Entry  Friday, August 01, 2014, 08:39, Anders Mjos, , , , , , , Problems/Solutions, TMS:RP2 noisy 
Friday, August 01, 2014, 08:39: Backing pressure 0 / 11 mT
Entry  Tuesday, August 12, 2014, 09:52, Anders Mjos, , , , , , , Problems/Solutions, RTD installed on Supply water 2014-08-12_Dataq_Screen_Shot.pngDataq_Supply_Temperature_calibration_2014-08-20.docx
Travis assisted in installing a temperature reading RTD from Omega (SA1-RTD-MTP) on the water supply. The RTD has been installed with a 503 Ohm resistor
=> 0V = -175.75 C, 10V = 205.71 C. The RTD has been connected to Ch 9 on the data logger.
Offset calibration data towards the SUPPLY temperature reading is attached.
Entry  Thursday, August 14, 2014, 08:45, Anders Mjos, , , , , , , Problems/Solutions, FC0 reading full current FC0FullScaleReading_2014-08-14.pngFC0FullScaleReading_EPICS_2014-08-14.png
since yesterday around 19h. See attached screen shot of archived data
Thursday, August 14, 2014, 08:40: Rebooted IOC. Still reading full scale only. FC0 reads full scale with signal cable removed.
e-fault 7545
Entry  Wednesday, August 20, 2014, 16:25, Anders Mjos, , , , , , , Problems/Solutions, Lost power on TGHT, TBHT and EE simultaniously  
Possible controls problem. Breaker 18 found latched. Can not be re-energized. Burnt smell in PLC / HV area. e-faut 7561

Thursday, August 21, 2014: Dave Morris had a look and was able to isolate the problem to be with one of the low voltage power supplies
in the PLC panel.
Entry  Wednesday, August 27, 2014, 12:55, Anders Mjos, , , , , , , Problems/Solutions, Water leak on MB1 
e-faulted by operations Aug 26th
Entry  Monday, September 08, 2014, 16:23, Anders Mjos, UC#11, , , TM4, 40282-5, , Done, UC#11 Heat Shield Conditioning Thermocouples.xlsx
T/C installed
CH 1: Attached to TGHT outside middle
CH 2: Through HS outside TGHT right
Entry  Thursday, September 25, 2014, 15:44, Anders Mjos, ThO#1, , ITW, TM1, 40282-5, , Done, ThO#1 Heat Shield Conditioning 
Thursday, September 25, 2014, 15:44: Roughing
Thursday, September 25, 2014, 16:06: Starting turbos
Thursday, September 25, 2014, 16:14: Turbos at speed.
Entry  Tuesday, October 07, 2014, 09:32, Anders Mjos, , , , , , , In progress, Pumping down empty chamber 
Tuesday, October 07, 2014, 09:30: Roughing
Tuesday, October 07, 2014, 10:24: Starting turbos
Tuesday, October 07, 2014, 10:32 : Turbos at speed. Vacuum at 3.3E-5 T
Entry  Monday, October 20, 2014, 09:17, Anders Mjos, , , , , , , Problems/Solutions, Power bump this weekend tripped off all turbo pumps 
 Monday, October 20, 2014, 09:17: Roughing
Monday, October 20, 2014, 09:18 : Turbos started
Monday, October 20, 2014, 09:29 : All turbos at speed
Entry  Monday, October 27, 2014, 09:26, Anders Mjos, , , , , , , Problems/Solutions, TSG:TP1B noisy 
e-fault 7748
Monday, October 27, 2014, 09:21: Switched off turbos

Friday, October 31, 2014, 10:43 : Venting
Entry  Monday, November 03, 2014, 14:50, Anders Mjos, , , , , , , Problems/Solutions, IV4 did not close until 4th attempt 
Indicated with red valve on the EPICS vacuum page
Entry  Monday, November 24, 2014, 08:41, Anders Mjos, , , , , , , Problems/Solutions, TSG:RP1 replaced 
 by Edi on Friday Nov 11th
Entry  Friday, December 12, 2014, 13:11, Anders Mjos, , , , , , , Problems/Solutions, HV inspection and cleaning 
by Ray D and Anders in preparation for 60kV test. Rack insulators and f/t insulators cleaned with windex
Entry  Friday, December 12, 2014, 13:11, Anders Mjos, , , , , , , Problems/Solutions, HV inspection and cleaning 
by Ray D and Anders in preparation for 60kV test. Rack insulators and f/t insulators cleaned with windex
Entry  Friday, December 12, 2014, 14:09, Anders Mjos, , LP-FEBIAD, , , Tube only, , In progress, HV BIAS Test 2014-12-17_60_kV_3h.png60_kV_Test.docx
BIAS current limit pot changed from 2.40 to 0.25
EZL current limit pot changed from 0.50 to 0.20
Testing max HV bias with Ray
Entry  Tuesday, December 16, 2014, 10:18, Anders Mjos, , , , , , , Problems/Solutions, TP1B and TP6 stopped/fault 
possibly due to HV spark
Tuesday, December 16, 2014, 10:24: Starting TP1B and TP6
Tuesday, December 16, 2014, 10:26: Both turbos at speed. Power 15 W and 17 W.
Entry  Thursday, December 18, 2014, 14:34, Anders Mjos, , , , , , , Problems/Solutions, GE cooling water lines disconnected 
 In preparation for leak check
Thursday, December 18, 2014, 16:37: Reconnected after leak check
Monday, December 22, 2014, 11:02: Water opened.
Entry  Thursday, December 18, 2014, 16:38, Anders Mjos, , , , , , , Problems/Solutions, Leak found on service cap F/T Q 9 pin connector Spark_marks_on_insulator.jpgSpark_marks_on_insulator2.jpg
Largest response on the bottom of the insulator.
Thursday, December 18, 2014, 16:39: Closing pumping valves. Will allow system to leak up over night

Friday, December 19, 2014, 08:19: Venting
Entry  Monday, December 22, 2014, 11:06, Anders Mjos, , , , , , , Problems/Solutions, Copper rod removed 
A copper rod - not used was removed from one of the cooling lines.
Entry  Tuesday, December 23, 2014, 09:08, Anders Mjos, , , , , , , , Water closed for Christmas 
Shutting of water supply to the source box. Water not needed.