Entry  Thursday, May 08, 2014, 15:09, Anders Mjos, , , , , , , Problems/Solutions, SOURCES archiver reported stopped 

 Archiver restarted.

Entry  Friday, May 09, 2014, 10:48, Anders Mjos, , , , , , , Problems/Solutions, EPICS white-out e-fault 7380 

Monday, May 12, 2014, 10:02: Jane R. power cycled the hardware. EPICS is back up. Sources archiver required a restart.

Entry  Thursday, May 15, 2014, 14:58, Anders Mjos, , , , , , , Problems/Solutions, IOC rebooted to recover from white-out. 

Restarted archivers.

Entry  Tuesday, May 20, 2014, 11:17, Anders Mjos, , , , , , , Problems/Solutions, Burnt off GND connection on Service Cap 

The ground connection between B and F (ISK4523D Rev 6) was found burnt off. It will be switched out as per CATHODE BIAS configuration (ISK4563D Rev 3) by Ray D.

Entry  Tuesday, May 20, 2014, 12:39, Anders Mjos, , , , , , , Done, FEBIAD Cathode Negative BIAS configuration 

As per ISK4562 Rev 3 and ISK4563 Rev 3

By Ray D. and co.

    Reply  Thursday, June 12, 2014, 09:28, Anders Mjos, , , , , , , Problems/Solutions, Elevated backing pressure on ISAC Test Stand TMS:RP2 

Anders Mjos wrote:

The performance of the roughing pump has gradually gone down. Notably after the system has been vented. See attached screenshot from the archiver.

E-fault 7258.

 

 Edi replaced the backing pump on June 5th.

Entry  Monday, June 16, 2014, 09:12, Anders Mjos, , , , , , , In progress, Empty chamber 

Monday, June 16, 2014, 09:12: Roughing


Tuesday, June 17, 2014, 14:38: Venting 

Entry  Wednesday, June 18, 2014, 09:23, Anders Mjos, , , , , , , Problems/Solutions, TSH:MB1 Trip & MB1 June 10th water leak 

A water leak on MB1 was found and reported by operations on June 10th e fault 7429

MB1 can not be switched on due to an TSH:MB1 water flow trip. Paddle wheel is rotating.

Wednesday, June 18, 2014, 14:03: Paddle wheel replaced with a used one from beam lines. Model SST150. Signal recovered.

Entry  Thursday, June 19, 2014, 10:48, Anders Mjos, , , , , , , Problems/Solutions, FC0 did not retract from beam line 

Upon inspection it was found that the bolt attaching the FC to the actuator had fallen off. The bolt was reattached and FC0 can be actuated in/out again.

Entry  Friday, June 20, 2014, 11:44, Anders Mjos, , , , , , , In progress, Pumping down empty chamber 

Friday, June 20, 2014, 11:44: Roughing

Friday, June 20, 2014, 13:00: Strarting turbos 

Friday, June 20, 2014, 13:09: Turbos at speed.

Friday, June 20, 2014, 13:10 : Vacuum at 1.3E-5


Thursday, June 26, 2014, 08:52 : Turbos stopped. Vacuum at 1.3E-7 T

Thursday, June 26, 2014, 15:34: Venting 

Entry  Tuesday, July 08, 2014, 09:05, Anders Mjos, , , , , , , In progress, Empty chamber 

Tuesday, July 08, 2014, 09:05: Roughing

Tuesday, July 08, 2014, 13:23: Starting turbos

Tuesday, July 08, 2014, 13:30 : Turbos at speed

Tuesday, July 08, 2014, 13:33 : Vacuum at 2.8E-6 T

Entry  Wednesday, July 09, 2014, 14:08, Anders Mjos, , , , , , , Problems/Solutions, FEBIAD ANODE current readback 

The read back of the ANODE current was confirmed to be working today with help of Ray D. using a 1kOhm resistor. There is an offset in the read back which can explain why no current was seen on SiC#30. The resistor between CATHODE and GND was changed from 100 kOhm to 50kOhm.

