ID Date Author Target/No.# Source Station Module Target Oven W.O# Heat Shield W.O# Status Subjectdown Text Attachments
  398   Tuesday, August 12, 2014, 09:52 Anders Mjos      Problems/SolutionsRTD installed on Supply waterTravis assisted in installing a temperature
reading RTD from Omega (SA1-RTD-MTP) on the
water supply. The RTD has been installed
 2014-08-12_Dataq_Screen_Shot.pngDataq_Supply_Temperature_calibration_2014-08-20.docx 
  862   Wednesday, March 10, 2021, 14:28 Aaron Schmidt      In progressRP2 swap.Swapped RP2 out from a Varian SH-110 to
a Varian PTS06001.
Wednesday, March 10, 2021, 14:20:
  
  463   Monday, September 14, 2015, 08:38 Anders Mjos      Problems/SolutionsRP2 increased pressure e-fault submitted and vacuum group
(Edi) notified.
Monday, September 14, 2015, 09:33:
  
  821   Monday, November 23, 2020, 10:03 Aaron Schmidt      Problems/SolutionsRP2 Check / pump down issueTMSRP2 has been struggling since the power
bump occurred Nov 18, 2020
Monday, November 23, 2020, 09:48:
 20201123_114110.jpg20201123_120204.jpg20201123_120208.jpg20201123_131124.jpg20201123_131127.jpg 
  894   Monday, August 23, 2021, 09:55 Fernando Maldonado      Problems/SolutionsRP1 changed back Monday, August 23, 2021, 09:53: RP1
was swapped back to our original pump. (see e-log
  
  808   Tuesday, August 18, 2020, 12:07 Aaron SchmidtTest FEBIADHP-FEBIAD  38295-842752-5In progressRP check & Mass magnet check.Tuesday, August 18, 2020, 12:05: RP1 on
Tuesday, August 18, 2020, 12:10:
RP1 off
  
  747   Friday, July 19, 2019, 13:48 Fernando Maldonado      Problems/SolutionsRMP0A and FC6 gains signal redirection to another channelAfter submitting a fault report (FR - ISAC
Fault 12461) a Work Permit was issued (WP
- C2019-07-19-1),
  
  895   Monday, August 23, 2021, 10:49 Aaron Schmidt - Fernando Maldonado      Problems/SolutionsRGA replaced with a blind flangeMonday, August 23, 2021, 10:49: Aaron
removed the Extorr RGA and install a blind
instead.
  
  669   Tuesday, June 19, 2018, 10:30 Aaron Schmidt      DoneRGA repairMonday, June 18, 2018, 10:00: RGA removed
from ISAC TS. Handed to Travis C. Communications
issues found
  
  424   Tuesday, February 03, 2015, 09:40 Anders Mjos      Problems/SolutionsRGA installationTuesday, February 03, 2015, 09:40: Venting
RGA installed on the 12" CF
port below the Source Tray.
 2015-02-04-1340.png 
  682   Friday, August 31, 2018, 10:16 Aaron Schmidt      Problems/SolutionsRGA connection loss.Friday, August 31, 2018, 10:10: The RGA
will not re-connect to the computer. Manually
turned it off while under vacuum to protect
  
  698   Wednesday, December 05, 2018, 10:22 Aaron Schmidt      Problems/SolutionsRGA Filament & Ionizer replacementRGA Ionizer & Filament replaced as
per SRS RGA manual.
The ionizer was found to be dirty
 12x 
  778   Tuesday, January 21, 2020, 13:45 Aaron Schmidt      Problems/SolutionsRGA Communications errorTuesday, January 21, 2020, 13:42: The RGA
was unable to connect. Typically connects
on COM4, however it did not register. RGA
  
  288   Monday, March 25, 2013, 16:50 Sebastian Raeder      Problems/SolutionsRFQ powersupplies removed - Anode PS still connected to groundThe powersupplies added to the teststand
for operation of the IGLIS source have been
removed from the HV cage as well as the RFQ
  
  113   Thursday, June 28, 2012, 15:14 Aurelia Laxdal LP-FEBIAD     Quick checkJust a quick check at the Test Stand:
1. The system operational ( 
white out not present ) with TSH:TBHT heating
  
  76   Wednesday, April 18, 2012, 13:10 Anders MjosNo target     In progressPumping down empty vacuum chamberWednesday, April 18, 2012, 13:10: Roughing
the vacuum chamber.
Wednesday, April 18, 2012, 13:34
  
  500   Tuesday, March 29, 2016, 14:44 Aaron Schmidt       Pumping down empty chamber.Tuesday, March 29, 2016, 14:43: Roughing.

 Wednesday, March 30,
2016, 14:33: Venting   -AM
  
  511   Friday, June 03, 2016, 14:50 Aaron Schmidt       Pumping down empty chamber.Friday, June 03, 2016, 14:50: Turbo pumps
started.
Friday, June 03, 2016, 15:22: 
  
  99   Thursday, May 17, 2012, 15:14 Anders Mjos       Pumping down empty chamberThursday, May 17, 2012, 15:14: Started
roughing. Cooling lines blanked off.
Thursday, May 17, 2012, 16:52: Starting
  
  205   Friday, September 14, 2012, 16:33 Anders Mjos      In progressPumping down empty chamberFriday, September 14, 2012, 16:33: Roughing
Friday, September 14, 2012, 16:57:
Starting turbos
  