  Test-Stand, Page 31 of 53  Not logged in ELOG logo
ID Date Authordown Target/No.# Source Station Module Target Oven W.O# Heat Shield W.O# Status Subject
  455   Monday, July 06, 2015, 09:29 Anders Mjos      Problems/SolutionsReplaced out gassing gauge on the backing line
  456   Monday, July 06, 2015, 14:26 Anders Mjos       Pumping down empty chamber

Monday, July 06, 2015, 14:26: Roughing


Wednesday, July 08, 2015, 09:26: Venting


Thursday, July 09, 2015, 11:42: Roughing

Thursday, July 09, 2015, 13:16: Turbos started.


Friday, July 10, 2015, 08:54 : Stopped turbos

Friday, July 10, 2015, 11:29 : Venting

Friday, July 10, 2015, 16:56: Roughing

  457   Monday, July 13, 2015, 17:19 Anders Mjos LP-SIS    In progressSIS Cup insulator clamping test

Monday, July 13, 2015, 17:09: Roughing

Monday, July 13, 2015, 17:51: Turbos started

Monday, July 13, 2015, 18:01: Turbos at speed. Vacuum at 3.7E-5 T


Tuesday, July 14, 2015, 09:05: Opened HS water. No response on IG or RGA.

Tuesday, July 14, 2015, 09:12: Started auto-ramping to 300 / 150 A

Tuesday, July 14, 2015, 14:46: TGHT at 400 A, TBHT at 150 A. HS 27 C, SIS cup 76 C


Wednesday, July 15, 2015, 13:57: TGHT 580, TBHT 200. HS 20, SIS cup 120 C

Wednesday, July 15, 2015, 15:08: TBHT 220 A. HS 20, SIS Cup 133 C

Wednesday, July 15, 2015, 15:08: Started ramping down heaters.


Thursday, July 16, 2015, 08:52: Turbos stopped.

Thursday, July 16, 2015, 10:24: Venting

Reconfigured target to no clamping (standard SIS Cup configuration)

Thursday, July 16, 2015, 11:41: Roughing

Thursday, July 16, 2015, 13:40: Turbos started.


Friday, July 17, 2015, 08:47: Opened S water. No response on IG or RGA.

Friday, July 17, 2015, 08:51 : Started auto-ramping to 580 / 220 A

Friday, July 17, 2015, 13:30: TGHT at 560 A, TBHT at 220 A. HS 25 C, SIS cup 514 C

Friday, July 17, 2015, 14:10: TGHT at 580 A, TBHT at 220 A. HS 23 C, SIS cup 530 C

Friday, July 17, 2015, 15:56: Starting cool-down


 Monday, August 10, 2015, 08:43: Turbos stopped. Vacuum at 2.9E-7 T

Monday, August 10, 2015, 14:42: Venting

  458   Tuesday, August 04, 2015, 13:37 Anders Mjos      Problems/SolutionsEquipment for outgassing measurements removed
  459   Monday, August 10, 2015, 18:01 Anders Mjos LP-SIS    In progressTesting new center block target

Installed thermocouples:
T1: TGHT tube left side, inside
T2: TBHT restraint
T3: Centre block top, outside

Monday, August 10, 2015, 18:01: Turbos started

Monday, August 10, 2015, 18:11 : Turbos at speed. Vacuum at 1.5E-5 T


Tuesday, August 11, 2015, 09:04: Opened water for HS. Vacuum stable at 5.2E-7 T. No response on RGA

Tuesday, August 11, 2015, 09:09 : Started auto-ramping to 250/100 A at 2/1 A/min.

Tuesday, August 11, 2015, 11:45: T1 857 C, T3 206 C (T2 no signal)

Tuesday, August 11, 2015, 11:45: Continue auto-ramping to 580/200 A.

Tuesday, August 11, 2015, 15:30: T1 1467, T3 816 at 580/230 A

Tuesday, August 11, 2015, 15:40: Starting cool down.


