713
|
Thursday, March 21, 2019, 08:33 |
Aaron Schmidt | | | | | | | | Pump down TS | Thursday, March 21, 2019, 08:32: Roughing. |
|
767
|
Thursday, October 31, 2019, 11:37 |
Fernando Maldonado | | | | | | | Problems/Solutions | Probing anode bias supply on the service cap | Thursday, October 31, 2019, 10:41: Cage removed. Tape put on the limit switches. Anode interlock bypassed.
Thursday, October 31, 2019, 10:42: Measuring voltage between F/T B and cable tray.
Thursday, October 31, 2019, 10:42: Readings match EPICS readback, i.e, 4 V readsback 3.7V and multimeter shows -3.816V
Thursday, October 31, 2019, 10:44: Probing from F/T B to J reads 0 V as expected. Anode is on common
Thursday, October 31, 2019, 10:45: Probing from F/T B to other F/T show 0V.
Thursday, October 31, 2019, 11:37: Current draw from the power supply matches the on neede for the 50 kOhm resistor.
|
|
260
|
Friday, January 04, 2013, 10:52 |
Anders Mjos | | | | | | | In progress | Preparing for venting | Friday, January 04, 2013, 10:51: Vacuum at 3.2E-7 T
Friday, January 04, 2013, 10:52: Turbos stopped
Friday, January 04, 2013, 13:50: Venting |
|
233
|
Monday, November 19, 2012, 10:20 |
Aurelia Laxdal | Test-SiC | HP-FEBIAD | | | | | | Preparations for E-Fault#6389 investigations | Prepared the Test Stand for Controls to investigate E-Fault#6389.
Evgeniy increased the current limit on the power supply TSH:TGHT from 2 rotations to 7 rotations, after talking to Ray Dube.
I turned on the HV at 30kV and started the Auto-ramping. |
|
953
|
Wednesday, December 21, 2022, 17:06 |
Carla Babcock | | | | | | | | Prep for power outage | Source and beamline power supplies turned off in EPICS
HV cage power off
Magnet ramped down and power supplies turned off manually (bira and tdk lambda)
VME crates and kepco turned off
Water lines closed
Will turn off pumps remotely later. Left PLC on |
|
619
|
Thursday, December 21, 2017, 15:12 |
Anders Mjos | | | | | | | | Powered down devices | Powered down vacuum gauge and turbo pump controllers |
|
546
|
Friday, October 14, 2016, 13:17 |
Anders Mjos | | | | | | | Problems/Solutions | Powerbump tripped off turbos | Friday, October 14, 2016, 13:17: Restarted pumps
Friday, October 14, 2016, 13:4: Another trip: restarted pumps
Tuesday, October 18, 2016, 12:12: Venting. |
|
575
|
Tuesday, April 04, 2017, 14:33 |
Aaron Schmidt | | | | | | | | Power supply failure to E-rig | Wednesday, March 29, 2017, 15:15: DAC power supply appears to have failed. Pop sound and electrical smoke/smell noticed.
Tuesday, April 04, 2017, 14:15: Kepco BOP 500M power supply replaced with back up Kepco BOP 500M.
Tuesday, April 04, 2017, 14:32: No response from new power supply. All connections in OK. Further inquiry required.
It has been determined, due to the damage shown in the uploaded pictures, that theis power supply will need replacing. |
Attachment 1: 20170330_094009.jpg
|
|
Attachment 2: 20170330_094019.jpg
|
|
Attachment 3: 20170407_115355.jpg
|
|
Attachment 4: 20170407_115223.jpg
|
|
Attachment 5: 20170407_115414.jpg
|
|
|
1033
|
Tuesday, December 03, 2024, 14:55 |
Dave Neilson | | | | | | | Done | Power supply changed to CATHODE mode (-) | Tuesday, December 03, 2024, 14:55 ANODE/CATHODE power supply switched to cathode mode, NEGATIVE |
|
705
|
Thursday, January 10, 2019, 11:38 |
Aaron Schmidt | | | | | | | | Power outtage prep | Thursday, January 10, 2019, 11:32: Power down TS. Lock out.
