  Test-Stand, Page 26 of 53  Not logged in ELOG logo
  ID Date Author Target/No.# Source Station Module Target Oven W.O# Heat Shield W.O# Status Subjectdown
  278   Monday, January 28, 2013, 14:41 Anders MjosEmpty      Pumping down

Monday, January 28, 2013, 14:41: Roughing

Monday, January 28, 2013, 15:35: Starting turbos

Monday, January 28, 2013, 15:43: Turbos at speed

Monday, January 28, 2013, 15:45: Vacuum at 3.9 E-6 T

  617   Tuesday, December 12, 2017, 08:32 Aaron Schmidt LP-SIS  (Blank)42752-3DonePump down w/ possible outgas

Check achievable vacuum. Watch for spikes on RGA. Silver bolts removed from the chamber. Vented steel screws in.

Tuesday, December 12, 2017, 08:23: Doors open from previous test. (Open for 7 minutes)

Tuesday, December 12, 2017, 08:30: Doors closed. Roughing.

Tuesday, December 12, 2017, 08:50: Turbo pumps on.

Tuesday, December 12, 2017, 08:56: Ion gauge on.


Wednesday, December 13, 2017, 06:46: Check. Vacuum @ 5.44e-07T. RGA Error.

Wednesday, December 13, 2017, 06:49: RGA restarted.

Wednesday, December 13, 2017, 06:52: Water lines opened. Vacuum @ 5.44e-07T

Wednesday, December 13, 2017, 06:54: Power on.

Wednesday, December 13, 2017, 06:56: Auto ramping TGHT / TBHT to 580 / 200 A @ 2A per min.


Friday, December 15, 2017, 13:37: Auto-cooling @ 2A per min


Monday, December 18, 2017, 08:15: Power/source off.


Wednesday, December 20, 2017, 09:07: RGA off.

Wednesday, December 20, 2017, 09:08: Both Ion gauges and all 4 turbo pumps off.

Attachment 1: Empty_Chamber_-_Silver_bolts_removed.docx
Attachment 2: TS-2017-12-12-09-00.rga
Attachment 3: TS-2017-12-13-06-50.rga
  548   Monday, October 24, 2016, 16:02 Aaron Schmidt      Problems/SolutionsPump down empty chamber/Clean Exhaust/Test

Monday, October 24, 2016, 15:45: Remove metal mesh covering roughing pump exhaust.

Clean out mesh (3/4"-5/8" thick w/ layers of dust/material).

Monday, October 24, 2016, 15:52: Roughing 710.0 T.

Monday, October 24, 2016, 15:54: BV1B opened.

Monday, October 24, 2016, 16:00: Rouging 2.0 T.

Monday, October 24, 2016, 16:10: Turbo pumps available.


Tuesday, October 25, 2016, 08:08: Venting.

Tuesday, October 25, 2016, 08:40: Doors open.

Tuesday, October 25, 2016, 08:50: Roughing.

Tuesday, October 25, 2016, 08:51: Doors sealed for roughing.

Tuesday, October 25, 2016, 08:52: BV1B opened.

Tuesday, October 25, 2016, 09:10: Turbo pumps available & started.

Tuesday, October 25, 2016, 09:20: Ion gauge on.


Thursday, October 27, 2016, 08:35: Ion Gauge & Turbo pumps off.

Thursday, October 27, 2016, 11:44: Venting.

Attachment 1: Exhaust_pump_down.docx
  554   Monday, November 28, 2016, 15:39 Aaron Schmidt      In progressPump down empty chamber/Check Exhaust

Monday, November 28, 2016, 15:35: Begin roughing. Monitor exhaust mesh cover. 

*Cover was found on the ground earlier today and re-attached*

 Monday, November 28, 2016, 15:55: Exhaust mesh OK. Roughing continued.


Tuesday, November 29, 2016, 14:55: Test partially vented. @ around 550 T. Roughing restarted. Test delayed until tomorrow.


