ID Date Author Target/No.# Source Station Module Target Oven W.O# Heat Shield W.O# Status Subjectdown
  713   Thursday, March 21, 2019, 08:33 Aaron Schmidt       Pump down TS

Thursday, March 21, 2019, 08:32: Roughing.

  767   Thursday, October 31, 2019, 11:37 Fernando Maldonado      Problems/SolutionsProbing anode bias supply on the service cap

Thursday, October 31, 2019, 10:41: Cage removed. Tape put on the limit switches. Anode interlock bypassed.

Thursday, October 31, 2019, 10:42: Measuring voltage between F/T B and cable tray.

Thursday, October 31, 2019, 10:42: Readings match EPICS readback, i.e, 4 V readsback 3.7V and multimeter shows -3.816V

Thursday, October 31, 2019, 10:44: Probing from F/T B to J reads 0 V as expected. Anode is on common

Thursday, October 31, 2019, 10:45: Probing from F/T B to other F/T show 0V.

Thursday, October 31, 2019, 11:37: Current draw from the power supply matches the on neede for the 50 kOhm resistor.

 

  260   Friday, January 04, 2013, 10:52 Anders Mjos      In progressPreparing for venting

 Friday, January 04, 2013, 10:51: Vacuum at 3.2E-7 T

Friday, January 04, 2013, 10:52: Turbos stopped

Friday, January 04, 2013, 13:50: Venting

  233   Monday, November 19, 2012, 10:20 Aurelia LaxdalTest-SiCHP-FEBIAD     Preparations for E-Fault#6389 investigations

Prepared the Test Stand for Controls to investigate E-Fault#6389.


Evgeniy increased the current limit on the power supply TSH:TGHT from 2 rotations to 7 rotations, after talking to Ray Dube.

I turned on the HV at 30kV and started the Auto-ramping.

  953   Wednesday, December 21, 2022, 17:06 Carla Babcock       Prep for power outage

Source and beamline power supplies turned off in EPICS

HV cage power off

Magnet ramped down and power supplies turned off manually (bira and tdk lambda)

VME crates and kepco turned off

Water lines closed

Will turn off pumps remotely later. Left PLC on

  619   Thursday, December 21, 2017, 15:12 Anders Mjos       Powered down devices

Powered down vacuum gauge and turbo pump controllers

  546   Friday, October 14, 2016, 13:17 Anders Mjos      Problems/SolutionsPowerbump tripped off turbos

Friday, October 14, 2016, 13:17: Restarted pumps

Friday, October 14, 2016, 13:4: Another trip: restarted pumps


Tuesday, October 18, 2016, 12:12: Venting.

  575   Tuesday, April 04, 2017, 14:33 Aaron Schmidt       Power supply failure to E-rig

Wednesday, March 29, 2017, 15:15: DAC power supply appears to have failed. Pop sound and electrical smoke/smell noticed.


Tuesday, April 04, 2017, 14:15: Kepco BOP 500M power supply replaced with back up Kepco BOP 500M.

Tuesday, April 04, 2017, 14:32: No response from new power supply. All connections in OK. Further inquiry required.

It has been determined, due to the damage shown in the uploaded pictures, that theis power supply will need replacing.
Attachment 1: 20170330_094009.jpg
20170330_094009.jpg
Attachment 2: 20170330_094019.jpg
20170330_094019.jpg
Attachment 3: 20170407_115355.jpg
20170407_115355.jpg
Attachment 4: 20170407_115223.jpg
20170407_115223.jpg
Attachment 5: 20170407_115414.jpg
20170407_115414.jpg
  1033   Tuesday, December 03, 2024, 14:55 Dave Neilson      DonePower supply changed to CATHODE mode (-)

Tuesday, December 03, 2024, 14:55  ANODE/CATHODE power supply switched to cathode mode, NEGATIVE

  705   Thursday, January 10, 2019, 11:38 Aaron Schmidt       Power outtage prep

Thursday, January 10, 2019, 11:32: Power down TS. Lock out.

Thursday, January 10, 2019, 11:36: RGA switched off full.

Thursday, January 10, 2019, 11:38: All ion gauge and turbos off. BV's closed.


Friday, January 11, 2019, 07:30: Vent TS.

Friday, January 11, 2019, 08:10: Purge FS#5 waterlines and close off main supply / return.

Friday, January 11, 2019, 08:12: Closed PV1 & PV2. Shut off the roughing pumps.

  569   Monday, February 06, 2017, 09:14 Aaron Schmidt      Problems/SolutionsPower outage.

Weekend power outage. All turbos were tripped. Epics white out. Control group notified.

Monday, February 06, 2017, 09:07: Turbo pumps TMS : TP2 & TMS : TP6 restarted.

Monday, February 06, 2017, 09:12: TMS: IG6 ion gauge restarted.

Monday, February 06, 2017, 10:14: Turbo pumps TSG : TP1A & TSG : TP1B restarted.

Monday, February 06, 2017, 10:19: Ion gauge on. TP1B @ speed 42 KRPM.

