ID |
Date |
Author |
Target/No.# |
Source |
Station |
Module |
Target Oven W.O# |
Heat Shield W.O# |
Status |
Subject |
444
|
Thursday, May 21, 2015, 17:26 |
Anders Mjos | | LP-FEBIAD | | TM2 | | | In progress | Re-testing new TM2 Source Tray | Thursday, May 21, 2015, 17:26: Roughing
Thursday, May 21, 2015, 18:02: Turbos started
Thursday, May 21, 2015, 18:12: Turbos at speed. Vacuum at 4.7E-5 T
Friday, May 22, 2015, 08:00: Opened water. Vacuum stable at 3.4E-6 T. No response on RGA
Friday, May 22, 2015, 08:10: Pumping on gas line
Friday, May 22, 2015, 08:21: Opened gas line.
Friday, May 22, 2015, 08:30: Auto-ramping to 500 / 250 A at 4/2 A/min. Good/bad vacuum 4E-6 and 5E-6 T
Friday, May 22, 2015, 08:35: BIAS/EZL/EE to 10 / 10 / 1.5 kV. COIL 50 A, ANODE 200 V
Friday, May 22, 2015, 12:16: Opened IV4
Friday, May 22, 2015, 14:59: BIAS/EZL/EE to 30 / 15 / 1.5 kV
Friday, May 22, 2015, 15:29 : Auto-ramping to 580 / 270 A at 2/1 A/min.
Saturday May 23 15:10 TGHT: 7.51 V 580 A, TBHT: 2.23 V 270 A, ANODE 200 V 13.4 mA, FC0 1.5e-8 A, IG1 1.9e-6 T, COIL 0 V 0 A not responding, some bias sparking over last 7 hours
Monday, May 25, 2015, 09:07: EE current limiting. Started auto-cool down at 4/2 A/min. Vacuum 1.2E-6 T
Monday, May 25, 2015, 09:37: BIAS and EZL to 0
Monday, May 25, 2015, 10:34 : Closed IV4
Monday, May 25, 2015, 11:56 : Cool down complete. Stopped turbos.
Monday, May 25, 2015, 13:17: Venting
Monday, May 25, 2015, 13:25: HS cooling circuit purged.
Monday, May 25, 2015, 14:25: The EE water line was found to be touching the COIL lines on the source tray. |
443
|
Thursday, May 21, 2015, 16:40 |
Anders Mjos | | | | | | | Problems/Solutions | Reconfigured service cap coil connections | The service cap has been reconfigured (colling and electric) to be compatible with the TM2 Source tray. Coil- is E & F , Coil+ is G & H. |
442
|
Tuesday, May 19, 2015, 19:10 |
Anders Mjos | | | | | | | Problems/Solutions | EPICS white out | Likely caused by the PLC. e-fault 8139
Wednesday, May 20, 2015
Dave Morris re-established contact with controls. (PLC IOC was down). |
441
|
Wednesday, May 13, 2015, 13:27 |
Anders Mjos | | LP-FEBIAD | | TM2 | | 39230-1 | In progress | Re-testing new TM2 Source Tray | NOTE: COIL PS is a 100 A supply, thus actual COIL current is 0.5x COIL set point.
Changed the FEBIAD connector blocks to have copper tubes exit below the block. Extended ANODE wire to allow it to be wrapped around Cu-tubes and keep it further away from the GE lines.
Wednesday, May 13, 2015, 13:45: Roughing
Wednesday, May 13, 2015, 14:13: Starting turbos
Wednesday, May 13, 2015, 14:23: Turbos at speed. Vacuum at 4.6E-5 T
Thursday, May 14, 2015, 09:27: He pressure tested waterlines to 70 psi He. No response on the RGA. Vacuum 3.3E-6 T
Thursday, May 14, 2015, 09:39: Opened water supply. No increase on the RGA or IG
Thursday, May 14, 2015, 10:04: Tested COIL to 50 A set point (= 25 A). Returned to 0 A.
Thursday, May 14, 2015, 10:09: Auto-ramping to 400 / 200 A at 4 / 2 A/min. Good/Bad vacuum 4E-6 / 5E-6 T
Thursday, May 14, 2015, 13:59: COIL at 50 A
Thursday, May 14, 2015, 21:57 : Starting cool down.
Friday, May 15, 2015, 06:25: Stopped turbos
Friday, May 15, 2015, 07:42 : Venting
C-seals installed.