Wednesday, November 30, 2016, 07:23: Venting

  667   Thursday, June 07, 2018, 09:21 Aaron Schmidt      Problems/SolutionsPump down empty chamber. Anode check

TM2 Source tray still in.

Thursday, June 07, 2018, 09:20: Roughing.

Thursday, June 07, 2018, 12:42: Turbo pumps started.


Friday, June 08, 2018, 08:00: Anode run to 15 A. Short still apparent.

Friday, June 08, 2018, 08:12: Ion gauge, Turbos off.

Friday, June 08, 2018, 08:55: Venting.

Friday, June 08, 2018, 09:45: Anode connection investigated. Short found on the bracket once the anode wire was disconnected from the back screw (Picture)

Friday, June 08, 2018, 10:00: Removed 9-pin bracket. (Top connector left connected to TS. (Picture)

New Anode 9-pin connection/wire to be installed on the bracket. Test in the cold lab.

Friday, June 08, 2018, 10:12: Roughing.

Friday, June 08, 2018, 11:14: Turbo pumps started.

Friday, June 08, 2018, 12:31: Ion gauge on.


Tuesday, June 12, 2018, 06:18: Ion gauge & Turbo pumps off.

Tuesday, June 12, 2018, 07:40: Venting.

Attachment 1: 20180608_100402.jpg
20180608_100402.jpg
Attachment 2: 20180608_100835.jpg
20180608_100835.jpg
Attachment 3: 20180608_100840.jpg
20180608_100840.jpg
Attachment 4: 20180613_080550.jpg
20180613_080550.jpg
Attachment 5: 20180613_080605.jpg
20180613_080605.jpg
  558   Tuesday, January 03, 2017, 08:27 Aaron Schmidt       Pump down empty chamber. (Restart. Post holidays)

Tuesday, January 03, 2017, 08:26: TSG : RP1 & TMS : RP2 restarted.


Wednesday, January 04, 2017, 11:18: TSG : PV1 & TMS : PV2 opened.

Wednesday, January 04, 2017, 11:19: TSG : BV1A & TSG : BV1B opened. TMS : BV2 & TMS : BV6 open.

Wednesday, January 04, 2017, 11:25: Turbo pumps TSG : TP1A & TP1B on. Monitor startup.

Wednesday, January 04, 2017, 11:31: TSG : IG1 on. TP1B @ speed.

Wednesday, January 04, 2017, 11:34: TSG : TP1A @ speed

Wednesday, January 04, 2017, 11:35: Turbo pumps TMS : TP2 & TP6 on. Monitor Startup.

Wednesday, January 04, 2017, 11:40: Both Turbo pumps @ speed. TMS : IG6 on.


Friday, January 13, 2017, 08:49: Ion gauge off, Turbos off.


Wednesday, January 18, 2017, 08:28: Venting.

  580   Tuesday, May 02, 2017, 14:03 Aaron Schmidt       Pump down empty chamber. (FS#3 out)

Check to fit lines FS#3

Tuesday, May 02, 2017, 14:00: Rouging. 


Wednesday, May 03, 2017, 07:07: Venting.

Check final fit. Mark up FS#3.

Wednesday, May 03, 2017, 08:11: Roughing.

Wednesday, May 03, 2017, 12:42: Venting.


Thursday, May 04, 2017, 13:35: FS#3 re-installed.

Thursday, May 04, 2017, 13:47: Roughing  w/ UC#20 IG-LIS heat shield.

Attachment 1: 20170504_133718.jpg
20170504_133718.jpg
Attachment 2: 20170504_133723.jpg
20170504_133723.jpg
Attachment 3: 20170504_133728.jpg
20170504_133728.jpg
Attachment 4: 20170504_133735.jpg
20170504_133735.jpg
  583   Wednesday, May 10, 2017, 15:07 Aaron Schmidt       Pump down empty chamber. (FS#3 out)

FS#3 lines blanked off.

Wednesday, May 10, 2017, 14:40: Roughing

Wednesday, May 10, 2017, 15:05: Turbos on.

