Entry  Monday, January 05, 2015, 09:20, Anders Mjos, , , , , , , Problems/Solutions, IV4 did not get close signal before the Hollidays 

The valve closes physically, but does not receive the closed signal.

Cycled the valve multiple times before finally showing closed state.

Entry  Monday, November 03, 2014, 14:50, Anders Mjos, , , , , , , Problems/Solutions, IV4 did not close until 4th attempt 

Indicated with red valve on the EPICS vacuum page

Entry  Friday, October 25, 2019, 12:04, Anders Mjos, , , , , , , Problems/Solutions, ISG:TP1A found stopped  

Restarted TP. Note that CG1A is above 50 mTorr. CG1B shows 15 mTorr

Entry  Tuesday, March 06, 2012, 15:15, Pierre Bricault, , HP-SIS, , , , , , ISAC test stand two turbos replaced 

Vac group has replaced the two turbo pumps.

Entry  Thursday, June 28, 2012, 11:13, Pierre Bricault, , LP-FEBIAD, , , , , , ISAC test stand ready for cathode heating 

The ISAC test stand is ready for cathode heating.

Bias voltage: 30000 V

Bias current: 37 microAmp

Anode bias: 200 V

Anode current: 6.105 mA

Cathode current: 0 Amp

Cathode voltage: 0 V

Coil current: 30 A

Coil Voltage 0.2 V

EE Voltage: 1800 V

EE current: 30 microAmp

Einzel Lens voltage: 14000 V

Einzel lens current: 49 microAmp.

Entry  Tuesday, March 06, 2012, 15:17, Pierre Bricault, , , , , , , , ISAC test stand 

Start turbo pumps at 1514H

Entry  Tuesday, March 06, 2012, 15:25, Pierre Bricault, , , , , , , , ISAC test stand 

Turbos at full speed. P = 1.5E-05 T

Entry  Thursday, September 15, 2011, 09:20, Anders Mjos, , , , , , , , ISAC TestStand old e-log 

link to old e-log

Entry  Monday, April 13, 2015, 13:07, Anders Mjos, , , , , , , Problems/Solutions, ISAC Test Stand Optical elements power supply drop out 

 See e-fault 8027 

Monday, April 13, 2015
Kevin and Graham are working on it

 

 

 

 

Entry  Tuesday, June 11, 2019, 14:33, Aaron Schmidt, Test FEBIAD, LP-FEBIAD, , , 395530-3, 42752-5, In progress, ISAC Source tray re-installed w/ optics tray. 

Tuesday, June 11, 2019, 14:33: Roughing.


Wednesday, June 12, 2019, 08:18: Venting to install FEBIAD.

Wednesday, June 12, 2019, 09:13: LP-FEBIAD installed. Roughing.

Wednesday, June 12, 2019, 11:13: Turbo pumps on.

Wednesday, June 12, 2019, 11:21: Ion gauge on. 

Wednesday, June 12, 2019, 11:48: RGA re-connected & switched on.


Thursday, June 13, 2019, 10:27:

He Leak TEST:

Vacuum Group Leak detector LD#4.

Thursday, June 13, 2019, 10:28: Vacuum @ 1.60e-06T

LD Base line before opening valve to turbo pumps: 0.0e-09 atm-cc/sec

Thursday, June 13, 2019, 10:35: LD baseline after opening valve to turbo pumps: 1.2e-09 atm-cc/sec

Full open base:

Vacuum @ 1.60e-06T. RGA status:

Water: 2.20e-006

He: 4.55e-010

LD:  1.2e-09 atm-cc/sec

Thursday, June 13, 2019, 10:35:

Open line FS#2 . Pressurize to 30 PSI. Record after 5 minutes

Thursday, June 13, 2019, 10:40 Vacuum @ 1.54e-06T . RGA status:

Water: 2.20e-006

He: 4.20e-010

LD: 0.1e-09 atm-cc/sec. Purge and close FS#2.

Thursday, June 13, 2019, 10:45: Open line FS#3 . Pressurize to 30 PSI. Record after 5 minutes

Thursday, June 13, 2019, 10:50: Vacuum @ 1.52e-06T. RGA status:

Water: 2.18e-006

He: 3.68e-010

LD: 0.7e-09 atm-cc/sec. Purge and close FS#3.