Thursday, January 10, 2019, 11:36: RGA switched off full.
Thursday, January 10, 2019, 11:38: All ion gauge and turbos off. BV's closed.
Friday, January 11, 2019, 07:30: Vent TS.
Friday, January 11, 2019, 08:10: Purge FS#5 waterlines and close off main supply / return.
Friday, January 11, 2019, 08:12: Closed PV1 & PV2. Shut off the roughing pumps. |
|
569
|
Monday, February 06, 2017, 09:14 |
Aaron Schmidt | | | | | | | Problems/Solutions | Power outage. | Weekend power outage. All turbos were tripped. Epics white out. Control group notified.
Monday, February 06, 2017, 09:07: Turbo pumps TMS : TP2 & TMS : TP6 restarted.
Monday, February 06, 2017, 09:12: TMS: IG6 ion gauge restarted.
Monday, February 06, 2017, 10:14: Turbo pumps TSG : TP1A & TSG : TP1B restarted.
Monday, February 06, 2017, 10:19: Ion gauge on. TP1B @ speed 42 KRPM.
Monday, February 06, 2017, 10:22: TP1A @ speed 38 KRPM. |
|
673
|
Thursday, July 12, 2018, 08:24 |
Aaron Schmidt | | LP-FEBIAD | | | 41790-9 | 42752-5 | In progress | Power outage / restart | Power outage (07/11/2018 @ approx 21:53) shut down the test stand.
Thursday, July 12, 2018, 08:17: Reset vacuum controls & IV4
Thursday, July 12, 2018, 08:19: Restart all the turbo pumps.
Thursday, July 12, 2018, 08:24: IG6 & IG1 restarted.
Thursday, July 12, 2018, 08:33: Power on.
Thursday, July 12, 2018, 08:36: Opened gas lines SV2 & SV5 for FEBIAD to pump down lines with the chamber.
Thursday, July 12, 2018, 08:56: Reset optics. Operation appears ok.
Thursday, July 12, 2018, 09:02: Sources except EE & BIAS are reset. BIAS requires EE and the EE won't restart / respond.
Thursday, July 12, 2018, 09:31: Cycle EE PS? No response.
Thursday, July 12, 2018, 10:08: Cycle PLC. EE is responsive / back. BIAS operates as well.
Thursday, July 12, 2018, 10:10: Opened IV4. |
|
624
|
Monday, January 29, 2018, 10:07 |
Aaron Schmidt | | LP-SIS | | | (Blank) | 42752-3 | Done | Power outage / HV test 2 | HV test 2 cancelled. 9:38: BIAS/EZL/EE @ 30/13/1.5 kV
Monday, January 29, 2018, 09:40 (Roughly) Power went out completely
Monday, January 29, 2018, 10:00: Power up TS
Monday, January 29, 2018, 10:07:Turbos on.
Monday, January 29, 2018, 10:11: Ion gauge on Vacuum @ 3.3e-06T
Monday, January 29, 2018, 11:47; Power cycled. PLC and Canbus reset/cfg.
Monday, January 29, 2018, 11:54: Optics & Sources ok/reset.
Monday, January 29, 2018, 13:27: BIAS/EZL/EE @ 30 / 13 / 1.5 kV.
Monday, January 29, 2018, 13:30: BIAS/EZL/EE @ 40 / 17 / 2 kV.
Monday, January 29, 2018, 13:33: BIAS/EZL/EE @ 45 / 19.5 / 2.25 kV.
Monday, January 29, 2018, 13:36: BIAS/EZL/EE @ 50 / 21.5 / 2.5 kV.
Monday, January 29, 2018, 13:40: BIAS/EZL/EE @ 55 / 23.8 / 2.75 kV.
