ID Date Author Target/No.# Sourcedown Station Module Target Oven W.O# Heat Shield W.O# Status Subject
  335   Wednesday, September 18, 2013, 14:54 Anders Mjos      Problems/SolutionsHall probe calibration

New calibration of the m/q based on the hall probe after exchanging the controller(MASSOVERQ2). Based on NiO#2-HP-FEBIAD with Ne supplied and ANODE biased to 200V, 30kV Bias.

CONST11 = -16.3929
CONST22 = 0.12481

http://isacwserv.triumf.ca/onlylocal/isactdata/save_restore/masscorr/2013-09-18-09%20NiO%232

Data and results from Gnuplot

"2013-09-18 NiOcalibration.txt"
6.02 -1192 6Li
7.02 -1288 7Li
19.99 -2177 20Ne
21.99 -2284 22Ne
38.96 -3043 40K
40.96 -3118 41K
180.9 -6577 Ta
196.9 -6864 TaO

f(x)=((x+a)**2)*b/30000;
a=35.221;
b=0.129991;
fit f(x) "2013-09-18 NiOcalibration.txt" using 2:1 via a,b;

Final set of parameters Asymptotic Standard Error
======================= ==========================

a = -16.3929 +/- 2.015 (12.29%)
b = 0.12481 +/- 8.448e-005 (0.06769%)


correlation matrix of the fit parameters:

a b
a 1.000
b 0.952 1.000  

Attachment 1: 2013-09-18_NiOcalibration.png
2013-09-18_NiOcalibration.png
  338   Monday, September 30, 2013, 15:19 Anders Mjos      Problems/SolutionsNew purging valves installed on Heat Shield water circuit

The Heat Shield circuit can now be separately purged for water. Use valves on heat shield circuit to purge the lines for target exchanges from now on.

All paddle wheels have been rotated to allow trapped air to escape the system more easily.

  339   Thursday, October 03, 2013, 08:43 Anders Mjos      Problems/SolutionsTMS:TP2 tripped off - controller replaced.

This morning the turbo was found tripped off. 

The controller was replaced by Edi on Friday.


Monday, October 07, 2013, 08:28: Starting Turbo

Monday, October 07, 2013, 08:29: Turbo at speed. Vacuum at 4.4E-7 T

  340   Thursday, October 03, 2013, 14:15 Anders Mjos      Problems/SolutionsTMS:Q1 and Q6 tripped
  341   Tuesday, October 15, 2013, 16:17 Anders Mjos      DoneTGHT and TB HT test bar test

HS line is looped. Cu-test bars installed on TGHT and TBHT. Torqued all bolts  to 120 in lbs.

Tuesday, October 15, 2013, 16:17: Roughing

Tuesday, October 15, 2013, 16:39: Turbos started.

Tuesday, October 15, 2013, 16:48: Turbos at speed

Tuesday, October 15, 2013, 16:49: Vacuum at 3.0 E-5 T


Wednesday, October 16, 2013, 08:38: Opened water on HS. Vacuum stable at 5.5E-7 T.

Wednesday, October 16, 2013, 10:12: TBHT to 300A (0.623V) TGHT to 580A (1.443 V)

Wednesday, October 16, 2013, 10:13: Ramping down at 6A/min


Thursday, October 17, 2013, 08:33: Turbos stopped. Vacuum at 2.6E-7 T.

Thursday, October 17, 2013, 10:24: Venting

Turned TGHT Cu-bar 180 deg. Loosened and re-fastened all bolts to 120 in lbs.

Thursday, October 17, 2013, 10:48: Roughing.

Thursday, October 17, 2013, 11:07: Turbos started.

Thursday, October 17, 2013, 11:16: Turbos at speed.

Thursday, October 17, 2013, 11:17: Vacuum at 1.2E-5 T

 TGHT and TBHT were brought up to 580A and 300A.


Flow meters connected.

TGHT
T  27.8
Q 5.5

Monday, October 21, 2013, 13:34: Heating TGHT to 580A (1.411 V)

Monday, October 21, 2013, 13:37
TGHT
T  28.9
Q 5.4

Monday, October 21, 2013, 13:40
TGHT
T  29.1
Q 5.5

Monday, October 21, 2013, 13:45
TGHT
T  29.4
Q 5.4

TGHT RDCUR/VOL 581.5A / 1.421 V

Monday, October 21, 2013, 13:47
TGHT RDCUR/VOL 270.6 A / 0.674V
T  28.4
Q 5.4

Monday, October 21, 2013, 13:52
TGHT RDCUR/VOL 270.6 A / 0.674V
T  28.3
Q 5.5

Monday, October 21, 2013, 13:52: TGHT off.

