420
|
Monday, January 05, 2015, 09:20 |
Anders Mjos | | | | | | | Problems/Solutions | IV4 did not get close signal before the Hollidays | The valve closes physically, but does not
receive the closed signal.
Cycled the valve multiple times before |
|
|
409
|
Monday, November 03, 2014, 14:50 |
Anders Mjos | | | | | | | Problems/Solutions | IV4 did not close until 4th attempt | Indicated with red valve on the EPICS vacuum
page |
|
|
764
|
Friday, October 25, 2019, 12:04 |
Anders Mjos | | | | | | | Problems/Solutions | ISG:TP1A found stopped | Restarted TP. Note that CG1A is above 50
mTorr. CG1B shows 15 mTorr |
|
|
53
|
Tuesday, March 06, 2012, 15:15 |
Pierre Bricault | | HP-SIS | | | | | | ISAC test stand two turbos replaced | Vac group has replaced the two turbo pumps. |
|
|
109
|
Thursday, June 28, 2012, 11:13 |
Pierre Bricault | | LP-FEBIAD | | | | | | ISAC test stand ready for cathode heating | The ISAC test stand is ready for cathode
heating.
Bias voltage: 30000 V |
|
|
54
|
Tuesday, March 06, 2012, 15:17 |
Pierre Bricault | | | | | | | | ISAC test stand | Start turbo pumps at 1514H |
|
|
55
|
Tuesday, March 06, 2012, 15:25 |
Pierre Bricault | | | | | | | | ISAC test stand | Turbos at full speed. P = 1.5E-05 T |
|
|
4
|
Thursday, September 15, 2011, 09:20 |
Anders Mjos | | | | | | | | ISAC TestStand old e-log | link
to old e-log |
|
|
435
|
Monday, April 13, 2015, 13:07 |
Anders Mjos | | | | | | | Problems/Solutions | ISAC Test Stand Optical elements power supply drop out | See e-fault 8027
Monday, April 13, 2015
Kevin and Graham are working on it |
|
|
731
|
Tuesday, June 11, 2019, 14:33 |
Aaron Schmidt | Test FEBIAD | LP-FEBIAD | | | 395530-3 | 42752-5 | In progress | ISAC Source tray re-installed w/ optics tray. | Tuesday, June 11, 2019, 14:33: Roughing.
Wednesday, June 12, 2019,
08:18: Venting to install FEBIAD. |
|
|
378
|
Thursday, May 15, 2014, 14:58 |
Anders Mjos | | | | | | | Problems/Solutions | IOC rebooted to recover from white-out. | Restarted archivers. |
|
|
483
|
Friday, December 18, 2015, 11:44 |
Anders Mjos | | | | | | | Problems/Solutions | IG6 not reading correctly | The new controller (XGS-600) installed
for IG6 use a different voltage to pressure
conversion than the previous models. This |
|
|
708
|
Thursday, January 24, 2019, 08:42 |
Aaron Schmidt | | | | | | | | IG6 fix (w/ instruction) | TMS:IG6 had continued communication errors
post power outage & would not switch
on. After a power loss, IG6 switches automatically |
|
|
475
|
Monday, October 19, 2015, 09:45 |
Anders Mjos | | | | | | | Problems/Solutions | IG1 filament dead | Will went chamber to replace the filament.
See e-fault 8501
Monday, October 19, 2015, 09:43: |
|
|
807
|
Tuesday, August 18, 2020, 10:00 |
Aaron Schmidt | | | | | | | | IDP15 Scroll pump installed - RP1 replaced | PN: X3815-64000
SN: MY2005SA02
Description: IDP15 Scroll pump, Std. |
|
|
702
|
Thursday, December 20, 2018, 13:55 |
Aaron Schmidt | | LP-FEBIAD | | | 395530-3 | 42752-5 | | Holiday shut down. | High winds caused a brief power outage
that completely shutoff the ISAC test stand.
Locked out the power. |
|
|
775
|
Friday, December 20, 2019, 07:59 |
Aaron Schmidt | | | | | | | | Holiday TS shut down | Friday, December 20, 2019, 07:58: Turn
off ion gauges. Shut off turbo pumps TP6,
TP2, TP1A, & TP1B. Close backing valves. |
|
|
618
|
Wednesday, December 20, 2017, 09:11 |
Aaron Schmidt | | LP-SIS | | | (Blank) | 42752-3 | Done | Holiday Shut Down | Power/sources already off. The water cooling
is currently left on.
Wednesday, December 20, 2017, 09:07: |
|
|
622
|
Friday, January 26, 2018, 11:10 |
Aaron Schmidt | | | | | | | Done | Helium tank replacement | Friday, January 26, 2018, 11:08: New Helium
tank installed inside the Test Stand.
-The 'Full' tag remains. The He tank |
|
|
245
|
Tuesday, December 11, 2012, 13:40 |
Sebastian Raeder | RFQ empty | | | | | | Done | Heating test for Ion guide Laser ion source | new ion guide laser ion source installed.
Pure target container without targetmaterial
and without surface ion source. |
|