Wednesday, August 12, 2015, 09:40: Stopped turbos.

Wednesday, August 12, 2015, 13:20: Venting

The Centre block t/c was touching the TBHT terminal. Bent the t/c away from the TBHT terminal

Wednesday, August 12, 2015, 14:05: roughing

Wednesday, August 12, 2015, 14:48: Started turbos


Thursday, August 13, 2015, 09:06: Opened water for HS. Vacuum stable at 3.8E-7 T. No response on RGA

Thursday, August 13, 2015, 09:06: Started auto-ramping to 250/100 A at 2/1 A/min.

Thursday, August 13, 2015, 10:09: Aborting auto-ramping. Starting cool down. T/C shorts centre block to HS and may affect TGHT/TBHT current.

Thursday, August 13, 2015, 11:17: Turbos stopped.

  460   Saturday, August 29, 2015, 14:33 Anders Mjos      Problems/SolutionsRestarted IOC after power outage

 Saturday, August 29, 2015, 15:50: Turbos started

  461   Wednesday, September 09, 2015, 08:54 Anders Mjos      In progressVenting

 Wednesday, September 09, 2015, 08:53: Turbos stopped


Friday, September 11, 2015: Vented

  462   Friday, September 11, 2015, 11:43 Anders MjosTa#46HP-SISITETM4  DoneTa#46 conditioning

EE is ST-200 material (AlN)

Friday, September 11, 2015, 11:0: Roughing

Friday, September 11, 2015, 12:12: Turbos started.

Friday, September 11, 2015, 12:22: Turbos at speed. Vacuum at 2.2E-5 T

Friday, September 11, 2015, 14:02: RGA on.


Monday, September 14, 2015, 08:05: Opened water for HS circuit. Vacuum stable at 2.3E-7 T. No response on RGA.

Monday, September 14, 2015, 08:08: Opened IV4

Monday, September 14, 2015, 08:11: Starting Target Heat. TGHT/TBHT 580 / 200 A at 2 / 1 A/min. Good/bad vacuum 4E-6 / 6E-6 T

Monday, September 14, 2015, 08:12: Interlock for BIAS does not clear although EE is on. Interlock cleared when beam line elements were turned on

Monday, September 14, 2015, 08:20: BIAS/EZL/EE at 30 / 15 / 1.5 kV

Monday, September 14, 2015, 08:25: Returned MB1 to remote control

Monday, September 14, 2015, 13:28: Target at temperature

Monday, September 14, 2015, 15:06: Heating TBHT to 230 A 


Tuesday, September 15, 2015, 15:03: EE to 2 kV

Tuesday, September 15, 2015, 16:39: EE to 1.5 kV

Tuesday, September 15, 2015, 17:01: Starting target cool down


Wednesday, September 16, 2015, 09:01: HV and source off. Closed IV4. Turbos off

Wednesday, September 16, 2015, 12:52: RGA off. Venting

Attachment 1: Ta#46.docx
  463   Monday, September 14, 2015, 08:38 Anders Mjos      Problems/SolutionsRP2 increased pressure

 e-fault submitted and vacuum group (Edi) notified.

Monday, September 14, 2015, 09:33: RP2 replaced by vacuum group

  464   Thursday, September 17, 2015, 14:05 Anders MjosTest TargetLP-SIS    In progressNew centre block test

 

T1 Probe Inside Target Left
T2 Centre block attached outside
T3 Probe on table below
T4 not used

Thursday, September 17, 2015, 14:04: Roughing

Thursday, September 17, 2015, 14:59: Turbos started


Friday, September 18, 2015, 08:56: Opened HS water . Vacuum stable at 3.3E-7 T. No response on RGA

Friday, September 18, 2015, 09:11: Starting heating


Monday, September 21, 2015, 07:49: Starting heating to 100 / 50 A

Switched/corrected T/C polarity for T2 and T3

Monday, September 21, 2015, 08:47: Continue heating to 580 / 200 A

Monday, September 21, 2015, 13:08: Continue heating TBHT to 230 A

Monday, September 21, 2015, 15:48: Starting cool down

Monday, September 21, 2015, 16:14: RGA off


Tuesday, September 29, 2015, 16:30: Turbos stopped


Wednesday, September 30, 2015, 13:07 : Venting

  465   Friday, September 18, 2015, 11:35 Anders Mjos      Problems/SolutionsTMS:TP6 nor working

found in fault state this morning. Edi consulted and fault report submitted.