Thursday, June 13, 2019, 10:50: Open line FS#4 . Pressurize to 30 PSI. Record after 5 minutes

Thursday, June 13, 2019, 10:55: Vacuum @ 1.54e-06T. RGA status:

Water: 2.16e-006

He: 9.24e-011

*LD: 3.7e-09 atm-cc/sec. Run for another 5 minutes.

Thursday, June 13, 2019, 11:00: Vacuum @ 1.52e-06T. RGA status:

Water: 2.15e-006

He: 2.06e-010

*LD: 0.7e-08 atm-cc/sec. Potential He escaping through o-rings*

Purge and close FS#4.

Thursday, June 13, 2019, 11:01: Open line FS#5 . Pressurize to 30 PSI. Record after 5 minutes

Thursday, June 13, 2019, 11:06: Vacuum @ 1.52e-06T. RGA status:

Water: 2.13e-006

He: 2.75e-010

LD: 1.7e-08 atm-cc/sec. Purge and close FS#5

Thursday, June 13, 2019, 11:07: Depressurize lines. Connect HPA & Purge all lines. 

Thursday, June 13, 2019, 11:12: Vacuum @ 1.54e-06T . RGA status:

Water: 2.12e-006

He: 6.21e-010

LD: 3.3e-08 atm-cc/sec

Close Valve & disconnect LD. HE LEAK TEST COMPLETE


Thursday, June 13, 2019, 11:20: Vacuum @1.52e-06T :Begin gradually opening the waterlines.

Thursday, June 13, 2019, 11:22: Open FS#2. Vacuum @ 1.52e-06T. No Response on RGA.

Thursday, June 13, 2019, 11:23: Open FS#3. Vacuum @ 1.52e-06T. No Response on RGA.

Thursday, June 13, 2019, 11:23: Open FS#4. Vacuum @ 1.52e-06T. No Response on RGA.

Thursday, June 13, 2019, 11:24: Open FS#5. Vacuum @ 1.52e-06T. No Response on RGA.

Thursday, June 13, 2019, 11:28: Power sources: Tested. TGHT PS is still a no go. Power switched off, lock out.

Thursday, June 13, 2019, 14:03: New TGHT PS installed.

Thursday, June 13, 2019, 14:06: Power / sources on.

Thursday, June 13, 2019, 14:20: BIAS / EE / EZL @ 30 / -1.5 / 13 kV. EZL current @ 61 uA. EZL appears to be fixed. :)

Thursday, June 13, 2019, 14:21: Spark*

Thursday, June 13, 2019, 14:29: Sources to 0 kV. FS#8 needs re-connection.

Thursday, June 13, 2019, 14:43: FS#8 connected. Vacuum ok @ 1.52e-06T. No response on RGA.

Thursday, June 13, 2019, 14:45: Auto-ramping TGHT / TBHT to 300 / 150 A @ 2 A per min.


Friday, June 14, 2019, 06:52: Restart RGA.

Friday, June 14, 2019, 08:37: Run mini pump to prep gas-lines.

Friday, June 14, 2019, 08:44: Close SV1, manual valve & turn off mini pump. Gradually open gas lines.

Friday, June 14, 2019, 08:48: Gas lines fully opened.

Friday, June 14, 2019, 08:49: Auto-ramping TGHT / TBHT to 570 / 270 A @ 2 A per min.

Friday, June 14, 2019, 08:52: HV sources ready.

FM

Friday, June 14, 2019, 11:11: Anode current @ 0V 7.326mA. Setting Anode to 150 V.

AS

Friday, June 14, 2019, 11:16: Auto-ramping TGHT / TBHT to 580 / 290 A @ 2 A per min.

Friday, June 14, 2019, 11:18: Optics set.

Friday, June 14, 2019, 11:29: BIAS / EE / EZL @ 30 / -1.5 / 13 kV. One spark while bring the BIAS to 30 kv around 27.5 kV. IV4 opened.

Friday, June 14, 2019, 14:39: Multiple wire scans attempted since 1pm. Controls & Diagnostics contacted. Ongoing troubleshooting.


Monday, June 17, 2019, 08:34: TMS:MB1 - Reset. 

Monday, June 17, 2019, 09:18: Auto-ramping TBHT to 310 A @ 2 A per min.

FM

Monday, June 17, 2019, 10:30: TBHT manually tapped to 320 A  ~2A/min


Tuesday, June 18, 2019, 18:42 : BIAS / EZL / EE @ 0 kV. Anode @ 0 V.