Monday, January 29, 2018, 13:43: BIAS/EZL/EE @ 60 / 26 / 3 kV.
SPARKS*
Monday, January 29, 2018, 13:48: BIAS/EZL/EE @ 55 / 23.8 / 2.75 kV.
Monday, January 29, 2018, 13:51: BIAS/EZL/EE @ 57.5 / 26 / 2.9 kV.
Sparks
Monday, January 29, 2018, 13:57: BIAS/EZL/EE @ 58 / 27 / 2.95 kV.
Monday, January 29, 2018, 14:03: Holding.
Monday, January 29, 2018, 14:07: BIAS/EZL/EE @ 59 / 28 / 3.1 kV.
Monday, January 29, 2018, 14:14: Spark*
Monday, January 29, 2018, 14:45: Holding
Monday, January 29, 2018, 14:56: BIAS/EZL/EE @ 0. Test Complete |
Attachment 1: 2018_HV_test_2.docx
|
|
621
|
Monday, January 22, 2018, 09:04 |
Aaron Schmidt | | | | | | | Done | Power outage & Controller replacement. | Computer, TS, epics, restarted. Power checks
Monday, January 22, 2018, 09:00: ISAC PLC TLCIOC Restarted.
Turbo pumps restarted.
Monday, January 22, 2018, 09:26: New controller for TSG:TP1B brought in.
(Connect) Global reset. Resart Turbo pumps.
Monday, January 22, 2018, 09:40: Both turbo pumps @ speed.
Vacuum controls ok
Sources ok
Optics - Issues. Some restart, others do not.
|
|
616
|
Monday, December 04, 2017, 08:29 |
Aaron Schmidt | | | | | | | Problems/Solutions | Power outage | Power outage over the weekend. Reboot PLC and systems.
Monday, December 04, 2017, 08:22: Turbo pumps TMS:TP6 & TP2 Restarted.
Monday, December 04, 2017, 08:28: Time out on turbo pump TP1B.
Monday, December 04, 2017, 09:25: Turn off/restart TSG:TP1B Maincontrol.
Monday, December 04, 2017, 09:26: TMS:IG6 Restarted.
Monday, December 04, 2017, 14:24: Multi gauge controller to TSG:IG1 burned out. Replaced. Vacuum @ 4.45e-06T. Monitor. |
Attachment 1: 20171205_103324.jpg
|
|
|
257
|
Thursday, December 20, 2012, 14:19 |
Anders Mjos | | | | | | | | Power down for holidays | |
|
406
|
Monday, October 20, 2014, 09:17 |
Anders Mjos | | | | | | | Problems/Solutions | Power bump this weekend tripped off all turbo pumps | Monday, October 20, 2014, 09:17: Roughing
Monday, October 20, 2014, 09:18 : Turbos started
Monday, October 20, 2014, 09:29 : All turbos at speed
Monday, October 20, 2014, 10:11: Switched on optics |
|
909
|
Tuesday, January 04, 2022, 13:00 |
Aaron Schmidt | | | | | | | | Post water leak | December 30th, 2021: Water poured down around Isac test stand and probes lab area in service annex extension. problem was traced to a Cracked HVAC coil on SA roof
Fault: 14601
https://web.accel.triumf.ca/ncr/dbfault.pl?faultno=14601&usertype=unknown&username=&faultgroup=CYCLOTRON&debug=0&btn_submit=Showfault
https://elog.triumf.ca/TIS/Test-Stand/908
Noted on arrival to startup the ISAC TS some cleaning of the area was required. Optics PS & all PS quickly checked. OK / Dry.
Use caution when HV is to be applied later. Expect conditioning / noise from the cage.
|
|
327
|
Friday, August 23, 2013, 11:16 |
Anders Mjos | | | | | | | Problems/Solutions | Possible leak between BV1A, BV1B and PV1 | CG1A is climbing from 0.016 to 0.130 in 30 seconds when isolated.
