Entry  Monday, June 15, 2015, 14:09, Anders Mjos, ZrC#7, LP-SIS, , TM2, 41177-1, , In progress, ZrC#7 Conditioning ZrC#7.docxER580-220-30kV-m39-off30.txt

Monday, June 15, 2015, 14:05 Roughing

Monday, June 15, 2015, 14:39: Turbos started.

Monday, June 15, 2015, 14:49: Turbos at speed. Vacuum at 5.3E-5 T


Tuesday, June 16, 2015, 10:14: Water lines leak checked and water opened.


TBHT p/s did not come on yesterday after PLC upgrade. Solved this morning by Dave M.

Wednesday, June 17, 2015, 09:56: BIAS/EZL/EE to 20 / 10 / 1 kV

Wednesday, June 17, 2015, 09:58: Atuo-ramping to 500 / 170 A at 2/1 A/min. Good/Bad Vac 4E-6 / 6E-6 T

Wednesday, June 17, 2015, 23:11 : Stopped auto-ramping at 342 / 170 A. Vacuum at 4E-6 T


Thursday, June 18, 2015, 08:59: Resuming auto-ramping. Vacuum at 3.3E-6 T

Thursday, June 18, 2015, 11:25: Good/Bad Vac 6E-6 / 8E-6 T.

Thursday, June 18, 2015, 14:59: TBHT to 180 A. BIAS/EZL/EE to 30 / 14 / 1.5 kV


Friday, June 19, 2015, 08:21: Ramping TBHT to 200 A

Friday, June 19, 2015, 08:40: EZL 13.4 kV

Friday, June 19, 2015, 11:30: Atuo-ramping to 580 A

Friday, June 19, 2015, 11:48: Stopped auto-ramping at 540 A. 8.4 V

Friday, June 19, 2015, 13:30: TGHT / TBHT at 580 / 220 A

Friday, June 19, 2015, 16:12: Cool down started. at 4 / 2 A/min

Friday, June 19, 2015, 17:57: BIAS / EZL / EE off

Friday, June 19, 2015, 17:57: Closed IV4. Timed out.


Monday, June 22, 2015, 08:57 : Stopped turbos

Monday, June 22, 2015, 13:02: Venting. Had to bypass interlocks as IV4 is timed out.

Entry  Monday, June 22, 2015, 15:49, Anders Mjos, , , , , , , In progress, Installed new 9-pin feed through 9-pin_feed_through.jpg

No wires connected yet.

Monday, June 22, 2015, 15:48: Roughing


Tuesday, June 23, 2015, 09:05: Roughing vacuum does not go below 0.9 T. Venting to investigate.

Tuesday, June 23, 2015, 10:16: Turbos started at 0.9 T

Tuesday, June 23, 2015, 10:276: Turbos at speed. Vacuum at 7.5E-4 T

Tuesday, June 23, 2015, 10:32: Stopped turbos

Tuesday, June 23, 2015, 11:01: Venting

Tuesday, June 23, 2015, 11:22: Roughing

Tuesday, June 23, 2015, 13:37: Venting

Tuesday, June 23, 2015, 16:48: Leak found on the newly installed f/t.


Wednesday, June 24, 2015, 09:29: Venting

Replaced f/t with a blank off.Installed TM2 FEBIAD test target

Wednesday, June 24, 2015, 10:31: Roughing

Wednesday, June 24, 2015, 11:07: Started turbos.

Wednesday, June 24, 2015, 11:17: Turbos at speed. Vacuum at 3.3E-5 T


Thursday, July 09, 2015

Installed the fixed f/t.

Entry  Thursday, June 25, 2015, 09:00, Anders Mjos, , LP-FEBIAD, , TM2, , , , TM2 FEBIAD Test 

Thursday, June 25, 2015, 09:00: Water on HS. No vacuum response.

Thursday, June 25, 2015, 11:48: Started auto ramping heaters.

Thursday, June 25, 2015, 17:14: Target at 580/275 A. BIAS/EZL/EE at 30 / 13.5 / 1.5 kV


Friday, June 26, 2015, 08:04: Stopped TP1B for outgasing measurements

Friday, June 26, 2015, 10:25: Performing outgasing measurements

Friday, June 26, 2015, 10:35: Starting TP1B.

Friday, June 26, 2015, 10:39: TP1B at speed.

Friday, June 26, 2015, 11:12: Started cool-down.