Tuesday, June 18, 2019, 18:43: Begin auto-cooling @ 2A per min.


AS

Wednesday, June 19, 2019, 07:10: IV4 Closed.

Wednesday, June 19, 2019, 07:12: Gas lines & Sources / power off.

Wednesday, June 19, 2019, 07:15: RGA off.

Wednesday, June 19, 2019, 07:16: IG1 & Turbo pumps off.

Wednesday, June 19, 2019, 08:35: Purging / venting.

Entry  Thursday, May 15, 2014, 14:58, Anders Mjos, , , , , , , Problems/Solutions, IOC rebooted to recover from white-out. 

Restarted archivers.

Entry  Friday, December 18, 2015, 11:44, Anders Mjos, , , , , , , Problems/Solutions, IG6 not reading correctly 

The new controller (XGS-600) installed for IG6 use a different voltage to pressure conversion than the previous models. This causes a discrepancy between values in EPICS and the value displayed on the controller. An e-fault has been submitted.

Friday, December 18, 2015, 14:40: EPICS updated and restarted.

Entry  Thursday, January 24, 2019, 08:42, Aaron Schmidt, , , , , , , , IG6 fix (w/ instruction) 

TMS:IG6 had continued communication errors post power outage & would not switch on. After a power loss, IG6 switches automatically to Filament 1. Filament 1 is burnt out.

Thursday, January 24, 2019, 08:14: TMS:IG6 fixed. Switched from Filament 1 to Filament 2. FIL2 runs ok.

Instructions from Edi:

-Using the + / - keys move the cursor on the control box to select FIL2. The control box is located above the beam line turbo pump control boxes / inside the black cabinets under the TS.

-Press ok to switch FL2 : ON

-Turn IG6 on with the computer (EPICS) before it times out.

-Now IG6 is connected and can be switched on / off from the computer.

Entry  Monday, October 19, 2015, 09:45, Anders Mjos, , , , , , , Problems/Solutions, IG1 filament dead 

Will went chamber to replace the filament.

See e-fault 8501 

Monday, October 19, 2015, 09:43: turbos stopped

Monday, October 19, 2015, 10:19: Venting

Monday, October 19, 2015, 15:36: Gauge replaced by Anthony.

Monday, October 19, 2015, 15:36: Roughing

Monday, October 19, 2015, 16:05: Turbos started

Monday, October 19, 2015, 16:13: Turbos at speed. Vacuum does not display correct value (1E-11 T)


Tuesday, October 20, 2015, 08:14: Switched on controller. Gauge seem to operate fine.

Entry  Tuesday, August 18, 2020, 10:00, Aaron Schmidt, , , , , , , , IDP15 Scroll pump installed - RP1 replaced 

PN: X3815-64000

SN: MY2005SA02

Description: IDP15 Scroll pump, Std.

Removed old Tri-Scroll, Check voltage setting. set to 115V.

Tuesday, August 18, 2020, 09:57: Installed & check. Roughing line to PV1

Tuesday, August 18, 2020, 10:04: Connection ok. Await chamber close after.

Tuesday, August 18, 2020, 13:30: Disengage shipping locks*

Entry  Thursday, December 20, 2018, 13:55, Aaron Schmidt, , LP-FEBIAD, , , 395530-3, 42752-5, , Holiday shut down. 

High winds caused a brief power outage that completely shutoff the ISAC test stand.

Locked out the power.

RGA checked & shutoff complete

Epics failure, computer restarted.

Thursday, December 20, 2018, 13:52: Shutting ISAC test stand down for the holidays. Checking Epics & operation first.

Thursday, December 20, 2018, 13:55: Roughing pump operating. Turbos left off. Backing valves opened. Epics whiteout on TS sources & optics.

TBHT, TGHT, Anode all brought to zero on epics, although still mostly white out.

Thursday, December 20, 2018, 14:14: Waterlines shut off at the main source & the TS is purged.

Note* Small leak directly on the fittings noticed on FS#5 right after the flow meter paddle wheel on the supply end.  All water flow was briefly halted during the power bump.

Epics still whited out.


Monday, January 07, 2019, 11:13: Fault report 11981 submitted.