TGHT
T  27.9
Q 5.5


Tuesday, October 22, 2013, 08:09: Stopped turbos. Vacuum at 1.4E-7 T

Tuesday, October 22, 2013, 12:29: Venting

 

Results in DocuShare collection

  342   Tuesday, October 22, 2013, 15:20 Rick Maharaj      Problems/SolutionsTarget Heater Conductor Block Insulators Replaced

The Conductor insulating blocks - ITD053C and ITD054C - that secure the target heater and coil conductor blocks were replaced. The existing ones were cracked and fell apart upon removal.

Attachment 1: Source_Tray_TGHT_and_COIL_insulators_replaced_2013-10.pdf
Source_Tray_TGHT_and_COIL_insulators_replaced_2013-10.pdf
  343   Tuesday, November 05, 2013, 15:50 Anders Mjos      Problems/SolutionsBacking pressure TSG:CG1A and CG1B elevated

Pressure around 140 mTorr. The pressure started increasing early November 2nd. Will continue to monitor.

Tuesday, November 12, 2013, 09:51 UPDATE
 Backing pressure further increased to ~ 350 mTorr over the weekend. Vacuum group has been informed and will replace the pump this week.

Attachment 1: Vacuum.png
Vacuum.png
  344   Tuesday, November 12, 2013, 12:38 Anders Mjos      Problems/SolutionsVacuumed desk, on and around the beam line
  345   Wednesday, November 20, 2013, 08:57 Anders Mjos      Problems/SolutionsBacking pressure TSG:CG1A and CG1B elevated

 

Anders Mjos wrote:

Pressure around 140 mTorr. The pressure started increasing early November 2nd. Will continue to monitor.

Tuesday, November 12, 2013, 09:51 UPDATE
 Backing pressure further increased to ~ 350 mTorr over the weekend. Vacuum group has been informed and will replace the pump this week.

 

 The backing pump (TSG:RP1) was replaced yesterday by Anthony Ip. Backing pressure is down to 1 mTorr on TSG:CG1A

  346   Wednesday, November 27, 2013, 08:27 Anders Mjos      Problems/SolutionsEPICS whiteout

Since yesterday around 4pm. Due to attempt to use the TMS:ER0 device.

IOC rebooted this morning. Archivers restarted.

  347   Monday, December 02, 2013, 08:36 Anders Mjos      Problems/SolutionsSources archiver started
  348   Monday, December 02, 2013, 15:21 Anders Mjos      Problems/SolutionsXantrex 10V 600A installed and in Cathode Negative mode

By Ray Dube. 

  349   Wednesday, December 04, 2013, 09:22 Anders Mjos      In progressTesting impedance with the new TBHT P/S

Wednesday, December 04, 2013, 09:21 : Turbos stopped. Vacuum at  1.2E-7 Torr

Wednesday, December 04, 2013, 12:35: Venting

Copper bars installed w/ 130 in lbs torque

Wednesday, December 04, 2013, 13:06: Roughing

Wednesday, December 04, 2013, 15:16: Turbos started. Vacuum at 0.03 Torr

Wednesday, December 04, 2013, 15:23: Turbos at speed.

Wednesday, December 04, 2013, 15:26: Vacuum at  5E-6 Torr


Thursday, December 05, 2013

Impedance measured on TGHT and TBHT (~2.5 mOhm and ~2.0 mOhm). Readback on TBHT gives an impedance of ~2.5 mOhm. This is higher than the previous test. Local current on TBHT shows 60A more than the readback at 300A.  The vacuum did not come down as low as usual, which likely means there is a leak.

Thursday, December 05, 2013, 13:15: Turbos stopped.


Friday, December 06, 2013, 13:11: Venting

Gaskets on doors cleaned.

Friday, December 06, 2013, 13:40: Roughing

Friday, December 06, 2013, 13:59: Starting turbos

Friday, December 06, 2013, 14:07: Turbos at speed.

Friday, December 06, 2013, 14:09: Vacuum at 1.4 E-5 Torr


Monday, December 09, 2013, 08:46: Vacuum at 2.0 E-5 Torr 

  350   Thursday, December 12, 2013, 09:01 Anders Mjos      Problems/SolutionsVacuum excursion over night

Monday, December 16, 2013, 08:53
Some additional smaller magnitude excursions have been observed since the fist on on Dec. 12th. See attached plot. 

Attachment 1: VacuumExcursion-2013-12-12.png
VacuumExcursion-2013-12-12.png
Attachment 2: VacuumExcursion-2013-12-16.png
VacuumExcursion-2013-12-16.png
  351   Wednesday, December 18, 2013, 12:04 Anders Mjos    40282-539230-1DoneHeating Test

 Wednesday, December 18, 2013, 12:04: Turbos stopped

Wednesday, December 18, 2013, 13:19: Venting

Ta-tube installed. All bolts torqued to 130 in lbs

Thermocouples installed.