Friday, May 15, 2015, 13:56: Roughing
Friday, May 15, 2015, 14:28 : Staring turbos
Friday, May 15, 2015, 14:38: Turbos ate speed. Vacuum at 3.9E-5 T
Tuesday, May 19, 2015, 07:31: Vacuum at 7.1E-7 T. Pumping on gas lines
Tuesday, May 19, 2015, 07:35: Water lines opened. Vacuum stable at 7.1E-7 T. No response on RGA
Tuesday, May 19, 2015, 07:43: Opened gas lines (SV5)
Tuesday, May 19, 2015, 07:47: Auto-ramping to 400 / 200 A at 4 / 2 A/min. Good/Bad vacuum 2E-6 / 4E-6 T
Tuesday, May 19, 2015, 08:46: ANODE and COIL to 200 V and 50 A
Tuesday, May 19, 2015, 09:39: Auto-ramping to 500 / 250 A at 2 / 1 A/min. Good/Bad vacuum 2E-6 / 4E-6 T
Tuesday, May 19, 2015, 10:54: Opened IV4
Tuesday, May 19, 2015, 11:14: Atuo-ramping to 270 A. BIAS/EZL/EE at 30 / 15 / 1.5 kV
Tuesday, May 19, 2015, 11:42: BIAS/EZL/EE to 20 / 10 / 1.5 kV
Wednesday, May 20, 2015, 09:55: Auto-ramping to 500 / 250 A at 4 / 2 A/min. Good/Bad vacuum 2E-6 / 4E-6 T
Wednesday, May 20, 2015, 09:57: BIAS/EZL/EE at 30 / 15 / 1.5 kV
Wednesday, May 20, 2015, 11:57: Auto-ramping to 580 / 290 A at 2 / 1 A/min.
Wednesday, May 20, 2015, 12:55: Vacuum excursion during beam tuning. Stopped turbos.
A leak was observed on the left coil conductor again. After inspecting the service cap, it was found that there was no water flow going through the left coil line due to differences in routing between the TM2 and the Test Stand source tray. A new coil line will be made and the water and electrical connections on the service cap will be reconfigured. |
440
|
Friday, May 08, 2015, 09:07 |
Anders Mjos | | | | | | | Problems/Solutions | EPICS lost contact with the PLC | Everything shut down, while EPICS showed everyhing to be on.
Controls group (Dave Morris) has reestablished contact. System is operations.
TSG section vented for Source Tray work
Friday, May 08, 2015, 09:13: TMS turbos at speed. Vacuum at 1.2E-5 T |
439
|
Monday, May 04, 2015, 09:51 |
Anders Mjos | | | | | | | Problems/Solutions | FEBIAD Coil power supply replaced | Power supply did not work after high voltage conditioning. On Friday May 1st John Chow replaced the power supply with a 12 V 100 A power supply temporary while the other supply is being repaired. EPICS controls have not been adjusted. |
438
|
Friday, April 24, 2015, 12:26 |
Anders Mjos | | LP-FEBIAD | | TM2 | | 39230-1 | In progress | Testing new TM2 Source Tray | Photos on DocuShare
Friday, April 24, 2015
The source tray has been installed and inspected.
Friday, April 24, 2015, 12:32: Roughing
Friday, April 24, 2015, 13:33: Starting turbos. Vacuum at 0.24 T
Friday, April 24, 2015, 13:42: Turbos at speed.
Friday, April 24, 2015, 13:43: 3.5E-5 T
Leak check performed with RGA and He pressurized on water line incl GE line to 50 psi. Doors and ANODE line blank off He sprayed. No response.
RGA response to He confirmed with FEBIAD gas leak.
Monday, April 27, 2015, 12:00: Ge water open.
Monday, April 27, 2015, 12:03: Water open
Monday, April 27, 2015, 15:07: Electrical check completed OK. Test results attached. Tested low voltage on EZL, CB1, VCB1, CBC, EE, ANODE and BIAS
Monday, April 27, 2015, 15:15: Turbos stopped. Colimator connected to HS lines (60 kV). Should be on GND potential.
Monday, April 27, 2015, 16:00: Roughing
Monday, April 27, 2015, 16:30: Starting turbos
Monday, April 27, 2015, 16:40: Turbos at speed. Vacuum at 1.8E-5 T
Tuesday, April 28, 2015, 09:46: Starting auto-ramping of heaters to 100 / 100 A at 2 A/min 3E-6 / 4E-6 T good/bad vacuum limits.