Wednesday, May 10, 2017, 15:10: Ion gauge on.


Disconnect Leak detector. Connect He to FS#3 (G) line.

Thursday, May 11, 2017, 07:44: RGA on.

Thursday, May 11, 2017, 08:23: Vacuum @ 1.85e-06T. He line pressurized to 50 PSI. Monitor RGA.

Thursday, May 11, 2017, 09:07: No response on RGA. Vacuum @ 1.85e-06T. Purge Helium.

Hook up dry system leak detector to leak check valve behind turbo.

Leak rate: 0.0e-09 atm-cc/sec on detector. T.P: 0.0e-04T.

Thursday, May 11, 2017, 09:18: Open check valve. Vacuum ok @ 1.76e-06T

Base leak rate: 2.5e-09 atm-cc/sec.

Thursday, May 11, 2017, 09:25: Open He & Pressurize to 50 PSI.

Thursday, May 11, 2017, 09:30: Base leak rate dropping slowly: 2.0e-09 atm-cc/sec. No leak detected. No response on RGA.

Thursday, May 11, 2017, 09:35: Base leak rate dropping slowly: 1.7e-09 atm-cc/sec. No leak detected. No response on RGA.

Thursday, May 11, 2017, 09:45: Base leak rate Ok: 1.7e-09 atm-cc/sec. No leak detected. No response on RGA. Close check valve. Purge line. Vent detector.

Leak detector on. Leak rate: 0.0e-09 atm-cc/sec on detector. T.P: 0.0e-04T.

Thursday, May 11, 2017, 13:24: Open check valve. Vacuum @ 1.41e-06T

Base leak rate: @.2.0e-09 atm-cc/sec.

Thursday, May 11, 2017, 13:30: Open He & Pressurize to 50 PSI.

Thursday, May 11, 2017, 13:37: Base leak rate dropping slowly: 1.0e-09 atm-cc/sec. No leak detected. No response on RGA.

Thursday, May 11, 2017, 13:40: Base leak rate Ok: 0.1e-09 atm-cc/sec. No leak detected. No response on RGA. Vent He.

Connect spray nozzle to He. Vacuum issue noticed on RGA: N & O. Check for leak on Chamber


Tuesday, May 16, 2017, 08:45: RGA off. Ion gauge off. Turbos off

Tuesday, May 16, 2017, 09:50: Venting

Attachment 1: 05-11-2017_Water_leak.docx
  557   Wednesday, November 30, 2016, 10:16 Aaron Schmidt       Pump down empty chamber. (Close off for holidays)

Wednesday, November 30, 2016, 10:16: Roughing

Wednesday, November 30, 2016, 11:05: Turbo pumps on.

Wednesday, November 30, 2016, 11:13: Ion gauge on.


Thursday, December 15, 2016, 09:19: TMS : IG6 off. TSG : IG1 off.

Thursday, December 15, 2016, 09:20: TMS : BV6 & BV2 off. TSG : BV1A, & BV1B off. Turbo pumps TMS : TP6 & TP2 off. TSG : TP1B & TP1A off.


Friday, December 16, 2016, 07:59: Roughing pumps shut down. Test stand closed for the holidays.

  516   Monday, June 20, 2016, 14:36 Aaron Schmidt       Pump down empty chamber.

Monday, June 20, 2016, 12:50: roughing down

Monday, June 20, 2016, 14:30: Turbo pumps on. Ion gauge on.


Monday, June 27, 2016, 09:00: Ion gauge off. Turbo pumps off.

  519   Wednesday, June 29, 2016, 16:28 Aaron Schmidt       Pump down empty chamber.

Wednesday, June 29, 2016, 16:28 : Roughing


Thursday, June 30, 2016, 08:44: Turbo pumps on.


Thursday, July 07, 2016, 13:11: Turbo pumps off. Ion gauge off.


Monday, July 11, 2016, 12:50: Venting. ERROR on PuTTY.