CH1 1/2: welded outside tube centre - type C
CH2 4/5: inside probe left side - type C
CH3 6/7: inside probe right side - type C
CH4 8/9: welded on leg - type K

Wednesday, December 18, 2013, 14:41: Roughing

Initial temperatures
CH1  28.1
CH2  30.7
CH3  31.3
CH4  31.0

Wednesday, December 18, 2013, 15:50: Starting turbos.

Wednesday, December 18, 2013, 15:58: Turbos at speed.

Wednesday, December 18, 2013, 16:00: Vacuum at 9.3E-6 Torr


Thursday, December 19, 2013, 09:35  : Opened water for HS. Vacuum stable at 2.5E-7 Torr. Flow ~ 3.9 l/min

temperatures
CH1  26.3
CH2  Un
CH3  28.7
CH4  30.5

Thursday, December 19, 2013, 16:50: Ta-tube at 500A ~ 1380 deg C.

temperatures
CH1  33.6
CH2  1319.3
CH3  1443.4
CH4  20.1


Heated to 580A

Friday, December 20, 2013, 10:48: Started cool down at 2A/min.

Friday, December 20, 2013, 15:46: Switched off TGHT.

  352   Friday, December 20, 2013, 15:46 Anders Mjos      Problems/SolutionsWater switched off for the holidays
  353   Thursday, January 02, 2014, 11:53 Anders Mjos      Problems/SolutionsThe computer will not boot Windows

The computer has been brought over to PC support for diagnostics. 

Hard Drive was found to be corrupted. A new HD will be installed and Windows upgraded to a newer version.


Thursday, January 16, 2014

The PC has gotten a new HD with Windows 8.

Xming and PuTTY installed and configured for access to EPICS controls

  354   Tuesday, January 14, 2014, 08:58 Anders Mjos    40282-539230-1DoneHeating Test

Tuesday, January 14, 2014, 08:57: Stopping turbos. Vacuum at 1.2E-7 T

Tuesday, January 14, 2014, 13:32: Venting 

Ta-tube installed. All bolts torqued to 130 in lbs

Thermocouples installed. CH2/3 left/right swapped with respect to previous test.

CH1 1/2: welded outside tube centre - type C
CH2 4/5: inside probe right side - type C
CH3 6/7: inside probe left side - type C
CH4 8/9: welded on leg - type K

Tuesday, January 14, 2014, 15:10: Roughing 
Tuesday, January 14, 2014, 15:33: Starting turbos.
Tuesday, January 14, 2014, 15:42: Turbos at speed
Tuesday, January 14, 2014, 15:43: Vacuum at  2.3E-5 T


Wednesday, January 15, 2014, 10:32: Opened water. Vacuum stable at 2.9E-7 T.


Monday, January 20, 2014

Started heating the Target-tube. 

Pressure increase observed on water supply around 10. Supply ~100psi, return ~7 psi


Tuesday, January 21, 2014

Continue heating from 250 A

Tuesday, January 21, 2014, 15:47: TGHT at 580 A, 7.23 V


Wednesday, January 22, 2014

Target-tube cooled down over night. Will went to investigate TC connections.

Wednesday, January 22, 2014, 08:38 : Turbos stopped. Vacuum at 1.3E-7 T

  355   Thursday, January 16, 2014, 15:00 Anders Mjos      Problems/SolutionsFlow and temperature meter

Flow and temperature meter previously installed on cooling circuits. See attachment for details.

Typical values at 95 psi in and 10 psi out. Cyclotron off.

Device
Temp
[°C]

Flow
[lpm]

Heat Shield and Mounting Support Plate 25 3.9
Tube Heater 25 6.2
Coils and Extraction Electrode 25 5.0
Target Heater 25 5.5

 

Attachment 1: Vortex_Flow_Meter_Config.docx
  356   Friday, January 24, 2014, 10:49 Anders Mjos      Problems/SolutionsVenting the optics section to investigate Emittance Rig installation

Friday, January 24, 2014, 10:49 : Stopped turbos. Vacuum at 2.5E-7 T 

Friday, January 24, 2014, 12:52: Venting

Finished evaluating emittance rig installation.

Friday, January 24, 2014, 14:25: Roughing.

The Cu-tubing for cooling the Turbo pumps broke off during disassembly. New ferrules could not be located on site and may have to be ordered.

The system will be left under roughing vacuum over the weekend.


Wednesday, January 29, 2014

Cooling for Turbo pumps reconnected.