Entry  Friday, July 18, 2014, 08:19, Anders Mjos, , , , , , , , Venting 

Friday, July 18, 2014, 08:19: Stopped turbos

Friday, July 18, 2014, 10:58: Venting

Entry  Wednesday, July 23, 2014, 14:34, Anders Mjos, , , , , , , In progress, Empty chamber 

Wednesday, July 23, 2014, 14:34: Roughing
Wednesday, July 23, 2014, 15:03: Starting turbos.
Wednesday, July 23, 2014, 15:11: Turbos at speed
Wednesday, July 23, 2014, 15:13: Vacuum at 7.4E-6 T

Entry  Friday, August 01, 2014, 08:39, Anders Mjos, , , , , , , Problems/Solutions, TMS:RP2 noisy 

Friday, August 01, 2014, 08:39: Backing pressure 0 / 11 mT

Entry  Tuesday, August 12, 2014, 09:52, Anders Mjos, , , , , , , Problems/Solutions, RTD installed on Supply water 2014-08-12_Dataq_Screen_Shot.pngDataq_Supply_Temperature_calibration_2014-08-20.docx

Travis assisted in installing a temperature reading RTD from Omega (SA1-RTD-MTP) on the water supply. The RTD has been installed with a 503 Ohm resistor => 0V = -175.75 C, 10V = 205.71 C. The RTD has been connected to Ch 9 on the data logger.

Offset calibration data towards the SUPPLY temperature reading is attached.

Entry  Thursday, August 14, 2014, 08:45, Anders Mjos, , , , , , , Problems/Solutions, FC0 reading full current FC0FullScaleReading_2014-08-14.pngFC0FullScaleReading_EPICS_2014-08-14.png

since yesterday around 19h. See attached screen shot of archived data

Thursday, August 14, 2014, 08:40: Rebooted IOC. Still reading full scale only. FC0 reads full scale with signal cable removed.

e-fault 7545

Thursday, August 14, 2014, 11:28: Graham called to inform me that all of the 8 channels on the module was reading high. TRIUMF does not have a spare. He will arrange to have the module repaired.


Tuesday, August 19, 2014, 16:27: Graham has brought the system back into operation with a new vqsx module from the ICB stand.

Entry  Wednesday, August 20, 2014, 16:25, Anders Mjos, , , , , , , Problems/Solutions, Lost power on TGHT, TBHT and EE simultaniously  

Possible controls problem. Breaker 18 found latched. Can not be re-energized. Burnt smell in PLC / HV area. e-faut 7561


Thursday, August 21, 2014: Dave Morris had a look and was able to isolate the problem to be with one of the low voltage power supplies in the PLC panel.


Friday, August 22, 2014: New 12V and 24V power supplies installed. PLC cabinet vacuumed. A new 24V fan with filter will also be installed.


Tuesday, August 26, 2014: Power restored to PLC cabinet. System is operational again.

Entry  Wednesday, August 27, 2014, 12:55, Anders Mjos, , , , , , , Problems/Solutions, Water leak on MB1 

e-faulted by operations Aug 26th

Entry  Monday, September 08, 2014, 16:23, Anders Mjos, UC#11, , , TM4, 40282-5, , Done, UC#11 Heat Shield Conditioning Thermocouples.xlsx

T/C installed

CH 1: Attached to TGHT outside middle
CH 2: Through HS outside TGHT right
CH 3: Through HS inside TGHT  right
CH 4: Attached to HS on left gripper. Does not read temp

Monday, September 08, 2014, 16:22: Roughing

Monday, September 08, 2014, 16:43: Started turbos

Monday, September 08, 2014, 16:51: Turbos at speed

Monday, September 08, 2014, 16:53: Vacuum at 2.7E-5 T


Tuesday, September 09, 2014, 08:20 : Opened HS water supply. Vacuum stable at 3.7E-7 T

Tuesday, September 09, 2014, 08:21: Starting auto ramping. TGHT to 580 A at 2A/min

Tuesday, September 09, 2014, 08:50 :

Device Flow
[lpm]
Temp
[C]
HS + MSP 3.8 26.7
TBHT 6.5 26.2
COIL + EE 5.3 26.9
TGHT 5.8 26.3
SUPPLY   27.0

 


Wednesday, September 24, 2014, 11:30: T/C attached to tube does no longer read a correct temperature. Cooling down.


Thursday, September 25, 2014, 08:50: Turbos stopped.

Thursday, September 25, 2014, 11:07: Venting

Thursday, September 25, 2014, 14:00: Heat shield removed