Friday, June 26, 2015, 11:47: BIAS/EZL/EE/COIL/ANODE off

Friday, June 26, 2015, 11:47: Closed IV4


Tuesday, June 30, 2015, 13:32: Venting

Entry  Tuesday, June 30, 2015, 14:51, Anders Mjos, ZrC#7, LP-SIS, , TM2, 41177-2, , In progress, ZrC#7 Conditioning 2 ZrC#7_Second_Time.docxTGT2-ER580-200-30kV-m39-off60-3.txt

Tuesday, June 30, 2015, 14:51: Roughing

Tuesday, June 30, 2015, 16:14: Started turbos. CG1 at 0.075 T

Tuesday, June 30, 2015, 16:23 : Turbos at speed. Vacuum at 1.4E-5 T


Thursday, July 02, 2015, 09:05: RGA on. Opened water for HS line. Vacuum stable at 4.6E-7 T. No response on RGA

Thursday, July 02, 2015, 09:06: IV4 opened

Thursday, July 02, 2015, 09:08: Staring auto-ramping heaters to TGHT / TBHT 300 A / 100 A at 2 / 1 A/min

Thursday, July 02, 2015, 11:22 : BIAS/EZL/EE to 20 / 10  1.5 kV

Thursday, July 02, 2015, 11:46: Continue heating to 400 / 150 A

Thursday, July 02, 2015, 13:48 : BIAS/EZL to 30 / 13 kV. Heating continued from 13:05.

Thursday, July 02, 2015, 15:55: EE held at 2 kV for 10 min. Current stable at 684 uA

Thursday, July 02, 2015, 15:55: EE back to 1.5 kV at 510 uA

Thursday, July 02, 2015, 20:06 : Starting cool down


Friday, July 03, 2015, 08:31: Closed IV4

Friday, July 03, 2015, 08:33: HV and source off


Monday, July 06, 2015, 11:04: Turbos stopped

Monday, July 06, 2015, 14:01: Venting

Entry  Monday, July 06, 2015, 09:29, Anders Mjos, , , , , , , Problems/Solutions, Replaced out gassing gauge on the backing line 
 
Entry  Monday, July 06, 2015, 14:26, Anders Mjos, , , , , , , , Pumping down empty chamber 

Monday, July 06, 2015, 14:26: Roughing


Wednesday, July 08, 2015, 09:26: Venting


Thursday, July 09, 2015, 11:42: Roughing

Thursday, July 09, 2015, 13:16: Turbos started.


Friday, July 10, 2015, 08:54 : Stopped turbos

Friday, July 10, 2015, 11:29 : Venting

Friday, July 10, 2015, 16:56: Roughing

Entry  Monday, July 13, 2015, 17:19, Anders Mjos, , LP-SIS, , , , , In progress, SIS Cup insulator clamping test 

Monday, July 13, 2015, 17:09: Roughing

Monday, July 13, 2015, 17:51: Turbos started

Monday, July 13, 2015, 18:01: Turbos at speed. Vacuum at 3.7E-5 T


Tuesday, July 14, 2015, 09:05: Opened HS water. No response on IG or RGA.

Tuesday, July 14, 2015, 09:12: Started auto-ramping to 300 / 150 A

Tuesday, July 14, 2015, 14:46: TGHT at 400 A, TBHT at 150 A. HS 27 C, SIS cup 76 C


Wednesday, July 15, 2015, 13:57: TGHT 580, TBHT 200. HS 20, SIS cup 120 C

Wednesday, July 15, 2015, 15:08: TBHT 220 A. HS 20, SIS Cup 133 C

Wednesday, July 15, 2015, 15:08: Started ramping down heaters.


Thursday, July 16, 2015, 08:52: Turbos stopped.

Thursday, July 16, 2015, 10:24: Venting

Reconfigured target to no clamping (standard SIS Cup configuration)

Thursday, July 16, 2015, 11:41: Roughing

Thursday, July 16, 2015, 13:40: Turbos started.


Friday, July 17, 2015, 08:47: Opened S water. No response on IG or RGA.

Friday, July 17, 2015, 08:51 : Started auto-ramping to 580 / 220 A

Friday, July 17, 2015, 13:30: TGHT at 560 A, TBHT at 220 A. HS 25 C, SIS cup 514 C

Friday, July 17, 2015, 14:10: TGHT at 580 A, TBHT at 220 A. HS 23 C, SIS cup 530 C

Friday, July 17, 2015, 15:56: Starting cool-down


 Monday, August 10, 2015, 08:43: Turbos stopped. Vacuum at 2.9E-7 T

Monday, August 10, 2015, 14:42: Venting

Entry  Tuesday, August 04, 2015, 13:37, Anders Mjos, , , , , , , Problems/Solutions, Equipment for outgassing measurements removed 
 
Entry  Monday, August 10, 2015, 18:01, Anders Mjos, , LP-SIS, , , , , In progress, Testing new center block target 

Installed thermocouples:
T1: TGHT tube left side, inside
T2: TBHT restraint
T3: Centre block top, outside

Monday, August 10, 2015, 18:01: Turbos started

Monday, August 10, 2015, 18:11 : Turbos at speed. Vacuum at 1.5E-5 T


Tuesday, August 11, 2015, 09:04: Opened water for HS. Vacuum stable at 5.2E-7 T. No response on RGA

Tuesday, August 11, 2015, 09:09 : Started auto-ramping to 250/100 A at 2/1 A/min.