Tuesday, April 28, 2015, 10:38: Continue auto-ramping TGHT to 200 A
Tuesday, April 28, 2015, 11:15: Optics and steerers on.
Tuesday, April 28, 2015, 11:34: Continue auto-ramping TGHT to 250 A
Tuesday, April 28, 2015, 12:50: Continue auto-ramping TGHT/TBHT to 300 /150 A
Tuesday, April 28, 2015, 13:30: Continue auto-ramping TGHT/TBHT to 400 /200 A
Tuesday, April 28, 2015, 14:24: Continue auto-ramping TGHT/TBHT to 500 /250 A
Wednesday, April 29, 2015, 06:06: Starting auto-ramp down.
Wednesday, April 29, 2015, 09:09: ANODE to 200 V. No current.
Wednesday, April 29, 2015, 09:16 : ANODE to 300 V. No current.
Wednesday, April 29, 2015, 09:16: EE to 2kV. 691 uA
Wednesday, April 29, 2015, 09:17: ANODE off. EE to 1.5 kV
Wednesday, April 29, 2015, 09:20: BIAS/EZL at 5/5 kV
Wednesday, April 29, 2015, 09:26: BIAS/EZL at 7.5/5 kV
Wednesday, April 29, 2015, 09:32 : BIAS/EZL at 10/5 kV
Wednesday, April 29, 2015, 09:47: BIAS/EZL at 15/7.5 kV
Wednesday, April 29, 2015, 10:04: BIAS/EZL at 20/10 kV
Wednesday, April 29, 2015, 10:20: BIAS/EZL at 25/12.5 kV
Wednesday, April 29, 2015, 10:48: BIAS/EZL at 30/15 kV. 2 sparks in 10 min on BIAS
Wednesday, April 29, 2015, 10:54: No sparks for 10 min
Wednesday, April 29, 2015, 12:01: BIAS/EZL at 40/20 kV
Wednesday, April 29, 2015, 12:48: No spark for the last 15 min. 3 sparks in the last 30 min
Wednesday, April 29, 2015, 13:09: BIAS/EZL at 45/22.5 kV
Wednesday, April 29, 2015, 13:45: BIAS/EZL at 50/25 kV
Wednesday, April 29, 2015, 14:53: Sparking above 50 kV. Loosing EPICS communication.
Wednesday, April 29, 2015, 15:46: BIAS/EZL at 53/27.5 kV
Wednesday, April 29, 2015, 16:11: BIAS/EZL at 53/27.5 kV. No sparks for 15 min
Wednesday, April 29, 2015, 16:19: BIAS/EZL/EE off for today
Thursday, April 30, 2015, 08:37: BIAS/EZL at 40/20 kV. EE at 1.5 kV. IG1 at 7.1E-7 T
Thursday, April 30, 2015, 08:55: BIAS/EZL at 50/25 kV
Thursday, April 30, 2015, 09:10: 1 spark in the last 15 min
Thursday, April 30, 2015, 09:32: BIAS/EZL at 53/25 kV
Thursday, April 30, 2015, 09:42: No sparks for 10 min
Thursday, April 30, 2015, 09:53: BIAS/EZL at 54/25 kV
Thursday, April 30, 2015, 10:00: Sparking caused lost EPICS communication.Manually current limiting PS
Thursday, April 30, 2015, 10:25: BIAS/EZL at 53/25 kV
Thursday, April 30, 2015, 10:31: BIAS/EZL at 54/25 kV
Thursday, April 30, 2015, 10:47: BIAS/EZL at 55/25 kV
Thursday, April 30, 2015, 10:53: BIAS/EZL at 55/27.5 kV. No sparks for 5 min
Thursday, April 30, 2015, 10:57: No sparks for 10 min.
Thursday, April 30, 2015, 11:01: BIAS/EZL at 55/30 kV
Thursday, April 30, 2015, 11:17: No sparks for 30 min.
Thursday, April 30, 2015, 11:19: BIAS at 30 kV
Thursday, April 30, 2015, 11:36: ANODE to 200 V. COIL is limited in EPICS to 0A and 0V
Thursday, April 30, 2015, 11:41: Opened isolation valve
Thursday, April 30, 2015, 11:42: Autoramping heaters to 500 / 250 A at 4/2 A/min. Good vacuum 2E-6 T, bad vacuum 3E-6 T
Thursday, April 30, 2015, 12:01: No EZL sparks for 60 min
Thursday, April 30, 2015, 12:03: EZL to 14 kV
Thursday, April 30, 2015, 13:50: Continue ramping to 580 / 300 A at 1/1 A/min
Troubleshooting FEBIAD coil power supply
Thursday, April 30, 2015, 14:10: Pumping on gas lines.