Monday, July 11, 2016, 13:05: IOC WHITEOUT?

Monday, July 11, 2016, 13:25 All returned to normal.

  527   Thursday, July 28, 2016, 11:12 Aaron Schmidt       Pump down empty chamber.

Thursday, July 28, 2016, 10:00 Roughing.

  536   Monday, August 29, 2016, 10:08 Aaron Schmidt       Pump down empty chamber.

Monday, August 29, 2016, 10:07: Roughing.


Friday, September 02, 2016, 14:33: Venting

  550   Wednesday, November 16, 2016, 10:50 Aaron Schmidt       Pump down empty chamber.

Wednesday, November 16, 2016, 10:50: Begin roughing.

Wednesday, November 16, 2016, 11:52: Turbo pumps on.

*Note* Unusual sound noticed right at the start up of TSG : TP1B. It was first noticed prior to venting UC#18. The sound only lasts 10-15 seconds within a minute of starting the pump. An odd whine with tapping sound. Operation is otherwise normal, but will continue to monitor the pump.

Wednesday, November 16, 2016, 11:57: Ion gauge on.

Wednesday, November 16, 2016, 12:03: Both pumps are at speed


Thursday, November 24, 2016, 10:08: Ion gauge & Turbo pumps off.

Thursday, November 24, 2016, 11:07: Venting.

  562   Monday, January 23, 2017, 15:30 Aaron Schmidt       Pump down empty chamber.

Monday, January 23, 2017, 15:30: Roughing


Wednesday, January 25, 2017, 09:05: Venting

  593   Friday, June 16, 2017, 11:23 Aaron Schmidt       Pump down empty chamber.

Friday, June 16, 2017, 11:22: roughing.

Friday, June 16, 2017, 14:28: Turbo pumps on


Friday, June 30, 2017, 10:37: Ion gauge, turbos off.

Friday, June 30, 2017, 13:01: Venting.

  611   Monday, October 16, 2017, 11:46 Aaron Schmidt      In progressPump down empty chamber Test EE

Monday, October 16, 2017, 11:45: Roughing.

Monday, October 16, 2017, 12:05: Turbo pumps started.

Monday, October 16, 2017, 12:10; Ion gauge on.


Tuesday, October 17, 2017, 10:43: Waterlines opened. RGA not on. Vacuum ok @ 1.53e-07T. Power/sources on.

Tuesday, October 17, 2017, 10:45: RGA on.

Tuesday, October 17, 2017, 10:50: BIAS / EZL / EE @ 30 / 13 / 1.5 kV .

   

      

Tuesday, October 17, 2017, 14:44: EE Current Stable.

Tuesday, October 17, 2017, 14:52: Power/sources off.

Tuesday, October 17, 2017, 14:54: Waterlines purged.

 

 

  820   Tuesday, November 10, 2020, 12:13 Aaron Schmidt    43044-1344378-1In progressPump down empty chamber / Leak.

U-Loop installed on FS#5

Tuesday, November 10, 2020, 12:13: Roughing.

Tuesday, November 10, 2020, 12:57: TP1B on


TS Tripped Thursday am. Leak noted Thursday am remotely. Control room noted water in the chamber.

Friday, November 13, 2020, 06:40: Confirmed. Cleanup

Friday, November 13, 2020, 08:30: FS#4 TBHT (A). Visible water dripping out from the water block. Line (A) removed.

Friday, November 13, 2020, 10:25 Set up Fan. Clean.

Removed, cleaned & leak checked (A) & (B).

(A) leaks at seat and solder

(B) OK.

Closed ballast on RP1. Lines stable.

Friday, November 13, 2020, 12:51: TS chamber to continue to air dry over the weekend.


Monday, November 16, 2020, 09:00: TBHT (B) line is installed. (A) blanked off. Roughing BV1A open.

Monday, November 16, 2020, 09:07: BV1B opened.