Monday, February 06, 2017, 10:22: TP1A @ speed 38 KRPM.

  673   Thursday, July 12, 2018, 08:24 Aaron Schmidt LP-FEBIAD  41790-942752-5In progressPower outage / restart

Power outage (07/11/2018 @ approx 21:53) shut down the test stand.

 

Thursday, July 12, 2018, 08:17: Reset vacuum controls & IV4

Thursday, July 12, 2018, 08:19: Restart all the turbo pumps.

Thursday, July 12, 2018, 08:24: IG6 & IG1 restarted.

Thursday, July 12, 2018, 08:33: Power on.

Thursday, July 12, 2018, 08:36: Opened gas lines SV2 & SV5 for FEBIAD to pump down lines with the chamber.

Thursday, July 12, 2018, 08:56: Reset optics. Operation appears ok.

Thursday, July 12, 2018, 09:02: Sources except EE & BIAS are reset. BIAS requires EE and the EE won't restart / respond.

Thursday, July 12, 2018, 09:31: Cycle EE PS? No response.

Thursday, July 12, 2018, 10:08: Cycle PLC. EE is responsive / back. BIAS operates as well.

Thursday, July 12, 2018, 10:10: Opened IV4.

  624   Monday, January 29, 2018, 10:07 Aaron Schmidt LP-SIS  (Blank)42752-3DonePower outage / HV test 2

HV test 2 cancelled.  9:38: BIAS/EZL/EE @ 30/13/1.5 kV

Monday, January 29, 2018, 09:40 (Roughly) Power went out completely

Monday, January 29, 2018, 10:00: Power up TS

Monday, January 29, 2018, 10:07:Turbos on.

Monday, January 29, 2018, 10:11: Ion gauge on Vacuum @ 3.3e-06T

Monday, January 29, 2018, 11:47; Power cycled. PLC and Canbus reset/cfg.

Monday, January 29, 2018, 11:54: Optics & Sources ok/reset.

 

Monday, January 29, 2018, 13:27: BIAS/EZL/EE @ 30 / 13 / 1.5 kV.

Monday, January 29, 2018, 13:30: BIAS/EZL/EE @ 40 / 17 / 2 kV.

Monday, January 29, 2018, 13:33: BIAS/EZL/EE @ 45 / 19.5 / 2.25 kV.

Monday, January 29, 2018, 13:36: BIAS/EZL/EE @ 50 / 21.5 / 2.5 kV.

Monday, January 29, 2018, 13:40: BIAS/EZL/EE @ 55 / 23.8 / 2.75 kV.

Monday, January 29, 2018, 13:43: BIAS/EZL/EE @ 60 / 26 / 3 kV.

SPARKS*

Monday, January 29, 2018, 13:48: BIAS/EZL/EE @ 55 / 23.8 / 2.75 kV.

Monday, January 29, 2018, 13:51: BIAS/EZL/EE @ 57.5 / 26 / 2.9 kV.

Sparks

Monday, January 29, 2018, 13:57: BIAS/EZL/EE @ 58 / 27 / 2.95 kV.

Monday, January 29, 2018, 14:03: Holding.

Monday, January 29, 2018, 14:07: BIAS/EZL/EE @ 59 / 28 / 3.1 kV.

Monday, January 29, 2018, 14:14: Spark*

Monday, January 29, 2018, 14:45: Holding

Monday, January 29, 2018, 14:56: BIAS/EZL/EE @ 0. Test Complete

Attachment 1: 2018_HV_test_2.docx
  621   Monday, January 22, 2018, 09:04 Aaron Schmidt      DonePower outage & Controller replacement.

Computer, TS, epics, restarted. Power checks

Monday, January 22, 2018, 09:00: ISAC PLC TLCIOC Restarted. 

Turbo pumps restarted.

Monday, January 22, 2018, 09:26: New controller for TSG:TP1B brought in.

(Connect) Global reset. Resart Turbo pumps.

Monday, January 22, 2018, 09:40: Both turbo pumps @ speed.

Vacuum controls ok

Sources ok

Optics -  Issues. Some restart, others do not.

 

  616   Monday, December 04, 2017, 08:29 Aaron Schmidt      Problems/SolutionsPower outage

Power outage over the weekend. Reboot PLC and systems.

Monday, December 04, 2017, 08:22: Turbo pumps TMS:TP6 & TP2 Restarted.

Monday, December 04, 2017, 08:28: Time out on turbo pump TP1B.

Monday, December 04, 2017, 09:25: Turn off/restart TSG:TP1B Maincontrol.

Monday, December 04, 2017, 09:26: TMS:IG6 Restarted.

Monday, December 04, 2017, 14:24: Multi gauge controller to TSG:IG1 burned out. Replaced. Vacuum @ 4.45e-06T. Monitor.