Tuesday, August 11, 2015, 11:45: T1 857 C, T3 206 C (T2 no signal)

Tuesday, August 11, 2015, 11:45: Continue auto-ramping to 580/200 A.

Tuesday, August 11, 2015, 15:30: T1 1467, T3 816 at 580/230 A

Tuesday, August 11, 2015, 15:40: Starting cool down.


Wednesday, August 12, 2015, 09:40: Stopped turbos.

Wednesday, August 12, 2015, 13:20: Venting

The Centre block t/c was touching the TBHT terminal. Bent the t/c away from the TBHT terminal

Wednesday, August 12, 2015, 14:05: roughing

Wednesday, August 12, 2015, 14:48: Started turbos


Thursday, August 13, 2015, 09:06: Opened water for HS. Vacuum stable at 3.8E-7 T. No response on RGA

Thursday, August 13, 2015, 09:06: Started auto-ramping to 250/100 A at 2/1 A/min.

Thursday, August 13, 2015, 10:09: Aborting auto-ramping. Starting cool down. T/C shorts centre block to HS and may affect TGHT/TBHT current.

Thursday, August 13, 2015, 11:17: Turbos stopped.

Entry  Saturday, August 29, 2015, 14:33, Anders Mjos, , , , , , , Problems/Solutions, Restarted IOC after power outage 

 Saturday, August 29, 2015, 15:50: Turbos started

Entry  Wednesday, September 09, 2015, 08:54, Anders Mjos, , , , , , , In progress, Venting 

 Wednesday, September 09, 2015, 08:53: Turbos stopped


Friday, September 11, 2015: Vented

Entry  Friday, September 11, 2015, 11:43, Anders Mjos, Ta#46, HP-SIS, ITE, TM4, , , Done, Ta#46 conditioning Ta#46.docx

EE is ST-200 material (AlN)

Friday, September 11, 2015, 11:0: Roughing

Friday, September 11, 2015, 12:12: Turbos started.

Friday, September 11, 2015, 12:22: Turbos at speed. Vacuum at 2.2E-5 T

Friday, September 11, 2015, 14:02: RGA on.


Monday, September 14, 2015, 08:05: Opened water for HS circuit. Vacuum stable at 2.3E-7 T. No response on RGA.

Monday, September 14, 2015, 08:08: Opened IV4

Monday, September 14, 2015, 08:11: Starting Target Heat. TGHT/TBHT 580 / 200 A at 2 / 1 A/min. Good/bad vacuum 4E-6 / 6E-6 T

Monday, September 14, 2015, 08:12: Interlock for BIAS does not clear although EE is on. Interlock cleared when beam line elements were turned on

Monday, September 14, 2015, 08:20: BIAS/EZL/EE at 30 / 15 / 1.5 kV

Monday, September 14, 2015, 08:25: Returned MB1 to remote control

Monday, September 14, 2015, 13:28: Target at temperature

Monday, September 14, 2015, 15:06: Heating TBHT to 230 A 


Tuesday, September 15, 2015, 15:03: EE to 2 kV

Tuesday, September 15, 2015, 16:39: EE to 1.5 kV

Tuesday, September 15, 2015, 17:01: Starting target cool down


Wednesday, September 16, 2015, 09:01: HV and source off. Closed IV4. Turbos off

Wednesday, September 16, 2015, 12:52: RGA off. Venting

Entry  Monday, September 14, 2015, 08:38, Anders Mjos, , , , , , , Problems/Solutions, RP2 increased pressure 

 e-fault submitted and vacuum group (Edi) notified.