  466   Wednesday, September 30, 2015, 16:28 Anders MjosTest Target wrapped with heat shieldsLP-SIS    In progressNew centre block test

 

T1 Probe Inside Target Left
T2  
T3 Probe Inside Target Right (touching tube)
T4  

Wednesday, September 30, 2015, 16:28: Roughing

Wednesday, September 30, 2015, 17:01: Turbos started

Wednesday, September 30, 2015, 17:09 : Turbos at speed. Vacuum at 3.4E-5 T


Thursday, October 01, 2015, 08:51: Opened HS water. No response on RGA. Vacuum stable at 7.2E-7 T

Thursday, October 01, 2015, 08:53: Atutoramping started to 580 / 230 A

Thursday, October 01, 2015, 09:49: Changed polarity on T3


Tuesday, October 06, 2015, 08:03: Turbos stopped

Tuesday, October 06, 2015, 09:54: Venting

 

  467   Friday, October 02, 2015, 08:35 Anders Mjos      Problems/SolutionsVenting beam line for TP exchange

 Friday, October 02, 2015, 08:35: Turbo stopped

  468   Wednesday, October 07, 2015, 11:16 Anders MjosSiC#32HP-FEBIADITWTM2  In progressConditioning SiC#32

Wednesday, October 07, 2015, 11:15: roughing

Wednesday, October 07, 2015, 12:09 Turbos started

Wednesday, October 07, 2015, 12:18: Turbos at speed. Vacuum at 1.7E-5 T


Thursday, October 08, 2015, 08:55: Pumping down gas lines.

Thursday, October 08, 2015, 09:09: Opened gas line

Thursday, October 08, 2015, 09:24: Opened HS water line. Vacuum stable at 3.3E-7 T. No response on RGA

Thursday, October 08, 2015, 09:32: PS on. Starting autoramping to 580/300 A at 2/1 A/min good/bad vacuum at 1E-6 and $E-6

Thursday, October 08, 2015, 09:41: BIAS/EZL/EE to 30/15/1.5 kV

Thursday, October 08, 2015, 09:42: COIL to 50 A ANODE to 200 V


ANODE developed a short Thursday evening. Target was cooled down and will be inspected.

Friday, October 09, 2015, 12:36: Stopped turbos.

Friday, October 09, 2015, 13:26: Venting

Attachment 1: SiC#32.docx
  469   Tuesday, October 13, 2015, 07:47 Anders MjosSiC#32HP-FEBIADITWTM2  In progressConditioning SiC#32

Target was pumped down on Friday.


Tuesday, October 13, 2015, 07:47: Opened water for HS. No response on RGA. Vacuum stable at 2.2E-7 T

Tuesday, October 13, 2015, 07:59: Gas lines open.

 Tuesday, October 13, 2015, 08:00: IV4 opened

Tuesday, October 13, 2015, 08:04: BIAS/EZL/EE to 30 / 15 1.5 kV

Tuesday, October 13, 2015, 08:04: ANODE 200 V, COIL 50 A

Tuesday, October 13, 2015, 08:04: Ramping up heaters

Short on ANODE/CATHODE again. Ramping down.

Tuesday, October 13, 2015, 15:22: Turbos stopped.

Tuesday, October 13, 2015, 16:05: Venting

Attachment 1: SiC#32-2.docx
  470   Tuesday, October 13, 2015, 16:04 Anders Mjos      Problems/SolutionsIV4 timed out

Contacted Graham W. (controls) to have a look. It turned out to be a limit switch problem. Removed and reinstalled limit switch solved the time out issue.