Attachment 1: 20171205_103324.jpg
20171205_103324.jpg
  257   Thursday, December 20, 2012, 14:19 Anders Mjos       Power down for holidays
  406   Monday, October 20, 2014, 09:17 Anders Mjos      Problems/SolutionsPower bump this weekend tripped off all turbo pumps

 Monday, October 20, 2014, 09:17: Roughing

Monday, October 20, 2014, 09:18 : Turbos started

Monday, October 20, 2014, 09:29 : All turbos at speed

Monday, October 20, 2014, 10:11: Switched on optics

  909   Tuesday, January 04, 2022, 13:00 Aaron Schmidt       Post water leak

 December 30th, 2021: Water poured down around Isac test stand and probes lab area in service annex extension. problem was traced to a Cracked HVAC coil on SA roof

Fault: 14601 

https://web.accel.triumf.ca/ncr/dbfault.pl?faultno=14601&usertype=unknown&username=&faultgroup=CYCLOTRON&debug=0&btn_submit=Showfault


https://elog.triumf.ca/TIS/Test-Stand/908

Noted on arrival to startup the ISAC TS some cleaning of the area was required. Optics PS & all PS quickly checked. OK / Dry. 

Use caution when HV is to be applied later. Expect conditioning / noise from the cage. 

 

  327   Friday, August 23, 2013, 11:16 Anders Mjos      Problems/SolutionsPossible leak between BV1A, BV1B and PV1

CG1A is climbing from 0.016 to 0.130 in 30 seconds when isolated.

The leak was confirmed to be between BV1A and PV1 in the bellows. The bellows has been replaced and backing pressure is back to normal values.

  769   Friday, November 01, 2019, 16:01 Fernando Maldonado LP-SIS  41790-9 43515-9 In progressPeek seal tests on UCx#30 HS

Friday, November 01, 2019, 15:47: A symbiotic  peek seal assembly  was installed on the manipulator grip to verify the temperature at high voltage and high current.

Friday, November 01, 2019, 15:48: Three  thermocouples added for temperature readings.

Friday, November 01, 2019, 15:47: Roughing

Friday, November 01, 2019, 16:19: Turbos on.

Friday, November 01, 2019, 16:27: IG1 on.

Friday, November 01, 2019, 16:29: RGA on.


AS

Monday, November 04, 2019, 07:41: Waterlines opened. No response on RGA. Vacuum ok @ 3.97e-07T.

Monday, November 04, 2019, 07:44: Power / sources on.

Monday, November 04, 2019, 07:47: Auto-ramping TGHT to 300 A @ 2 A per min.

Monday, November 04, 2019, 10:57: Auto-ramping TGHT to 400 A @ 2 A per min.

FM

Monday, November 04, 2019, 12:11: Auto-ramping TGHT to 500 A @ 2 A per min.

Monday, November 04, 2019, 13:35: Auto-ramping TGHT to 600 A @ 2 A per min.

Monday, November 04, 2019, 14:48: Bias/EE/EZL @ 30/1.5/13 kV.

Monday, November 04, 2019, 15:03: Bias/EE/EZL @ 40/2.0/17 kV.

Monday, November 04, 2019, 15:04: Sparks observed after reaching 40 kV. TMS:TP6 down. Back down to 32 kV.

Monday, November 04, 2019, 15:04:  Bias to 40 kV. One spark only. Seems stable now.

Sparks occurred sparsely. Max time without a spark was 26 minutes.

Monday, November 04, 2019, 16:09: Bias/EE/EZL @ 30/1.5/13 kV.

Monday, November 04, 2019, 16:16: RGA restart.


AS

Tuesday, November 05, 2019, 08:30: RGA Restarted.

Tuesday, November 05, 2019, 08:32: Begin bringing up HV to 35 kV on BIAS.

Tuesday, November 05, 2019, 08:35: BIAS / EE / EZL @ 35 / 1.8 / 15 kV.

Tuesday, November 05, 2019, 08:55: No sparks after 20 minutes. Move up to 40 kV.

Tuesday, November 05, 2019, 08:59: BIAS / EE / EZL @ 40 / 2.0 / 20 kV.

Tuesday, November 05, 2019, 09:34: Audible Spark*. Restart TSG: CB1, VCB1, CBCx2. Reset & restart turbo pump. TMS:TP6. Appears on EZl cur.

Tuesday, November 05, 2019, 09:37: RGA off. Leave it off.

Tuesday, November 05, 2019, 09:38: Audible Spark* but not loud at all. Restart TSG: CB1, VCB1, CBCx2. Reset & restart turbo pump. TMS:TP6.

Tuesday, November 05, 2019, 10:00: BIAS / EE / EZL @ 35 / 1.8 / 17.5 kV.

Tuesday, November 05, 2019, 10:06: BIAS / EE / EZL @ 0 / 0 / 0 kV.

Tuesday, November 05, 2019, 10:07: Auto-cooling TGHT to 500 A @ 4 A per min.


Wednesday, November 13, 2019, 07:29: Turbo pumps & ion gauge off. RGA was already off.


Friday, November 15, 2019, 08:43: Venting.

 

 

Attachment 1: UC#30-plus-peak-seal.docx
Attachment 2: TS-2019-11-01-16-22.rga
Attachment 3: TS-2019-11-04-16-12.rga
Attachment 4: TS-2019-11-05-08-30.rga