Entry  Friday, December 20, 2019, 07:59, Aaron Schmidt, , , , , , , , Holiday TS shut down 

Friday, December 20, 2019, 07:58: Turn off ion gauges. Shut off turbo pumps TP6, TP2, TP1A, & TP1B. Close backing valves.

Friday, December 20, 2019, 08:06: PV1 & PV2 off. RP1 & RP2 off.


Monday, January 06, 2020, 09:35: Restarting TS. RP1 & RP2 on. (BIAS PS upgraded / Note: https://elog.triumf.ca/TIS/Test-Stand/776 ). No HV as yet.

Monday, January 06, 2020, 09:37: Turbo pumps (TP6, TP2, TP1A, & TP1B) on.

Monday, January 06, 2020, 09:42: Ion gauges on (IG1 & IG6).


Monday, January 20, 2020, 08:17: Ion gauge. Turbos pumps off.

Monday, January 20, 2020, 10:26: Venting.

Entry  Wednesday, December 20, 2017, 09:11, Aaron Schmidt, , LP-SIS, , , (Blank), 42752-3, Done, Holiday Shut Down 

Power/sources already off. The water cooling is currently left on.

Wednesday, December 20, 2017, 09:07: RGA off.

Wednesday, December 20, 2017, 09:08: Both Ion gauges and all 4 turbo pumps off.

Wednesday, December 20, 2017, 11:21: Valves closed. Roughing pumps off.

Wednesday, December 20, 2017, 11:22: RGA shut off completely.

Entry  Friday, January 26, 2018, 11:10, Aaron Schmidt, , , , , , , Done, Helium tank replacement 

Friday, January 26, 2018, 11:08: New Helium tank installed inside the Test Stand.

-The 'Full' tag remains. The He tank was not opened.

-The old tank was placed beside the Test Stand beneath/beside the power switch.

Entry  Tuesday, December 11, 2012, 13:40, Sebastian Raeder, RFQ empty, , , , , , Done, Heating test for Ion guide Laser ion source heatint_rfq_dec11_2012.PNGheatint_rfq_dec12_2012.PNG

new ion guide laser ion source installed. Pure target container without targetmaterial and without surface ion source.

Heat up to 580A for heat test of all components. Distance between target and repeller < 1mm

 

13:15 start heating TGHT, 1A per 30sec vacuum below 2E-7T

14:50 reached 200A at TGHT (1.5V readback same as frontpanel), vacuum now 2.9E-7T, proceed on to 400A

16:10 TGHT 350 A (setpoint, readback stopped at 269A) and 3.4V readback, sudden increase in vacuum from 4E-7T to 5.5E-7T and larger fluctuations, give it 10min

16:22 vacuum back to 4.4E-7T but some occasional vacuum spikes , proceed to 400A

17:00 at 400A / 4.13V, vacuum hit 2E-6T in between which delayed the heating, now decreasing, will goto 410A for half an hour and then 385A over night

Dec 12th

8:30 3.3E-7T Vac at 385A, goto 420A

8:50 7.5E-7T Vac at 420A, goto 450A

9:20 1.7E-6T Vac at 450A, goto 470A

10:00 1.5E-6T Vac at 470A / 4.5V

11:30 1.1E-6T at 520A/4.56V

Wednesday, December 12, 2012, 11:46   1.7E-6T at 550A/4.58V

Wednesday, December 12, 2012, 14:31 

     580A reached,  Vacuum dropped from 1.8E-6T to 5.8E-7T in 2h

     voltage read back is wrong as well Panel readings are 572A/6.99V (read back values in EPICS are 248A/ 4.6V) 

Wednesday, December 12, 2012, 14:47 6.5E-7T at 592A/ 7.31V (Panel readings)

Wednesday, December 12, 2012, 15:01 there is no contact of the target to HV GND (especially the repeller), the target can still be biased to 5V

Wednesday, December 12, 2012, 19:48     5.9E-7Tvacuum is slowly going down now

Thursday, December 13, 2012, 00:23   5.5E-7T, start cooling down

 

Short summary on results of first heating teest with the Ion Guide Ion source:

 

The Ion source is still in good shape, nothing was effected by the heat. Just some deposition in the repellers and the exit electrode

The capton wires used for  wiring the electrodes had some problem with heat and went black and got brittle - for the next test we will ad a Ta schield at the side of the source to prevent radiation inside the source.

ELOG V2.9.2-2455