  471   Tuesday, October 13, 2015, 17:23 Anders MjosSiC#32HP-FEBIADITWTM2  In progressConditioning SiC#32

Tuesday, October 13, 2015, 17:22: Roughing

Tuesday, October 13, 2015, 18:07: Started turbos.

Tuesday, October 13, 2015, 18:15: Turbos at speed. Vacuum at 1.9E-5 T


Wednesday, October 14, 2015, 07:55: Vacuum at 4.0E-7 T. Pumping on gas lines.

Wednesday, October 14, 2015, 08:00: Opened HS water. No response on vacuum or RGA.

Wednesday, October 14, 2015, 08:03: Ramping heaters to 580 / 300 A

Wednesday, October 14, 2015, 08:10: Opening gas lines.

Wednesday, October 14, 2015, 08:14: IV4 opened.

Wednesday, October 14, 2015, 16:00: RP2 replaced. See separate e-log entry.

Wednesday, October 14, 2015, 16:32: TBHT 305 A

Wednesday, October 14, 2015, 17:02: Opened He. - 5.6

Wednesday, October 14, 2015, 19:15: Started cool down of target.

Wednesday, October 14, 2015, 19:16 : Closed gas valves.


Thursday, October 15, 2015, 06:22: Source off. Stopped turbos. RGA off.

Thursday, October 15, 2015, 07:46: Venting

The bolt on the right side TGHT leg was difficult to remove. Se separate e-log entry

Attachment 1: SiC#32-3.docx
Attachment 2: Emittance.zip
Attachment 3: NeEfficiecy.xlsx
  472   Wednesday, October 14, 2015, 16:13 Anders Mjos      Problems/SolutionsTMS:RP2 replaced

 by vacuum group. The pump was making more noise than usual.

  473   Thursday, October 15, 2015, 11:19 Anders Mjos      Problems/SolutionsRight side TGHT connector block removed

The keensert has been worn out and will be replaced.

The keensert was re-tapped and the block re-installed. New bolts used for TGHT connection (2x). Swagelok T connections shortened (pluged).

Attachment 1: Photo_2015-10-16_11_57_45_AM.jpg
Photo_2015-10-16_11_57_45_AM.jpg
Attachment 2: Photo_2015-10-16_11_57_51_AM.jpg
Photo_2015-10-16_11_57_51_AM.jpg
  474   Friday, October 16, 2015, 12:26 Anders MjosTarget tube only    41120-4In progressConditioning HS for UC#14

Friday, October 16, 2015, 12:20: Roughing.

Friday, October 16, 2015, 13:06: Started turbos.

Friday, October 16, 2015, 13:25: Turbos at speed. Vacuum at 3.2E-5 T


IG1 filament beeing replaced.


 Thursday, October 22, 2015, 13:56: Leak on water lines (pressurized all lines except HS line with helium)

Thursday, October 22, 2015, 13:57: Stopping turbos. RGA off.

Thursday, October 22, 2015, 15:02: Venting

Re-tightened all newly installed fittings.

Thursday, October 22, 2015, 15:41: Roughing

Thursday, October 22, 2015, 16:12: Turbos started.

Thursday, October 22, 2015, 16:22: Turbos at speed. Vacuum at 1.2 E-5 T. RGA on


Monday, October 26, 2015, 08:42: Stopped turbos. Water leak still present. RGA off.


Tuesday, October 27, 2015, 08:57: Venting

Tuesday, October 27, 2015, 14:25: roughing

Tuesday, October 27, 2015, 15:03: Turbos started.


Water can still be seen on the RGA when the TGHT cooling lines are pressurized.

Thursday, October 29, 2015, 14:00: Stopped turbos. RGA off.


Monday, November 02, 2015, 08:30: Venting

Attachment 1: 2015-10-22_TS_Leak.docx