex 10V 600 A power supply for the TBHT has been moved to ITE to replace the failed TGHT power supply
    Reply  Monday, August 21, 2017, 16:20, Anders Mjos, , , , , , , Problems/Solutions, TBHT power supply removed  


    
        
            Anders Mjos wrote:
        
        
            
             The Xantrex 10V 600 A power supply for the TBHT has been moved to ITE to replace the failed TGHT
Entry  Monday, September 25, 2017, 14:10, Aaron Schmidt, , , , , , , , Pump down empty chamber 
Monday, September 25, 2017, 14:10: Roughing.

Wednesday, September 27, 2017, 08:23: Turbo pumps on

Friday, October 06, 2017, 09:04: Ion gauge off. Turbos off.
Entry  Tuesday, October 10, 2017, 13:10, Aaron Schmidt, , , , , , , , Gas bottles 
Tuesday, October 10, 2017, 09:30:  Install/swap gas bottles. Elog.
Removed smallest Neon leak. Neon Bottle Serial #11231. Leak rate calibrated @ 1.59e-07 atm*CC/sec (02/09/2016)
In use:
Entry  Tuesday, October 10, 2017, 14:56, Aaron Schmidt, , , , , , , In progress, FEBIAD Anode bias configuration 
Unable to hold Anode voltage after power supply change out.
Tuesday, October 10, 2017, 14:55: The Test Stand has been configured for Anode bias and the electrical connections have been wired according  to ISK4523D
REV 6.
Entry  Monday, October 16, 2017, 11:46, Aaron Schmidt, , , , , , , In progress, Pump down empty chamber Test EE 
Monday, October 16, 2017, 11:45: Roughing.
Monday, October 16, 2017, 12:05: Turbo pumps started.
Monday, October 16, 2017, 12:10; Ion gauge on.
Entry  Tuesday, October 24, 2017, 11:38, Anders Mjos, , , , , , , , FEBIAD coil magnetic field measurment FEBIAD_Coil_Field_Measurement_2017-10-25.xlsx171025-First-Run.xlsx
with Fernando
Tuesday, October 24, 2017: Testing setup with triple coil
Wednesday, October 25, 2017: Field mapping at 70 A and current/field measurements on triple coil.
Entry  Monday, October 30, 2017, 08:54, Anders Mjos, , , , , , , Problems/Solutions, TMS:TP6 shut down due to high noise 
The turbo pump will need replacement.
Entry  Wednesday, November 15, 2017, 10:56, Aaron Schmidt, , , , , , , Problems/Solutions, TMS:TP6 replacement 
Turbo pump TP6 requires replacement.
Wednesday, November 15, 2017, 09:55: Turbo (TP2) off. Ion gauge off.
Wednesday, November 15, 2017, 10:55: Venting
Entry  Friday, December 01, 2017, 14:31, Aaron Schmidt, , LP-SIS, , , (Blank), 42752-3, In progress, Silver plated bolts test / Outgas TS 1st_silver_bolts_test.docxTS-2017-12-05-08-10.rga
Chamber 'open state, no turbos' 2 weeks. Testing Silver plated 3/8"-16x1" (SCR, SHC, 18-8, AG) bolt on the TBHT.
Friday, December 01, 2017, 14:26: Roughing. BV1B open.
Friday, December 01, 2017, 14:27: BV1A open
Entry  Monday, December 04, 2017, 08:29, Aaron Schmidt, , , , , , , Problems/Solutions, Power outage 20171205_103324.jpg
Power outage over the weekend. Reboot PLC and systems.
Monday, December 04, 2017, 08:22: Turbo pumps TMS:TP6 & TP2 Restarted.
Monday, December 04, 2017, 08:28: Time out on turbo pump TP1B.