Thursday, April 30, 2015, 14:18: Tripped heaters when opening gas line to vacuum.
Thursday, April 30, 2015, 14:20: Autoramping heaters 500 / 250 A at 6/3 A/min.
A large (water?) leak opened up with target close to max temperature. Water lines were pressurized in an attempt to identify the leaky line. The test yesterday were not conclusive and was repeated this morning with no He response. The vacuum did not improve over night.
Friday, May 01, 2015, 10:08: Venting
Left coil line removed.
Friday, May 01, 2015, 11:10: Roughing
Friday, May 01, 2015, 11:41: Started turbos
With the leak detector pumping on the left coil line, a large leak could be confirmed at the soldering site. |
437
|
Friday, April 24, 2015, 12:25 |
Anders Mjos | | | | | | | Problems/Solutions | Backing line pressure high | TSG:RP1 backing line pressure is >200 mT. An e-fault has been submitted to have the roughing pump replaced.
Friday, April 24, 2015, 13:13: Pump replaced by vacuum group. |
436
|
Wednesday, April 22, 2015, 13:17 |
Anders Mjos | | | | | | | | Source Tray Removed | by Mico, Dan and Anders |
435
|
Monday, April 13, 2015, 13:07 |
Anders Mjos | | | | | | | Problems/Solutions | ISAC Test Stand Optical elements power supply drop out | See e-fault 8027
Monday, April 13, 2015
Kevin and Graham are working on it
|
434
|
Thursday, April 09, 2015, 11:21 |
Anders Mjos | | | | | | | Problems/Solutions | No RGA communcations | RGA stopped working. Likely after a spark yesterday. |
433
|
Thursday, April 02, 2015, 15:42 |
Anders Mjos | TM2 Test Target | LP-FEBIAD | | TM2 | | 39230-1 | Done | TM2 Test Target Conditioning | Thursday, April 02, 2015, 15:42: Roughing
Thursday, April 02, 2015, 16:12: Turbos started
Thursday, April 02, 2015, 16:22: Turbos at speed. Vacuum at 8.7E-6 T
Tuesday, April 07, 2015, 08:24: Opened water for HS. Vacuum stable at 1.1E-7 T
Tuesday, April 07, 2015, 08:25: Pumping on gas lines.
Tuesday, April 07, 2015, 08:37: Finished pumping.
Tuesday, April 07, 2015, 08:41: Opening gas valve to vacuum chamber
Tuesday, April 07, 2015, 08:42: RGA filament on.
Tuesday, April 07, 2015, 08:55: BIAS/EZL/EE to 30/14/1.5 kV
Tuesday, April 07, 2015, 08:55: COIL to 50 A, ANODE to 200 V
Tuesday, April 07, 2015, 09:01: Started auto-heating to 580/250 A at 2 A/min
Tuesday, April 07, 2015, 13:25 : Opened IV4
Tuesday, April 07, 2015, 15:10: Ramping TBHT to 290A
Wednesday, April 08, 2015, 09:27: Opening for Ne gas
Wednesday, April 08, 2015, 12:05: BIAS/EZL to 40/18.5 kV
Wednesday, April 08, 2015, 13:15 :BIAS/EZL/EE to 50/23.5/2.0 kV
Wednesday, April 08, 2015, 15:15: BIAS/EZL/EE to 30/14/1.5 kV
Thursday, April 09, 2015, 11:19: Starting target cool down
Thursday, April 09, 2015, 16:54: BIAS/EZL/EE to 30/30/1.5 kV
Thursday, April 09, 2015, 17:58: BIAS and source off.
Friday, April 10, 2015, 08:21: Closed gas supply
Friday, April 10, 2015, 08:23: Stopped turbos |
432
|
Tuesday, March 24, 2015, 09:50 |
Anders Mjos | | | | | | | In progress | Empty chamber | Roughed down on Friday 20th
Tuesday, March 24, 2015, 09:49: Turbos started
Tuesday, March 24, 2015, 09:59: Turbos at speed. Vacuum at 2.8E-6 T
EPICS could not communicate with devices. Contacted controls (Dave M)
Thursday, April 02, 2015, 14:45: Stopped turbos.