The leak was confirmed to be between BV1A and PV1 in the bellows. The bellows has been replaced and backing pressure is back to normal values. |
|
769
|
Friday, November 01, 2019, 16:01 |
Fernando Maldonado | | LP-SIS | | | 41790-9 | 43515-9 | In progress | Peek seal tests on UCx#30 HS | Friday, November 01, 2019, 15:47: A symbiotic peek seal assembly was installed on the manipulator grip to verify the temperature at high voltage and high current.
Friday, November 01, 2019, 15:48: Three thermocouples added for temperature readings.
Friday, November 01, 2019, 15:47: Roughing
Friday, November 01, 2019, 16:19: Turbos on.
Friday, November 01, 2019, 16:27: IG1 on.
Friday, November 01, 2019, 16:29: RGA on.
AS
Monday, November 04, 2019, 07:41: Waterlines opened. No response on RGA. Vacuum ok @ 3.97e-07T.
Monday, November 04, 2019, 07:44: Power / sources on.
Monday, November 04, 2019, 07:47: Auto-ramping TGHT to 300 A @ 2 A per min.
Monday, November 04, 2019, 10:57: Auto-ramping TGHT to 400 A @ 2 A per min.
FM
Monday, November 04, 2019, 12:11: Auto-ramping TGHT to 500 A @ 2 A per min.
Monday, November 04, 2019, 13:35: Auto-ramping TGHT to 600 A @ 2 A per min.
Monday, November 04, 2019, 14:48: Bias/EE/EZL @ 30/1.5/13 kV.
Monday, November 04, 2019, 15:03: Bias/EE/EZL @ 40/2.0/17 kV.
Monday, November 04, 2019, 15:04: Sparks observed after reaching 40 kV. TMS:TP6 down. Back down to 32 kV.
Monday, November 04, 2019, 15:04: Bias to 40 kV. One spark only. Seems stable now.
Sparks occurred sparsely. Max time without a spark was 26 minutes.
Monday, November 04, 2019, 16:09: Bias/EE/EZL @ 30/1.5/13 kV.
Monday, November 04, 2019, 16:16: RGA restart.
AS
Tuesday, November 05, 2019, 08:30: RGA Restarted.
Tuesday, November 05, 2019, 08:32: Begin bringing up HV to 35 kV on BIAS.
Tuesday, November 05, 2019, 08:35: BIAS / EE / EZL @ 35 / 1.8 / 15 kV.
Tuesday, November 05, 2019, 08:55: No sparks after 20 minutes. Move up to 40 kV.
Tuesday, November 05, 2019, 08:59: BIAS / EE / EZL @ 40 / 2.0 / 20 kV.
Tuesday, November 05, 2019, 09:34: Audible Spark*. Restart TSG: CB1, VCB1, CBCx2. Reset & restart turbo pump. TMS:TP6. Appears on EZl cur.
Tuesday, November 05, 2019, 09:37: RGA off. Leave it off.
Tuesday, November 05, 2019, 09:38: Audible Spark* but not loud at all. Restart TSG: CB1, VCB1, CBCx2. Reset & restart turbo pump. TMS:TP6.
Tuesday, November 05, 2019, 10:00: BIAS / EE / EZL @ 35 / 1.8 / 17.5 kV.
Tuesday, November 05, 2019, 10:06: BIAS / EE / EZL @ 0 / 0 / 0 kV.
Tuesday, November 05, 2019, 10:07: Auto-cooling TGHT to 500 A @ 4 A per min.
Wednesday, November 13, 2019, 07:29: Turbo pumps & ion gauge off. RGA was already off.
Friday, November 15, 2019, 08:43: Venting.
|
Attachment 1: UC#30-plus-peak-seal.docx
|
Attachment 2: TS-2019-11-01-16-22.rga
|
Attachment 3: TS-2019-11-04-16-12.rga
|
Attachment 4: TS-2019-11-05-08-30.rga
|
|