  464   Thursday, September 17, 2015, 14:05 Anders MjosTest TargetLP-SIS    In progressNew centre block test 

    
        
  
  463   Monday, September 14, 2015, 08:38 Anders Mjos      Problems/SolutionsRP2 increased pressure e-fault submitted and vacuum group
(Edi) notified.
Monday, September 14, 2015, 09:33:
  
  462   Friday, September 11, 2015, 11:43 Anders MjosTa#46HP-SISITETM4  DoneTa#46 conditioningEE is ST-200 material (AlN)
Friday, September 11, 2015, 11:0:
Roughing
 Ta#46.docx 
  461   Wednesday, September 09, 2015, 08:54 Anders Mjos      In progressVenting Wednesday, September 09, 2015, 08:53:
Turbos stopped

Friday, September 11, 2015:
  
  460   Saturday, August 29, 2015, 14:33 Anders Mjos      Problems/SolutionsRestarted IOC after power outage Saturday, August 29, 2015, 15:50:
Turbos started
  
  459   Monday, August 10, 2015, 18:01 Anders Mjos LP-SIS    In progressTesting new center block targetInstalled thermocouples:
T1: TGHT tube left side, inside
T2: TBHT restraint
  
  458   Tuesday, August 04, 2015, 13:37 Anders Mjos      Problems/SolutionsEquipment for outgassing measurements removed    
  457   Monday, July 13, 2015, 17:19 Anders Mjos LP-SIS    In progressSIS Cup insulator clamping testMonday, July 13, 2015, 17:09: Roughing
Monday, July 13, 2015, 17:51: Turbos
started
  
  456   Monday, July 06, 2015, 14:26 Anders Mjos       Pumping down empty chamberMonday, July 06, 2015, 14:26: Roughing

Wednesday, July 08, 2015,
09:26: Venting
  
  455   Monday, July 06, 2015, 09:29 Anders Mjos      Problems/SolutionsReplaced out gassing gauge on the backing line    
  454   Tuesday, June 30, 2015, 14:51 Anders MjosZrC#7LP-SIS TM241177-2 In progressZrC#7 Conditioning 2Tuesday, June 30, 2015, 14:51: Roughing
Tuesday, June 30, 2015, 16:14: Started
turbos. CG1 at 0.075 T
 ZrC#7_Second_Time.docxTGT2-ER580-200-30kV-m39-off60-3.txt 
  453   Monday, June 29, 2015, 16:51 Friedhelm Ames      Problems/SolutionsTSG:BV1B closedfound TSG:TP1B tripped off. Closed TSG:BV1B
as pressure at TSG:iG1 was rising. Pressure
is coming down again.
  
  452   Thursday, June 25, 2015, 09:00 Anders Mjos LP-FEBIAD TM2   TM2 FEBIAD TestThursday, June 25, 2015, 09:00: Water on
HS. No vacuum response.
Thursday, June 25, 2015, 11:48: Started
  
  451   Monday, June 22, 2015, 15:49 Anders Mjos      In progressInstalled new 9-pin feed throughNo wires connected yet.
Monday, June 22, 2015, 15:48: Roughing

Tuesday, June 23, 2015, 09:05:
 9-pin_feed_through.jpg 
  450   Monday, June 15, 2015, 14:09 Anders MjosZrC#7LP-SIS TM241177-1 In progressZrC#7 ConditioningMonday, June 15, 2015, 14:05 Roughing
Monday, June 15, 2015, 14:39: Turbos
started.
 ZrC#7.docxER580-220-30kV-m39-off30.txt 
  449   Monday, June 15, 2015, 14:07 Anders Mjos      Problems/SolutionsTest Stand Source Tray installedMonday, June 15, 2015
Remaining items to do

    ANODE wire not yet attached
 Coils_configuration.jpg 
  448   Wednesday, June 03, 2015, 09:35 Anders Mjos      Problems/SolutionsPLC upgradeWednesday, June 03, 2015, 09:35: TP6 and
TP2 off
Wednesday, June 03, 2015, 10:15:
  
  447   Wednesday, May 27, 2015, 14:19 Anders Mjos LP-FEBIAD TM2  In progressRe-testing new TM2 Source TrayWednesday, May 27, 2015, 14:19: Roughing
Wednesday, May 27, 2015, 14:50: Turbos
started
 TM2_Source_Tray_Test_FEBIAD_Target_Test_4.docxTM2_Source_Tray_in_Test_Stand_-_Test_Results.pdf 
  446   Monday, May 25, 2015, 14:40 Anders MjosSiC#31HP-SISITWTM438817-7 In progressSiC#31 ConditioningMonday, May 25, 2015, 14:35: Rouging
Monday, May 25, 2015, 15:05: Turbos
started.
 SiC#31.docxER30kV580-200.txtER30kV580-230.txt 
  445   Thursday, May 21, 2015, 17:38 Anders Mjos      Problems/SolutionsInstalled equipment for measuring outgassing rate A gauge and a valve was installed
on the roughing line to the large turbo pump
  