Thursday, April 02, 2015, 15:10: Started venting through turbo pump (to 16 T)
Thursday, April 02, 2015, 15:12: Venting through VV1 |
431
|
Monday, March 16, 2015, 18:53 |
Anders Mjos | Ta#45 | HP-SIS | ITE | TM4 | 38817-5 | | In progress | Conditioning Ta#45 | Monday, March 16, 2015, 18:53: Started turbos
Monday, March 16, 2015, 19:00: Turbos at speed. Vacuum at 1.3E-5 T
Tuesday, March 17, 2015, 09:03: Opened cooling water. Vacuum stable at 1.9E-7 T
Tuesday, March 17, 2015, 09:12: Opened IV4. BIAS/EZL/EE to 30/14/1.5 kV
Tuesday, March 17, 2015, 09:20: Started heating TGHT/TBHT to 400/150 A at 2/1 A/min
Wednesday, March 18, 2015, 08:41: Continued heating TGHT/TBHT to 580/170 A at 2/1 A/min
Wednesday, March 18, 2015, 09:33: MB1 found tripped on water flow. Water pressure is low this morning as cyclotron main magnet was switched on, but not all water pumps. Expected to be resolved soon..
Some emittance scans at 170, 180, 190, 200 A TBHT were done
Thursday, March 19, 2015, 08:47: Heating TBHT to 220 A
Thursday, March 19, 2015, 08:56: Heating TBHT to 230 A
Thursday, March 19, 2015, 10:50: EE at -2000 V for 10 min
Thursday, March 19, 2015, 10:52: EE back at -1.5 kV
Thursday, March 19, 2015, 17:54: Started cool down of target
Friday, March 20, 2015, 08:47: Closed IV4
Friday, March 20, 2015, 08:47: RGA off.
Friday, March 20, 2015, 08:50: Stopped turbos
Friday, March 20, 2015, 10:24: Venting
Friday, March 20, 2015, 11:45: Target removed. |
430
|
Thursday, February 26, 2015, 10:11 |
Anders Mjos | | | | | | | In progress | Installing FEBIAD test target for emittance rig tests | Thursday, February 26, 2015, 10:11: Stopped turbos
Thursday, February 26, 2015, 11:23: Venting
Thursday, February 26, 2015, 11:39: Stopped venting at 550 T. To be continued later
Thursday, February 26, 2015, 15:46: Started roughing. Doors needed a push.
Thursday, February 26, 2015, 16:23: Started turbos
Thursday, February 26, 2015, 16:39: Turbos at speed. Vacuum at 5.2E-6 T
Friday, February 27, 2015, 09:22: Water on. Vacuum stable at 1.6E-7 T
Friday, February 27, 2015, 09:30: RGA on
Friday, February 27, 2015, 10:32: HV on. Ramping to TBHT 250 A at 4A/min
Friday, February 27, 2015, 16:38: Source off
Monday, March 02, 2015, 14:00: Gas lines purged. Opening.
Fixed a air leak on one of the Swagelok joints.
Monday, March 02, 2015, 14:47: RGA with Ne Open
Total 3.5E0-7T, IG1 9.7E-8 T
20Ne 6.3E-10 T
22Ne 1.7E-10 T
Mass 18 1.6E-7 T
Tuesday, March 03, 2015, 09:58: Started heating
Tuesday, March 03, 2015, 16:33: Finished ER testing. First ER scans made on mass 4.
Wednesday, March 04, 2015, 14:32: TSG:CB1 found off. Switched back on.
Emittance vs EE voltage studied
Thursday, March 05, 2015, 09:02 : Ramping source back up to 285 A (TBHT)
Thursday, March 05, 2015, 15:12: The following devices were found off
TMS:Q6
TMSQ1
TPS:CBC
Friday, March 06, 2015, 08:51: Found TPS:Q3 off. Switched back on.
Friday, March 06, 2015, 10:51 : Ramping down source
Friday, March 06, 2015, 12:08 : Source and HV off. Closed IV.
Graham will be doing some controls work
Monday, March 09, 2015, 09:16: Ramping up the source. IV opened
Monday, March 09, 2015, 09:23: Source biased and optics tune recovered.
Monday, March 09, 2015, 16:51: Opened Ne leak
Wednesday, March 11, 2015, 09:06: Found TMS:Q6/Q1 and TPS:Q4 off. Switched back on.
Thursday, March 12, 2015, 16:57: Finished more ER data taking. See attached spreadsheet
Friday, March 13, 2015, 08:41 : TMS:CBC1, TMS:CB5, TMS:Q2, TPS:Q3, TPS:CB2 found off. Switched back on.