Monday, November 16, 2020, 11:41: Vacuum @ 1.965T. Open RP1 ballast. W/ Filter cap

Monday, November 16, 2020, 11:49: Vacuum @ 1.170 and dropping.


Wednesday, November 18, 2020, 10:16: Vacuum At 0.201T. Venting. 

TBHT line (A) repaired and leak checked. Installed in TS. HS w/ horizontal tube oven installed for out gassing.

HS: 44378-1 (SIS Config)

Oven: 43044-13

Wednesday, November 18, 2020, 14:02: Roughing.

Wednesday, November 18, 2020, 14:45: TP1B on. 

Wednesday, November 18, 2020, 15:54: TP1A on. 

Wednesday, November 18, 2020, 16:03: IG1 on. 

Wednesday, November 18, 2020, 19:05: Power bump shut down TS. Controls in whiteout. Restart attempt

Wednesday, November 18, 2020, 19:29: TP1B on. 

Wednesday, November 18, 2020, 20:22: TP1A on. 

Wednesday, November 18, 2020, 20:31: IG1 on 


Thursday, November 19, 2020, 11:57: Vacuum @ 3.32e-06T.

Thursday, November 19, 2020, 11:58: Opened FS#2, FS#3 & FS#5. Vacuum ok

Thursday, November 19, 2020, 12:01: Opened FS#4..

Thursday, November 19, 2020, 12:03: Vacuum ok @ 3.32e-06T.

Thursday, November 19, 2020, 12:07: Power / sources on.

Thursday, November 19, 2020, 12:08: Restarted IOC/PLC.

Thursday, November 19, 2020, 12:13: Auto-ramping TGHT to 200 A @ 1 A per min.

Thursday, November 19, 2020, 15:58: Auto-ramping TGHT to 350 A @ 1 A per min. 

Thursday, November 19, 2020, 17:35: Bypass TMS:PV1 open/close. leave as is. remove Bypasses. 


Friday, November 20, 2020, 07:35: Auto-ramping TGHT to 580 A @ 1 A per min. 


Saturday, November 21, 2020, 12:32: Check. Vacuum @ 4.13e-06T . TGHT @ 494 A. 


Monday, November 23, 2020, 09:53: Check. Vacuum @ 2.97e-06T . TGHT @ 580 A.

On the beamline side:

https://elog.triumf.ca/TIS/Test-Stand/821

Monday, November 23, 2020, 14:03: Check. Vacuum @ 2.73e-06T . TGHT @ 580 A.


Tuesday, November 24, 2020, 12:58: Auto-cooling @ 0.5 A per min. 


Wednesday, November 25, 2020, 09:30: Sources/power off. IG1 & Turbo pumps off.

  1024   Monday, October 07, 2024, 09:54 Aaron Schmidt       Pump down empty chamber / IG6 fix

 Monday, October 07, 2024, 09:54: Roughing. U-Line installed on HS waterline.

Monday, October 07, 2024, 10:34: Vent Chamber. TP6 & TP2 off.

  900   Thursday, September 23, 2021, 07:16 Aaron Schmidt       Pump down empty chamber & reboot

Thursday, September 23, 2021, 07:15: Roughing. Waterline loop installed.


Monday, September 27, 2021, 10:35: MB1 off. Turbo pumps, IG, RP, all off/closed. DI water closed/purged.

TS shutdown for planned power outage.


Friday, October 01, 2021, 06:03: Roughing pumps on.

Friday, October 01, 2021, 06:04: Roughing TS beam line side.

Friday, October 01, 2021, 06:52: TMS:TP6 & TMS:TP2 on. Venting Chamber side.

Friday, October 01, 2021, 06:57: IG6 on - Filament 2 manually set. Beam line side vacuum @ 1.5e-05T

Friday, October 01, 2021, 07:01: Vacuum @ 9.04e-06T & dropping steady (Beam line side) OK.

Friday, October 01, 2021, 07:05: Reboot ISAC TS PLC/IOC. Reset controls whiteout.

Friday, October 01, 2021, 07:10: MB1 restart ok.