Monday, September 14, 2015, 09:33: RP2 replaced by vacuum group

Entry  Thursday, September 17, 2015, 14:05, Anders Mjos, Test Target, LP-SIS, , , , , In progress, New centre block test 

 

T1 Probe Inside Target Left
T2 Centre block attached outside
T3 Probe on table below
T4 not used

Thursday, September 17, 2015, 14:04: Roughing

Thursday, September 17, 2015, 14:59: Turbos started


Friday, September 18, 2015, 08:56: Opened HS water . Vacuum stable at 3.3E-7 T. No response on RGA

Friday, September 18, 2015, 09:11: Starting heating


Monday, September 21, 2015, 07:49: Starting heating to 100 / 50 A

Switched/corrected T/C polarity for T2 and T3

Monday, September 21, 2015, 08:47: Continue heating to 580 / 200 A

Monday, September 21, 2015, 13:08: Continue heating TBHT to 230 A

Monday, September 21, 2015, 15:48: Starting cool down

Monday, September 21, 2015, 16:14: RGA off


Tuesday, September 29, 2015, 16:30: Turbos stopped


Wednesday, September 30, 2015, 13:07 : Venting

Entry  Friday, September 18, 2015, 11:35, Anders Mjos, , , , , , , Problems/Solutions, TMS:TP6 nor working 

found in fault state this morning. Edi consulted and fault report submitted.

Entry  Wednesday, September 30, 2015, 16:28, Anders Mjos, Test Target wrapped with heat shields, LP-SIS, , , , , In progress, New centre block test 

 

T1 Probe Inside Target Left
T2  
T3 Probe Inside Target Right (touching tube)
T4  

Wednesday, September 30, 2015, 16:28: Roughing

Wednesday, September 30, 2015, 17:01: Turbos started

Wednesday, September 30, 2015, 17:09 : Turbos at speed. Vacuum at 3.4E-5 T


Thursday, October 01, 2015, 08:51: Opened HS water. No response on RGA. Vacuum stable at 7.2E-7 T

Thursday, October 01, 2015, 08:53: Atutoramping started to 580 / 230 A

Thursday, October 01, 2015, 09:49: Changed polarity on T3


Tuesday, October 06, 2015, 08:03: Turbos stopped

Tuesday, October 06, 2015, 09:54: Venting

 

Entry  Friday, October 02, 2015, 08:35, Anders Mjos, , , , , , , Problems/Solutions, Venting beam line for TP exchange 

 Friday, October 02, 2015, 08:35: Turbo stopped

Entry  Wednesday, October 07, 2015, 11:16, Anders Mjos, SiC#32, HP-FEBIAD, ITW, TM2, , , In progress, Conditioning SiC#32 SiC#32.docx

Wednesday, October 07, 2015, 11:15: roughing

Wednesday, October 07, 2015, 12:09 Turbos started

Wednesday, October 07, 2015, 12:18: Turbos at speed. Vacuum at 1.7E-5 T


Thursday, October 08, 2015, 08:55: Pumping down gas lines.

Thursday, October 08, 2015, 09:09: Opened gas line

Thursday, October 08, 2015, 09:24: Opened HS water line. Vacuum stable at 3.3E-7 T. No response on RGA

Thursday, October 08, 2015, 09:32: PS on. Starting autoramping to 580/300 A at 2/1 A/min good/bad vacuum at 1E-6 and $E-6

Thursday, October 08, 2015, 09:41: BIAS/EZL/EE to 30/15/1.5 kV

Thursday, October 08, 2015, 09:42: COIL to 50 A ANODE to 200 V


ANODE developed a short Thursday evening. Target was cooled down and will be inspected.

Friday, October 09, 2015, 12:36: Stopped turbos.

Friday, October 09, 2015, 13:26: Venting

    Reply  Tuesday, October 13, 2015, 07:47, Anders Mjos, SiC#32, HP-FEBIAD, ITW, TM2, , , In progress, Conditioning SiC#32 SiC#32-2.docx

Target was pumped down on Friday.


Tuesday, October 13, 2015, 07:47: Opened water for HS. No response on RGA. Vacuum stable at 2.2E-7 T

Tuesday, October 13, 2015, 07:59: Gas lines open.

 Tuesday, October 13, 2015, 08:00: IV4 opened

Tuesday, October 13, 2015, 08:04: BIAS/EZL/EE to 30 / 15 1.5 kV

Tuesday, October 13, 2015, 08:04: ANODE 200 V, COIL 50 A

Tuesday, October 13, 2015, 08:04: Ramping up heaters

Short on ANODE/CATHODE again. Ramping down.

Tuesday, October 13, 2015, 15:22: Turbos stopped.

Tuesday, October 13, 2015, 16:05: Venting

Entry  Tuesday, October 13, 2015, 16:04, Anders Mjos, , , , , , , Problems/Solutions, IV4 timed out 

Contacted Graham W. (controls) to have a look. It turned out to be a limit switch problem. Removed and reinstalled limit switch solved the time out issue.