Monday, March 16, 2015, 09:13: TMS:CBC1, TMS:Q3, Q2, TMS:VCB1,CB1 found off.
Monday, March 16, 2015, 09:14: Bias off. Stopping turbos
Monday, March 16, 2015, 15:26: Venting |
429
|
Wednesday, February 18, 2015, 13:32 |
Anders Mjos | | | | | | | Problems/Solutions | Switched off system in preparation for power outage | Thursday, February 19, 2015, 12:14: Starting system again after the power outage
Thursday, February 19, 2015, 13:27: The performance of RP1 has degraded. Edi flushed some air through, which helped a bit. It now takes longer to start up.
Thursday, February 19, 2015, 13:33: Vacuum recovered. |
428
|
Tuesday, February 17, 2015, 14:41 |
Anders Mjos | | | | | | | In progress | Pumping down empty chamber | Tuesday, February 17, 2015, 14:35: Roughing. Doors were difficult to get to seal.
Tuesday, February 17, 2015, 15:11: Started turbos
Tuesday, February 17, 2015, 15:34: Turbos at speed. Vacuum at 6.7E-6 T |
427
|
Friday, February 13, 2015, 13:59 |
Anders Mjos | | | | | | | Problems/Solutions | PLC failure | The PLC CPU came out of the socket around 11:50am today (Dave Morris). The CPU had not been properly attached. This resulted in full stop of all power supplies and vacuum pumps.
Restarted vacuum pumps at 12:10pm (20 min later). |
426
|
Tuesday, February 03, 2015, 16:10 |
Anders Mjos | | | | | | | Problems/Solutions | Current read back on TBHT has been corrected to 600 A | By controls group |
425
|
Tuesday, February 03, 2015, 14:33 |
Anders Mjos | Empty | LP-SIS | | | | | In progress | Target with new center block and new EE insulator | Also with newly installed RGA
Tuesday, February 03, 2015, 14:33: Roughing
Tuesday, February 03, 2015, 15:05: Turbos started
Tuesday, February 03, 2015, 15:15: Turbos at speed. Vacuum at 3.3E-5 T
Wednesday, February 04, 2015, 13:56: Cooling water on HS circuit on. No response on IG1 or on the RGA (water)
Thursday, February 05, 2015, 09:00: RGA started. Scan 1-100 every 5 min
Thursday, February 05, 2015, 09:02: Opened IV4
Thursday, February 05, 2015, 09:16: Started target heating to 500 / 150 A at 2 / 1 A/min
Thursday, February 05, 2015, 09:24: Opened electrical cage to switch on TGHT PS
Thursday, February 05, 2015, 09:26 : Started target heating to 500 / 150 A at 2 / 1 A/min
Thursday, February 05, 2015, 09:28: BIAS/EZL/EE on and at HV
Thursday, February 05, 2015, 13:21: TGHT voltage limited. Voltage limit increased to 7 V
Thursday, February 05, 2015, 13:53: Continue to 580 A
Thursday, February 05, 2015, 14:25: RGA stopped around 13:34. Started scanning again
Thursday, February 05, 2015, 15:08: Heating to 200 A on TBHT
Friday, February 06, 2015, 10:34: Heating TBHT to 220 A
Friday, February 06, 2015, 11:07: TBHT at 230 A. TGHT at 580 A
Friday, February 06, 2015, 11:50: Cooling down target
Friday, February 06, 2015, 11:56: RGA off
Friday, February 06, 2015, 11:5: BIAS/EZL/EE off
Tuesday, February 10, 2015, 11:34: BIAS/EZL/EE on. Started heating to 580 / 230 A at 4 / 2 A/min. RGA on
Monday, February 16, 2015, 08:46: BIAS/EZL/EE on
Monday, February 16, 2015, 09:13 : Started heating to 580 / 230 A at 4 / 2 A/min. RGA on
Monday, February 16, 2015, 10:10: Opened isolation valve
Monday, February 16, 2015, 14:23: TGHT was found voltage limiting at 7 V. Increased voltage limit to 7.2 V
Temperature read with digital optical pyrometer. Inside target 1800 - 1900 deg C. Outside 1900 - 2000 deg C
Monday, February 16, 2015, 15:50: Starting cool down
Tuesday, February 17, 2015, 08:30: RGA off
Tuesday, February 17, 2015, 08:32: BIAS/EZL/EE off. Isolation valve closed.
Tuesday, February 17, 2015, 08:34: Turbos off
Tuesday, February 17, 2015, 13:58: Venting |
|