  420   Monday, January 05, 2015, 09:20 Anders Mjos      Problems/SolutionsIV4 did not get close signal before the HollidaysThe valve closes physically, but does not
receive the closed signal.
Cycled the valve multiple times before
  
  409   Monday, November 03, 2014, 14:50 Anders Mjos      Problems/SolutionsIV4 did not close until 4th attemptIndicated with red valve on the EPICS vacuum
page
  
  764   Friday, October 25, 2019, 12:04 Anders Mjos      Problems/SolutionsISG:TP1A found stopped Restarted TP. Note that CG1A is above 50
mTorr. CG1B shows 15 mTorr
  
  53   Tuesday, March 06, 2012, 15:15 Pierre Bricault HP-SIS     ISAC test stand two turbos replacedVac group has replaced the two turbo pumps.   
  109   Thursday, June 28, 2012, 11:13 Pierre Bricault LP-FEBIAD     ISAC test stand ready for cathode heatingThe ISAC test stand is ready for cathode
heating.
Bias voltage: 30000 V
  
  54   Tuesday, March 06, 2012, 15:17 Pierre Bricault       ISAC test standStart turbo pumps at 1514H   
  55   Tuesday, March 06, 2012, 15:25 Pierre Bricault       ISAC test standTurbos at full speed. P = 1.5E-05 T   
  4   Thursday, September 15, 2011, 09:20 Anders Mjos       ISAC TestStand old e-loglink
to old e-log
  
  435   Monday, April 13, 2015, 13:07 Anders Mjos      Problems/SolutionsISAC Test Stand Optical elements power supply drop out See e-fault 8027 
Monday, April 13, 2015
Kevin and Graham are working on it
  
  731   Tuesday, June 11, 2019, 14:33 Aaron SchmidtTest FEBIADLP-FEBIAD  395530-342752-5In progressISAC Source tray re-installed w/ optics tray.Tuesday, June 11, 2019, 14:33: Roughing.

Wednesday, June 12, 2019,
08:18: Venting to install FEBIAD.
  
  378   Thursday, May 15, 2014, 14:58 Anders Mjos      Problems/SolutionsIOC rebooted to recover from white-out.Restarted archivers.   
  483   Friday, December 18, 2015, 11:44 Anders Mjos      Problems/SolutionsIG6 not reading correctlyThe new controller (XGS-600) installed
for IG6 use a different voltage to pressure
conversion than the previous models. This
  
  708   Thursday, January 24, 2019, 08:42 Aaron Schmidt       IG6 fix (w/ instruction)TMS:IG6 had continued communication errors
post power outage & would not switch
on. After a power loss, IG6 switches automatically
  
  475   Monday, October 19, 2015, 09:45 Anders Mjos      Problems/SolutionsIG1 filament deadWill went chamber to replace the filament.
See e-fault 8501 
Monday, October 19, 2015, 09:43:
  
  807   Tuesday, August 18, 2020, 10:00 Aaron Schmidt       IDP15 Scroll pump installed - RP1 replacedPN: X3815-64000
SN: MY2005SA02
Description: IDP15 Scroll pump, Std.
  
  702   Thursday, December 20, 2018, 13:55 Aaron Schmidt LP-FEBIAD  395530-342752-5 Holiday shut down.High winds caused a brief power outage
that completely shutoff the ISAC test stand.
Locked out the power.
  
  775   Friday, December 20, 2019, 07:59 Aaron Schmidt       Holiday TS shut downFriday, December 20, 2019, 07:58: Turn
off ion gauges. Shut off turbo pumps TP6,
TP2, TP1A, & TP1B. Close backing valves.
  
  618   Wednesday, December 20, 2017, 09:11 Aaron Schmidt LP-SIS  (Blank)42752-3DoneHoliday Shut DownPower/sources already off. The water cooling
is currently left on.
Wednesday, December 20, 2017, 09:07:
  
  622   Friday, January 26, 2018, 11:10 Aaron Schmidt      DoneHelium tank replacementFriday, January 26, 2018, 11:08: New Helium
tank installed inside the Test Stand.
-The 'Full' tag remains. The He tank
  
  245   Tuesday, December 11, 2012, 13:40 Sebastian RaederRFQ empty     DoneHeating test for Ion guide Laser ion sourcenew ion guide laser ion source installed.
Pure target container without targetmaterial
and without surface ion source.
 heatint_rfq_dec11_2012.PNGheatint_rfq_dec12_2012.PNG 